Can I go to the Administration Center for my passport
The Qinghai Tibet railway was completed in two phases. The first phase was started in 1958 and opened to traffic in May 1984. The second phase of the project started on June 29, 2001 and was completed and opened to traffic on July 1, 2006
the Qinghai Tibet railway, abbreviated as the Qinghai Tibet railway, is a class I national railway connecting Xining city of Qinghai Province to Lhasa city of Tibet Autonomous Region. It is one of the four major projects in China in the new century, the first railway leading to the hinterland of Tibet, and the highest altitude and longest route plateau railway in the world
the Qinghai Tibet Railway starts from Xining City, Qinghai Province, passes through Golmud City, Kunlun mountain pass, Tuotuo River, crosses Tanggula Mountain pass, enters Ano, Naqu, Dangxiong, Yangbajing of Tibet Autonomous Region, and ends at Lhasa city of Tibet Autonomous Region, with a total length of 1956km, passing through Qinghai Lake, Kunlun Mountain, Kekexili, Sanjiangyuan, grassland of northern Tibet, potala palace and other scenic spots
the Qinghai Tibet railway is divided into the siger section of the Qinghai Tibet railway and the Golmud Lhasa section of the Qinghai Tibet railway. The siger section of the Qinghai Tibet railway is a double track electrified railway, and the Golmud Lhasa section of the Qinghai Tibet railway is a single track non electrified railway
extended data:
the Qinghai Tibet Plateau, where Lhasa is located, has an average altitude of more than 4000 meters. Before the opening of the Qinghai Tibet railway, most materials can only be transported to Tibet by road and air. On July 1, 2006, the Qinghai Tibet railway was officially put into operation, ending the history of no railway in Tibet
from 2006 to 2012, the Qinghai Tibet Railway Company transported more than 52 million passengers and 240 million tons of goods. The volume of passenger and freight transportation increased from more than 6.4 million person times and 24 million tons in 2006 to more than 10 million person times and 51 million tons in 2011
the Qinghai Tibet railway, starting from Xining City, Qinghai Province and reaching Lhasa City, Tibet Autonomous Region in the west, has a total length of nearly 2000 km. After opening, the speed of the train will reach 120 kilometers per hour on general road sections, and the travel time from Golmud to Lhasa will not exceed 12 hours
driven by the Qinghai Tibet railway, the resource advantage of the Qinghai Tibet Plateau is graally transforming into the real economic advantage, and more and more procts with Tibetan characteristics are going to the world through the Qinghai Tibet railway
我这里有~用网络网盘分享给你,点开就可以保存,链接永久有效^_^链接:
n = 4
I / y = 11 (Note: required rate of return)
PMT = 1000 * 11% = 110 (Note: 11% here is couple rate)
FV = 1000
calculate PV
in this case, the coupon rate of the bond is the same as the required rate of return, so the present value is equal to the face value, PV must be 1000
the specific algorithm, when pressing:
4 N
11 I / y
110 PMT
1000 FV
CPT PV
can.
the Ministry of public security has decided that from July 1, 2013, Beijing, Tianjin, Shijiazhuang, Taiyuan, Hohhot, Shenyang, Dalian, Changchun, Harbin, Shanghai, Nanjing, Hangzhou, Ningbo, Hefei, Fuzhou, Xiamen, Nanchang, Jinan, Qing, Zhengzhou, Wuhan, Changsha, Guangzhou, Shenzhen, Nanning, Haikou The registered residence of city residents in Chongqing, Cheng, Guiyang, Kunming, Xi'an, Wuxi, Changzhou, Suzhou, Wenzhou, Jiaxing, Jiaxing, Jiaxing, Jiaxing, Hui, Hui, and Hui, and their 43 years old registered residence, their children under 16 years of age, and the registered residence, their school and their spouses in the temporary residence of the city. Children under the age of 16 can apply for an ordinary passport nearby. However, the Hong Kong and Macao pass is not included for the time being
