Position: Home page » Computing » How can I get to Chengdu Sports Center by subway

How can I get to Chengdu Sports Center by subway

Publish: 2021-05-03 22:29:13
1.

bus line: Metro Line 1, the whole journey is about 3.8km

1. Take Metro Line 1 from the north railway station, pass through 3 stations to luomashi station

2. Walk about 350m to Cheng Sports Center

2. Take Metro Line 2 (Xipu direction) 6 at Cheng East Railway Station
get off at Chunxi Road station and transfer to Metro Line 3 (Shuangliu west station direction) 3 stations
get off at Provincial Gymnasium station
....
or:

take Metro Line 2 (Xipu direction) 7 at Cheng East Railway Station
get off at Tianfu Square Station and transfer to Metro Line 1 (KE) 3 stops in the direction of Xuecheng
get off at the Provincial Gymnasium station
3.

bus line: Metro Line 2, the whole journey is about 6.8km

1. Walk about 260m from Cheng to Tianfu Square Station

2. Take Metro Line 2, after 5 stops, to Shuhan Road East Station

3. Walk about 1.6km to Jinniu sports center

4.

bus line: Metro Line 2, the whole journey is about 9.0km

1. Walk about 130m from Cheng east station to Cheng East passenger station

2. Take Metro Line 2, pass 7 stops to Tianfu Square station

3. Walk about 700m to Cheng Sports Center


5.

The fastest bus transfer route from Cheng east railway station to Cheng Sports Center is as follows, the fastest time is about 20 minutes

bus line: Metro Line 2, the whole journey is about 9.3 km

1. Walk about 390 meters from Cheng east railway station to Cheng East Railway Station

2. Take Metro Line 2, pass 7 stops, and then reach Tianfu Square Station

3, walk about 680 meters, Arrive at Cheng Sports Center

6. Yes! Cheng Metro Line 1 starts from Dafeng station in the north and ends at Guang station in the south. The total length of the planned line is about 31.6km, with 23 stations, including 18 underground stations, 5 elevated stations, one control center, one parking lot, one depot and two main substations. Metro Line 1 phase I project is the initial construction line of Cheng Metro Line 1, with a total length of 15.998km, starting from honghuayan in the north and reaching Incubation Park in the south. Metro Line 1 phase I project is the initial construction line of Cheng Metro Line 1. It starts from shengxianhu station in the north and ends at shijicheng station in the south, with a total length of 18.5km, all of which are underground lines. It consists of shengxianhu, north railway station, Renmin North Road, Wenshuyuan, luomashi, Tianfu Square, Jinjiang Hotel, huaxiba, Provincial Gymnasium, nijiaqiao, Tongzilin, South Railway Station, Gaoxin, administrative center, Incubation Park, Tongzilin Ocean Park, Century City, etc
7. There are signs
8.

Metro fast

bus line: Metro Line 2, the whole journey is about 25.7km

1. Walk about 1.0KM from Longquanyi District to Longquanyi station

2. Take Metro Line 2, pass 17 stops, and reach Tianfu Square Station

3. Walk about 690m to Cheng Sports Center

9. Gaotouyao coal mine belongs to the integration of coal and electricity enterprises, the pressure of coal sales is not big, but because of low output, poor coal quality, coal... So the cost and profit of Gaotouyao coal preparation plant and other business indicators depends on the proction of Gaotouyao coal mine
Hot content
Inn digger Publish: 2021-05-29 20:04:36 Views: 341
Purchase of virtual currency in trust contract dispute Publish: 2021-05-29 20:04:33 Views: 942
Blockchain trust machine Publish: 2021-05-29 20:04:26 Views: 720
Brief introduction of ant mine Publish: 2021-05-29 20:04:25 Views: 848
Will digital currency open in November Publish: 2021-05-29 19:56:16 Views: 861
Global digital currency asset exchange Publish: 2021-05-29 19:54:29 Views: 603
Mining chip machine S11 Publish: 2021-05-29 19:54:26 Views: 945
Ethereum algorithm Sha3 Publish: 2021-05-29 19:52:40 Views: 643
Talking about blockchain is not reliable Publish: 2021-05-29 19:52:26 Views: 754
Mining machine node query Publish: 2021-05-29 19:36:37 Views: 750