Marine cultural center to Daning Lingshi Park
as shown in the figure, Kunming Metro Line 6 under construction can not directly reach Dongfeng Square, but can transfer to line 2 at tangzixiang station to reach
Kunming Rail Transit Line 6 is the first line of Kunming Rail Transit, which is the auxiliary line connecting the main city and the new airport. Kunming Rail Transit Line 6 of Kunming Rail Transit phase I project is a large capacity subway system, which is the construction and operation of the north section of Rail Transit Line 1 and line 2, running through the north and south of Kunming main city and connecting to Chenggong New Area. Metro Line 6, 26.6 km long, connects Wujiaba central business district with Kunming new airport
Kunming Metro Line 6 is currently open from Kunming Changshui airport to the east bus station, the whole journey is 17 kilometers, the ticket price is 25 yuan, and the operation time is about 25 minutes. Please refer to the map for the specific location
at present, only the eastern bus station and the airport central station can get on and off passengers, and other stations have not been officially opened
The departure time of two stations of Kunming Metro Line 6 is the same, the first train is 6:20, and the last train is 22:20. Train departure interval is 25 minutes, the whole running time is between 21-23 minutes, one-way ticket price is 5 yuan, 10% discount for holding stored value card, 20% discount for holding senior citizen card, 50% discount for holding student card, and free for holding senior citizen card
Kunming Rail Transit Line 6 is the sixth line of Kunming Rail Transit, which adopts rail transit standard B type vehicles
phase I of line 6: 18.1km in length. In 2011, the national development and Reform Commission held a seminar on airport rail transit planning and construction in Kunming. At the seminar, experts from the national development and Reform Commission proposed to build line 6 into a National Airport demonstration line. Line 6 is constructed in two phases. The first phase consists of four stations from the east bus station to the airport central station. It has been put into operation with Kunming Changshui International Airport on June 28, 2012
phase II project of line 6: 7.534 km long, with 4 stations and 4 sections including tangzixiang station, Tuodong gymnasium station, Juhua comprehensive hub station and Juhua station. In the second phase of the project, a new urban terminal will be built at tangzixiang station to provide urban check-in service. The service of Changshui International Airport will be moved forward to the core area of the main city. Passengers can check in their luggage and print their boarding passes in the city. According to the construction plan of Kunming Rail Transit, the construction of Metro Line 6 (phase II) will start in the near future. According to the requirements of the provincial and municipal governments, it is planned to open to traffic by the end of 2017
phase I station of line 6: East bus station Dabanqiao station airport front station airport central station
phase II station of line 6: tangzixiang station Tuodong gymnasium station Juhua comprehensive hub Juhua station
< H2 > reference: Official Website of Kunming Rail Transit Group Co., Ltd. - introction to Kunming Rail Transit ProjectKunming Rail Transit Line 6 is the first line of Kunming Rail Transit, which is the auxiliary line connecting the main city and the new airport
The first phase of Kunming Metro Line 6 was officially opened to traffic on June 28, 2012. The standard L-type metro vehicle is adopted. This is the first subway line in Kunming. You can take subway line 6 to Changshui airport and get off at the airport central station
extended data:
Kunming Metro Line 6 station: tangzixiang station (transfer with line 2) - Chajie Station - dongjiaolu station (transfer with line 4) - Juhua Station - east bus station (transfer with line 3) - Dabanqiao station (transfer with line 9 Songming) - Airport front station - Airport Center Station - Airport North Station
reference materials:
Kunming Rail Transit official website - line network query
Now the subway is not available, so it can only be used as a bus
bus line: K9 road → Metro Line 2, the whole journey is about 11.3km
1. Walk about 170m from Kunming east bus station to the east bus hub station
2. Take K9 Road, pass 14 stops to Kunming Experimental Middle School Station
3. Walk about 380m to jiaosanqiao station
4. Take Metro Line 2, pass 1 stop to Chuanxin Gulou station
as an alternative currency in the form of electronic currency, is an unregulated and digital currency, which is usually issued and managed by developers and accepted and used by members of a specific virtual community. It is different from the virtual currency in the virtual world, because it can be used for real goods and services transactions, not limited to online games. The early digital currency (digital gold currency) is a form of electronic currency named after the weight of gold. Today's digital currencies, such as bitcoin, lightcoin and ppcoin, are electronic currencies created, issued and circulated by means of check sum cryptography.