Which subway do you take to go to Xincheng in Yintai Center
as shown in the figure, subway line 2 Sipailou station exit a can be

bus line: Metro Line 1 → No.41, the whole journey is about 14.9 km
1. Walk about 420 meters from Hefei Station to Hefei railway station
2. Take Metro Line 1, pass 6 stations, reach Zhugang station
3. Walk about 280 meters, reach hejiafu Shopping Plaza Station
4. Take No.41, pass 12 stations, reach Huabang World Trade City Station
5. Walk about 30 meters, Arrive at Yintai City, Hefei
Take Metro Line 1, get off at financial city station, exit D, walk about 850 meters to

bus line: Metro Line 1, the whole journey is about 8.9 km
1. Walk about 100 meters from Hefei south station to Hefei South Station
2. Take Metro Line 1, pass 7 stations to Dadongmen station
3. Walk about 910 meters to Yintai Center
bus line: Metro Line 1 → Metro Line 2, the whole journey is about 4.0km
1. Walk about 980m from Xi'an station to Wulukou station
2. Take Metro Line 1, pass 1 station to Beidajie station
3. Take Metro Line 2, pass 1 station to Zhonglou station
4. Walk about 620m to Yintai department store
bus line: Metro Line 1, the whole journey is about 9.1km
1. Walk about 240m from Hefei south station to Hefei South Station
2. Take Metro Line 1, after 7 stops, to Dadongmen station
3. Walk about 970m to Yintai Center, Changjiang Road, Hefei
Take subway line 1, pass 6 stops, and get to longxiangqiao station
Hangzhou Metro Line 1 is the first metro line built and put into operation in Zhejiang Province and Hangzhou city. The first phase of the project (Xianghu station to wenzelu station / Linping station) was put into operation on November 24, 2012, and the second phase of the project (Wenhai South Road station to Xiasha Jiangbin station) was put into operation on November 24, 2015, with the logo color of Haitang red
Hangzhou Metro Line 1 starts from Linping Street Linping station (Linping branch line) in the north, Hangzhou Economic and Technological Development Zone (Xiasha) Xiasha Jiangbin station (Xiasha main line) in the East and Xianghu station in Xiaoshan District in the south, running through Linping sub City, Xiasha sub City, Jiangnan sub City and Hangzhou central city
the total length of Hangzhou Metro Line 1 is 53.62 km, including 6.14 km of elevated line and 47.48 km of underground line. There are 34 stations in total, including 3 elevated stations and 31 underground stations. 6-car B-type train is adopted
on May 30, 2017, Hangzhou Metro Line 1 transported nearly 400 million passengers, with the highest daily passenger volume of 930000
as of May 1, 2019, the daily passenger flow of Hangzhou Metro Line 1 has set a new record, reaching 1.27 million
On April 19, 2006, the national development and Reform Commission of China approved the feasibility study report of Hangzhou Metro Line 1 projecton March 28, 2007, Hangzhou Metro Line 1 phase I project officially started
on April 10, 2011, the double track tunnel between Jiangling Road station and Fuchun Road Station of Hangzhou Metro Line 1 was connected
on April 10, 2012, the main line of Hangzhou Metro Line 1 was run through; On May 6 of the same year, Hangzhou Metro Line 1 was electrified; At 14:30 p.m. on November 24 of the same year, Hangzhou Metro Line 1 was officially put into trial operation (the opening of the east railway station was postponed)
on July 1, 2013, with the operation of Hangzhou east railway station, the east railway station was officially opened
at 10:30 a.m. on November 24, 2015, the Xiasha extension of Hangzhou Metro Line 1 was officially put into trial operation
on December 23, 2016, the national development and Reform Commission of China approved the third phase plan of Hangzhou Metro construction. The third phase project line of Hangzhou Metro Line 1 will be extended from shajiangbin station under line 1 to Xiaoshan Airport Station, with a length of about 11.5 km
on April 17, 2018, the main structures of all stations of Hangzhou Metro Line 1 phase III were started
on March 24, 2020, Hangzhou Metro Line 1 phase III project successfully passed through Hangzhou Xiaoshan International Airport in normal operation. On July 9, the third phase project of Hangzhou Metro Line 1 was completed
on August 24, 2020, Hangzhou Municipal People's government officially approved the station name of Hangzhou Metro Line 1 phase III
