Position: Home page » Computing » Which station does the subway 11 get to the optical valley servi

Which station does the subway 11 get to the optical valley servi

Publish: 2021-04-30 11:14:52
1.

In Wuhan, go to the Optics Valley administration center and get off at the subway station. See photo. You can also get there by bus

2. Unknown_Error
3. The terminal of Metro Line 2 is Optics Valley square. There are many exits in Optics Valley square. We need to determine the destination. Otherwise, the underpass will be very busy.
4.

there is no subway

bus line in this section: No. 625 → No. 556, the whole journey is about 9.3km

1. Walk about 830m from Nanhu to dingziqiao South Road Station of Wenxin road

2. Take No. 625, pass 6 stops, reach Xiongchu Avenue BRT Luoshi Road Station

3. Walk about 50m, reach Xiongchu Avenue BRT Luoshi Road Station

4. Take No. 556, pass 5 stops, Get to Kangfu Road Station on xiongjiazui road

5, walk about 540 meters to Guanggu No.11 primary school

5.

bus line: w408 → Rail Transit Line 2, the whole journey is about 18.9km

1. Walk about 420 meters from Wuhan to Yiyuan Road Station of Shengli Street

2. Take w408 bus, pass 4 stops, and reach Jianghan Road Station of Zhongshan Avenue Subway (you can also take No. 727, No. 24 and No. 2)

3. Walk about 350 meters to Jianghan Road Station

4. Take Rail Transit Line 2, After 11 stops, arrive at optical valley square station

6. 20 subway stations
32.1km km
invest 24.62 billion yuan
the east section from Wuchang railway station to zuoling is line 11, phase I to phase II
the west section from Caixun line to hongmazui to Berlin is phase III
the first phase of the project will be opened on October 1, 2018 together with the first phase of line 7
the second phase will be officially opened in 2018
the third phase will be officially opened in 2020
there is a South extension of line 2 to transfer to Metro; Line 19; Line 4; Line 3; Line 6; Line 21; Loop line of line 12; Line 9; Line 10; Line 7; I hope you can give me a reason
that is the total length of line 11 phase I to phase III is 68 km
I hope line 11 will be open to traffic< However, it will be open to traffic in 2020,
the total length of phase III project is 14.1km, with 8 stations and an investment of 6.988 billion yuan
7.

The construction plan of Wuhan Rail Transit Line 11 is divided into three sections: East, middle and West. The middle section from Wuchang railway station to Hanyang railway station has not been included in the third round of recent planning. The east section is the Metro Line 29, also known as "zuoling line" or "line 29") that attracts the attention of the citizens of Optics Valley: it starts from Liufang in the West and ends at zuoling new town in the East, mainly along Hukou 1st Road and Gaoxin Avenue, passing through Donghu Gaoxin optics Valley area, Liufang area, Baoshu New District and zuoling new town. In the long term, it may extend to Optics Valley square station. From Liufang railway station to zuoling Road station, there are 13 stations, including Liufang railway station, jiaoyuzhong Road station, physical ecation school station, biological Garden Station, Guanggu 4th Road station, Guanggu 5th Road station, Guanggu 6th Road station, Baoshu Road station, Guanggu 7th Road station, Zhengjia Road station, future 1st Road Station, future 3rd road station and zuoling station, which are constructed in the form of subway
according to the environmental impact assessment report, Wuhan plans to start the construction of the east section of line 11 first. The project is an all underground line with a length of about 20 km, which will be transferred to Liufang station of South extension line of planned line 2 and Liufang station of intercity railway, Guanggu No.5 road and planned line 30, and future No.1 road and planned line 9 respectively. The total investment of the project is about 13.88 billion yuan, and the average cost per kilometer is about 700 million yuan. The operation time is 18 hours from 5:00 to 23:00. A type car is selected, and the maximum running speed can reach 100 km / h
the optical valley section of line 11 is a part of the east section of the longest line 11 in Wuhan rail transit line planning, and it is also the first Metro Line invested and constructed by Donghu high tech management committee. Therefore, the high tech Zone has become the first urban area in Wuhan to build its own subway
on October 28, 2014, the optical valley section of Wuhan Rail Transit Line 11, with a total investment of about 14.718 billion yuan, a total length of 19.7 km and a total of 13 stations, was officially started. At the same time, six stations including optical valley railway station, optical valley 4th Road station, optical valley 7th Road station, future 1st Road station and zuoling new city station were under construction, and planned to be completed and opened to traffic from 2018 to 2019. The project is constructed by Wuhan Optical Valley Transportation Construction Co., Ltd., which is the first subway line independently invested and constructed by Wuhan East Lake New Technology Development Zone



the western section is line 24, also known as "Caidian line" or "line 24", which attracts the attention of Caidian citizens. The departure station and terminal station are respectively Zhangwan street in Caidian District and HUANGJINKOU station of Wuhan Metro Line 4 in Hanyang District (changed to new Hanyang railway station after the third round of planning). From Caidian Berlin to new Hanyang railway station, there are six stations, namely, Berlin station, xinfulu station, maoxinglu station, yaojiashan station, Xinnong station and wuxianlu station. Because the new Hanyang railway station is located in Caidian, the route is different from the previously announced route
according to the work report of Wuhan government in 2015, the construction of this section may start in 2015

8. The first train of Metro Line 11; Cloud crane Yellow & quot; It will be debugged in Han at the end of July 2017. The eastern section of the first phase of the tunnel has been completed on June 28, and the rail will be connected on July 31, and the electricity will be connected in September. It is expected that the eastern section of the first phase of line 11 will be opened to traffic by the end of 2017.
9.

bus line: no.758, the whole journey is about 17.7km

1. Take no.758 from the South Gate of the Academy of fine arts, pass 23 stops, and reach the Guanggu Square Station on Minzu Avenue

2. Walk about 230m to the entrance C of Guanggu square subway station

10. I can't find ut download when I download resources from my unit's computer.
Hot content
Inn digger Publish: 2021-05-29 20:04:36 Views: 341
Purchase of virtual currency in trust contract dispute Publish: 2021-05-29 20:04:33 Views: 942
Blockchain trust machine Publish: 2021-05-29 20:04:26 Views: 720
Brief introduction of ant mine Publish: 2021-05-29 20:04:25 Views: 848
Will digital currency open in November Publish: 2021-05-29 19:56:16 Views: 861
Global digital currency asset exchange Publish: 2021-05-29 19:54:29 Views: 603
Mining chip machine S11 Publish: 2021-05-29 19:54:26 Views: 945
Ethereum algorithm Sha3 Publish: 2021-05-29 19:52:40 Views: 643
Talking about blockchain is not reliable Publish: 2021-05-29 19:52:26 Views: 754
Mining machine node query Publish: 2021-05-29 19:36:37 Views: 750