Position: Home page » Computing » How to get to the sports center from the cinema

How to get to the sports center from the cinema

Publish: 2021-05-05 05:47:54
1. The smile of rebirth, the author: lonely ant

rebirth, dream come true
if you win 50 million, what will you do? Buy two bowls of soybean milk and two bowls of fried dough sticks
Li Zhiyang was reborn and won a grand prize of 50 million yuan without accident
he had no ambition. He wanted to buy a few houses honestly, be a charterer safely, and live as a secretary in a few days
it's a pity that fate played a joke on him and once again involved him in the whirlpool. Is it like the previous life, holding his nose, being bullied by fate honestly, or striving to fight against fate bravely
let's see how Li Zhiyang sits in the clouds and laughs at the rise of the storm....
2. Eight hours
3. Data show that BNB's historical revenue has been 370 times since 1CO, up 37002.54%. Even from March this year, it has increased by 3.2 times. BNB is the only platform currency whose market value is in the top ten. BNB has a lot of opportunities tomorrow.
4. Forget it, I advise you! It's ok if you know what you're doing. Hydraulic pressure will not work in 7000 hours or so! 27w!
5. It's the time to stop for rest and maintenance

bulldozers can be divided into the following two types according to the installation form of bulldozer plate
1) fixed blade bulldozer: the bulldozing blade of bulldozer is fixed at right angles to the longitudinal axis of the main engine, which is also called suitable blade bulldozer. Its mechanism is simple, but it can only push the soil in the forward direction with poor operation flexibility. It is only used for small and medium bulldozers
2) rotary blade bulldozer: the bulldozer blade can rotate at a certain angle in the horizontal plane, and can be installed at a fixed right angle or non right angle with the longitudinal axis of the main engine, which is also called angle blade bulldozer. This kind of bulldozer has a wide range of operation, which is convenient for moving soil to one side and excavating side ditch.
6. 1. Check the position of the mp truck and soil sampling, and determine the position of the machine before construction; Combined with the action essentials of digging: after the two arms are fully opened and the bucket mouth is basically parallel to the two arm boom, drop the bucket on the ground, recover the two arms until they are basically vertical to the ground, stop, lift the boom and retract the bucket at the same time of retracting the two arms to make the bucket full and flat, lift the boom to make the bucket bottom off the ground and rotate, Rotate to the middle of the car, then open the bucket, retract the second arm and lift the boom to unload the soil in the middle of the car. Note: do not rotate too fast, do not scratch, do not touch, do not hit the vehicle. When loading, it should be unloaded from the middle to the three sides or from the back, without leakage, and the bucket should not rotate from the cab or personnel

open the network app to view more high-definition pictures
2. The excavator body should be in a horizontal and stable position, otherwise it is difficult to accurately control the rotary unloading, thus prolonging the operation cycle time; Keep a proper distance between the excavator body and the truck to prevent the excavator from being damaged ° When turning, the tail of the body collides with the truck; Try to carry out left slewing loading; In this way, the field of vision is wide and the operation efficiency is high. At the same time, the rotation angle should be correctly mastered to rece the time for rotation; The truck position should be lower than the excavator to shorten the boom lifting time and have a good field of vision; First load sand, gravel, and then place large stones, which can rece the impact on the car
3. During lifting operation, confirm the surrounding conditions of the lifting site, use high-strength hook and wire rope, and use special lifting device; The operation mode should be micro operation mode, and the action should be slow and balanced; If the length of the rope is appropriate and too long, the swing of the object will be large and difficult to control accurately; Adjust the position of the bucket correctly to prevent the wire rope from slipping off; Construction personnel should not be close to the lifting objects to prevent danger e to improper operation
4. The loading process of Tipper can be divided into four processes: digging, boom lifting and slewing, mping and lowering boom slewing. There are two main methods of loading mp truck with excavator: backhoe loading method and rotary loading method
A. backhoe loading method. It is the excavator that loads the truck from the foundation higher than the tipper. This method has high efficiency, good vision and easy loading
when loading with this method, the height of the platform can be set to be the same as or slightly higher than that of the mper carriage, and the platform should be flat and firm
when reversing, pay attention to the position of the bucket. When the bucket reaches an easily observed position, the excavator will sound to stop< B. rotary loading method. When the excavator and Tipper are loaded on the same level foundation, the body of the excavator must rotate. The working efficiency of this method is lower than that of the reverse loading method, and it is only used when the site conditions are limited

5. In the process of operation, when the boom is lifted and rotated, the bucket should be raised by 90% ° The height of Tipper in turning. The field of vision of left turn is better, and it is easy to load. Generally, the loading sequence is from the front of the car in the order of (1) and (6), which is not only convenient for loading, but also can ensure the visual field
6. During loading, after digging and shoveling, the boom is lifted and rotated for standby. In the meantime, the mper reverses while paying attention to the position of the bucket. When the bucket reaches the front of the mper, the excavator will sound the horn to stop. Dumper body should be perpendicular to the track.
7. You can log out first and then try to register or contact the next platform
8. Suzhou micro police has no problem in paying the fine. Generally, after paying the fine for one or two hours, it will become paid after confirmation. Wait patiently
9.

bus line: Metro Line 2, the whole journey is about 4.0km

1. Walk about 210m from Shanghai Science and Technology Museum to Shanghai Science and Technology Museum Station

2. Take Metro Line 2, pass 2 stations to Dongchang Road Station

3. Walk about 710m to Shanghai global financial center

Hot content
Inn digger Publish: 2021-05-29 20:04:36 Views: 341
Purchase of virtual currency in trust contract dispute Publish: 2021-05-29 20:04:33 Views: 942
Blockchain trust machine Publish: 2021-05-29 20:04:26 Views: 720
Brief introduction of ant mine Publish: 2021-05-29 20:04:25 Views: 848
Will digital currency open in November Publish: 2021-05-29 19:56:16 Views: 861
Global digital currency asset exchange Publish: 2021-05-29 19:54:29 Views: 603
Mining chip machine S11 Publish: 2021-05-29 19:54:26 Views: 945
Ethereum algorithm Sha3 Publish: 2021-05-29 19:52:40 Views: 643
Talking about blockchain is not reliable Publish: 2021-05-29 19:52:26 Views: 754
Mining machine node query Publish: 2021-05-29 19:36:37 Views: 750