Should the elevator inspection certificate be sent to the govern
To open the elevator inspection certificate in the Bureau of quality supervision, you need to bring the "self inspection report" to the special inspection institute to apply for inspection. After passing the inspection, the special inspection institute will issue the elevator inspection report and the elevator qualified use mark
the elevator inspection certificate refers to the certificate issued by the local technical supervision department to the elevator for safe use within a certain period of time after the elevator has passed the inspection by the national certified elevator inspection qualification unit
according to the regulations on safety supervision of special equipment issued by the State Council, the elevator annual inspection cycle is one year. Elevators that pass the annual inspection can be put into use
extended data:
elevator inspection process:
1. The applicant applies on site and submits application materials as required
2. The issuing department shall make a decision of acceptance or rejection within 5 working days from the date of receiving the application materials on the spot
3. If the submitted application materials meet the acceptance conditions, the license issuing department shall issue the decision on acceptance of administrative license application, and the overe application shall be regarded as the default acceptance. If the submitted application materials do not meet the acceptance conditions, the license issuing department shall explain the reasons for rejection, issue the "decision on rejection of administrative license application" and return all the application materials, and this application shall be terminated
4. If the application materials submitted are incomplete or do not conform to the legal form, the license issuing department shall inform the materials that need to be supplemented and corrected at one time, and issue the notification of supplement and correction of administrative license application materials. The applicant shall complete all the materials within 20 working days from the date of receiving the document. If the application is overe, it shall be deemed as abandoning the application
5. After being approved by the license issuing department, issue the special equipment operator certificate or sign on the certificate, and notify the applicant by telephone to get the certificate
1. Registration form for special equipment (2 copies for each equipment) (original seal required)
2. The organization code certificate of the user or the ID card of the owner of the elevator property right (personal ownership) (1 with red seal)
3. Elevator inspection report and safety inspection mark (1 original and 1 )
4. Special equipment operator certificate (elevator driver or elevator safety management personnel certificate, original and employment record; 1 with red seal)
5. Provide the maintenance contract signed with the maintenance unit (1 original and 1 )
6. Directory of elevator use and operation safety management system 1 original with red seal)
note:
(1) when the maintenance unit changes, the user should hold the maintenance contract, go to the original registration authority to handle the change proceres within 30 days after the new contract takes effect, and change the relevant identification of the maintenance unit in the elevator
(2) when the elevator is scrapped, all units should go through the cancellation proceres in the original use registration within 30 days
(3) when the elevator is out of service for more than one year or the suspension period exceeds the date of one regular inspection, the user should go through the suspension proceres at the original use registration authority within 30 days, and go through the opening proceres before re opening
after the installation of the elevator, according to the start-up report and quality inspection report, the supervision report goes to the Bureau of quality and technical supervision to apply for inspection and acceptance, and then schele
the acceptance is to wait for the report to come out, to get the acceptance report and elevator use certificate, and a small label (forget the full name)
After the elevator is installed, it shall be installed and accepted by the local special equipment inspection and testing institution
According to Article 21 of the regulations on safety supervision of special equipment, the manufacturing process of boilers, pressure vessels, pressure piping components, lifting machinery and large amusement facilities, and the installation, transformation and major maintenance process of boilers, pressure vessels, elevators, lifting machinery, passenger ropeways and large amusement facilities are introced, It must be supervised and inspected by the inspection and testing institutions approved by the special equipment safety supervision and Administration Department of the State Council in accordance with the requirements of safety technical specifications; Those that have not passed the supervision and inspection shall not leave the factory or be delivered for use
development data:
precautions for elevator installation
e to the particularity of elevator installation, as the general contractor, the project management department needs to pay attention to the following coordination matters:
(1) the civil structure and layout of the machine room and shaft must meet the requirements of the elevator civil layout plan
(2) the main power switch must meet the following requirements:
a The main power switch should be able to cut off the maximum current of the elevator under normal use conditions
B. the elevator switch should be able to easily access from the entrance of the machine room
(3) the shaft must meet the following requirements:
A. when there is space under the bottom of the pit that can be reached by personnel, and there is no safety gear device on the counterweight (or counterweight), the safety gear device should be installed on the counterweight (or counterweight), The counterweight buffer must be able to be installed (or the lower side of counterweight operation area must be able to be installed) on the solid pile pier extending to the solid ground
B. before the installation of the elevator, all the reserved holes of the landing doors must be provided with a safety enclosure with a height of not less than 1.2m, and sufficient strength should be ensured
C. when the distance between the two adjacent door sills is greater than 11m, a shaft safety door must be set between them. The shaft safety door is strictly prohibited to open into the shaft, and an electrical safety device must be installed to ensure that the elevator can operate when the safety door is closed< br />
Information should be provided ring the elevator annual inspection:
1. A of the inspection report of the previous cycle
2, speed limiter verification sheet
3, maintenance contract
4, maintenance unit qualification
5, self inspection report
6, daily maintenance record form
7, maintenance personnel operation certificate
8, safety management personnel certificate of user unit
9, elevator operator certificate (for freight elevator, elevator, elevator, elevator, elevator, elevator, elevator, elevator, elevator, elevator, elevator, elevator, elevator, elevator, elevator, elevator, elevator, elevator, elevator, elevator, elevator, elevator, elevator, elevator, elevator, elevator, elevator, elevator, elevator, elevator, elevator, elevator, elevator Medical elevator)
extended data
regulations on safety supervision of special equipment
regulations on safety supervision of special equipment and TSG t7001-2009 stipulate that the annual inspection cycle of elevator is one year
Article 28 of the regulations on safety supervision of special equipment stipulates that "the user of special equipment shall, in accordance with the regular inspection requirements of safety technical specifications, put forward the regular inspection requirements to the inspection and testing institutions of special equipment one month before the expiration of the period of validity of safety inspection." Therefore, check the date of the elevator's last annual inspection report or supervision and inspection report. 11 months after the date, put forward regular inspection requirements to the local special equipment Research Institute (or special equipment inspection institute) in written form or by telephone, and pay inspection fees according to relevant charging standards
source: Internet: Regulations on safety supervision of special equipment
the elevator license is the use registration certificate issued after the registration of the elevator
the supervision and inspection report is the written inspection certificate issued by the special inspection
the use registration certificate can only be handled after the inspection is qualified
1) special equipment registration form
2) regular inspection report of the previous year (including rectification opinions)
3)
4)
5) elevator management system of the unit
6) pay regular inspection fee
2. What should be prepared by the maintenance unit:
1) the qualification certificate for repair and maintenance of the unit; Commission certificate of the manufacturer ( with official seal)
2) under normal circumstances, maintenance personnel should be prepared to cooperate with the inspection
check 1 set - 6 sets, at least 2 persons, check 7 sets - 10 sets, at least 4 persons, check 11 sets - 20 sets, at least 6 persons
3. Get the inspection report and certificate:
1). If the elevator is "qualified", you can directly get the inspection report and certificate within 10 days
2) the elevator inspected is qualified, but the elevator with rectification project needs to be rectified by the maintenance unit, and after filling in the results, the elevator using unit will handle the inspection report and certificate after stamping the official seal on the rectification proposal
3) if the elevator is found to be unqualified, it shall be rectified by the maintenance unit and re inspected after it is qualified. The user shall affix the official seal on the rectification proposal for confirmation, and apply for the inspection report and certificate after passing the re inspection.