Position: Home page » Computing » How many routes to the center of Chengdu east railway station

How many routes to the center of Chengdu east railway station

Publish: 2021-05-08 21:40:37
1.

bus line: No.137, about 6.9km in the whole journey

1. Walk about 900m from Cheng east station to the North inner station of the fifth section of the East Third Ring Road

2. Take No.137, pass 11 stops and arrive at the East passenger transport center station

2. Still don't buy it. Many of the cats in the hands of cat dealers have germs
go and see lucky native cat, a special website for saving stray cats. There are so many lovely ones abandoned. Since you want to keep them, go and have a look at them ~
it seems that their cats have been vaccinated and sterilized, which saves a lot of things. There are also valuable cats lost. Go and have a look< br /> http://www.luckycats.net/
3. Unknown_Error
4. There may be three reasons: 1. The standard block for drawing should be 100 * 100 mm
2. It should be detected at the place where it is full of adhesive, not at the place where it is semi adhesive or without adhesive
3. Extruded boards are not allowed to be used now, and the fire rating does not meet the requirements
4. In practical application, there is no formal standard for the extruded sheet system, and few of them really meet the requirements; Especially in the insulation layer interface damage is difficult to achieve.
5. 0.1MPa

external wall insulation board is made of polymer mortar, fiberglass mesh cloth, flame retardant molded polystyrene foam board (EPS) or extruded plastic board (XPS) and other materials, which integrates thermal insulation, waterproof and finishing functions.

proct usage
external wall external insulation
basement roof insulation
external management of thermal bridge part of non external wall thermal insulation wall
construction requirements of external wall thermal insulation composite decorative board
I. construction conditions
1. The base wall shall meet the requirements of code for acceptance of construction quality of concrete structure engineering (GB 50204-2002) According to the requirements of code for acceptance of construction quality of bottom laying engineering (GB 50203-2002), when the flatness of the base wall does not meet the requirements, 1:3 cement mortar can be used for leveling, and the leveling can be carried out after the base construction acceptance and the installation of door and window frames and attached pipeline equipment
2. The ambient temperature ring construction should not be lower than 5 ℃, and the wind force should not be greater than 5. Construction should not be carried out in rainy days without protective measures
II. Construction process
see the construction flow chart. The process flow is suitable for the exterior wall coating finishing layer, which includes full putty, grinding and painting. In order to facilitate operation and rece wet operation on site, the finishing layer can be carried out before pasting the insulation board< 3. Key points of construction 1. General regulations 1. This regulation is applicable to the acceptance of insulation board pasting project. The quality acceptance of the facing layer shall be carried out according to the acceptance provisions of the code for acceptance of Building Decoration Engineering (GB 50201-2001)< The following documents and records should be checked ring project acceptance:
(1) construction drawing, design description and other design documents of insulation board project
(2) material and proct certificate, performance test report, site acceptance record and re inspection report
(3) test report on bonding strength of insulation board sample parts< (4) acceptance report of concealed works
(5) construction records, quality inspection and evaluation records< (1) setting time, installability and compressive strength of cement for bonding
(2) water absorption, frost resistance and impact resistance of insulation board
4. The following concealed items should be accepted in the insulation board pasting project:
(1) base treatment
(2) bonding point and bonding area between slab and base course
(3) anchor installation
5. Before and ring the construction of the insulation board, the sample parts should be made on the same base, and the bonding strength of the insulation board of the sample parts should be inspected, and the inspection method should refer to the "inspection standard for the bonding strength of building engineering facing bricks" (jgj110-1997).
6.

Test method: the broken joint shall be cut 2 to 3 days before the bond strength test, and the broken joint shall be cut from the surface of facing brick to the surface of substrate with the same depth


the drawing time is determined according to the ambient temperature or the curing time of the bonding mortar. Of course, when the strength reaches the maximum and before the surface decoration of the insulation board. The test time limit is not given in the code for quality acceptance of building energy efficiency engineering (GB 50411-2007)

< H2 > extended data

features of external wall thermal insulation board

1, thermal insulation, energy saving, waterproof, decoration in one

2. Factory proction and stable proct quality

It has the advantages of simple construction, one-time operation, short cycle, high efficiency and less wet operation

The surface layer can be made with various colors and patterns according to the design requirements

It has wide application scope and low comprehensive construction cost

6

7. If necessary, the pull-out strength of single anchor bolt of concrete base course shall not be less than 0.5 and 0.8kn, that of block base course shall not be less than 0.5 and that of brick base course shall not be less than 0.3kn
8. This should be the pull-out test of the expansion screw
you can see the T-shaped test report
What are their test results
just follow this standard
9.

Test method: the broken joint shall be cut 2 to 3 days before the bond strength test, and the broken joint shall be cut from the surface of facing brick to the surface of substrate with the same depth

The drawing time is determined according to the ambient temperature or the curing time of bonding mortar. Of course, when the strength reaches the maximum and before the surface decoration of the insulation board. The test time limit is not given in the code for quality acceptance of building energy efficiency engineering (GB 50411-2007)

the pull-out test of external wall insulation is done after the grid cloth is hung. The pull-out test of external wall brick is done after the external wall brick is pasted. The number of drawing points of external wall insulation is determined according to the area. Generally, one point is 800 square meters, and there are no less than three points in a building

extended data:

construction conditions

1. The base wall should meet the requirements of code for acceptance of construction quality of concrete structures (GB 50204-2002) and code for acceptance of construction quality of bottom laying engineering (GB 50203-2002). When the flatness of the base wall does not meet the requirements, 1:3 cement mortar can be used for leveling, After the base construction acceptance is completed, the door and window frames and the attached pipeline equipment are installed in place

The ambient temperature should not be lower than 5 ℃ and the wind force should not be higher than 5. The construction should not be carried out in rainy days without protective measures

10. If necessary, the pull-out strength of single anchor bolt of concrete base course shall not be less than 0.5 and 0.8kn, that of block base course shall not be less than 0.5 and that of brick base course shall not be less than 0.3kn
Hot content
Inn digger Publish: 2021-05-29 20:04:36 Views: 341
Purchase of virtual currency in trust contract dispute Publish: 2021-05-29 20:04:33 Views: 942
Blockchain trust machine Publish: 2021-05-29 20:04:26 Views: 720
Brief introduction of ant mine Publish: 2021-05-29 20:04:25 Views: 848
Will digital currency open in November Publish: 2021-05-29 19:56:16 Views: 861
Global digital currency asset exchange Publish: 2021-05-29 19:54:29 Views: 603
Mining chip machine S11 Publish: 2021-05-29 19:54:26 Views: 945
Ethereum algorithm Sha3 Publish: 2021-05-29 19:52:40 Views: 643
Talking about blockchain is not reliable Publish: 2021-05-29 19:52:26 Views: 754
Mining machine node query Publish: 2021-05-29 19:36:37 Views: 750