Position: Home page » Computing » Provincial registration center sends letter to constructor

Provincial registration center sends letter to constructor

Publish: 2021-04-05 23:11:59
1. It is suggested that you start from the local competent department of construction and find them with materials in person, which should be completed in a day or two. Otherwise, if you wait for them, you won't know when it will be. I used to write off the first building and change the supervision by myself, all the way to the construction department.
2.

According to the document requirements of the "notice on strengthening the practice management of registered constructor (or small project manager) of construction enterprises", when the construction project meets the following conditions, the construction enterprise can apply for online verification of registered constructor (or small project manager) certificate, which can be verified by construction, supervision, quality supervision, safety supervision, and The application form (Annex I) signed by the construction management department shall go through the online verification proceres in the construction management department of the place where the project is located, and return the assessment certificate of full-time safety management personnel:
1 Annex II) (2) opinions on quality supervision, rectification of quality problems and handling of quality accidents signed by the quality supervision department 3) Opinions on safety proction supervision and safety accident handling signed by safety supervision department 4) Online cancellation proceres shall be handled for the materials signed by the construction management department on civilized construction, on-site management and migrant workers' wage payment 5) When the certificate of full-time safety management personnel is returned, it is necessary to provide the confirmation opinions of engineering quantity and the pledge certificate
2. After the professional contractors such as pile foundation, earthwork, curtain wall, steel structure, installation, fire protection, intellectualization and decoration have completed the construction content agreed in the construction contract of the construction project, they shall rely on (1) the confirmation opinions on the completed quantities signed by the construction unit and the general contractor 2) Supervision opinions on project completion and project quality signed by the supervision unit Annex III) (3) opinions on quality supervision, rectification of quality problems and handling of quality accidents signed by the quality supervision department

(4) opinions on safety proction supervision and safety accident handling signed by safety supervision department 5) Online verification proceres shall be handled for the materials signed by the construction management department on civilized construction, on-site management and migrant workers' wage payment 6) When the certificate of full-time safety management personnel is returned, it is necessary to provide the confirmation opinions of engineering quantity and the pledge certificate
3. After the completion and acceptance of the main municipal works, the general contractor of municipal public utilities shall rely on (1) the acceptance opinions signed by the construction and supervision units Annex 4) (2) opinions on quality supervision, rectification of quality problems and handling of quality accidents signed by the quality supervision department 3) Opinions on safety proction supervision and safety accident handling signed by safety supervision department 4) Online verification proceres shall be handled for the opinions on civilized construction, on-site management and migrant workers' wage payment signed by the construction management department 5) When the certificate of full-time safety management personnel is returned, it is necessary to provide the confirmation opinions of engineering quantity and the pledge certificate
4. If the construction project has not started within six months after the signing of the construction contract, the construction enterprise can apply for online verification, but it needs to rely on the confirmation opinions of the construction unit and the verification opinions on the construction site signed by the construction management department. After the restart of the project, the person in charge of the project construction management must have the same qualifications and conditions as the person in charge of the bid winning project

3. It may be that they are required to be employed by a relevant unit at the time of registration, which should be registered with the local competent department of construction. The unit you are employed may not be very famous, so you need a document issued by the local construction bureau to prove the relevant situation of the unit.
4. There are letters. If it is taken in the name of the company, I hereby invite some people from our company to apply for the registration certificate of constructor. Please help. If it's personal, you can get it directly with your supporting information.
5. The major recorded in the system is not consistent with the major you declared, which means that the major you passed and filled in is not correct. Log in again, input
6.

1. First, open the website of Shandong Provincial Department of housing and urban rural development

7. The key depends on how the registration office handles it. Normally, the certificate is confiscated and registration is not allowed. But sometimes it will also be included in the integrity blacklist, which will affect that it is not allowed to apply for other types of national examinations in the next 3-5 years. In short, now all kinds of certificates are filed in electronic files, and cloning certificates is a trick of Pediatrics, which is not worth the loss.
8. We have to wait
9. Find out the reason why the audit failed. If it's the company's qualification, you can check with the company.
10. After submitting the change registration application in the first level constructor registration management system:
Shandong changes out of the province - you need to submit the application form + dismissal certificate + labor contract in the provincial Registration Center (5 working days). The dismissal certificate and labor contract shall be accompanied with the original and , and the plicate shall be collected)
the application form is made in triplicate and the others in one
the materials required for change of registration in the province are identical
to change from other provinces to Shandong, you need to submit the application form + dismissal certificate + labor contract + registration certificate (the change application form is stamped with the official seal of the registration center of other provinces). The dismissal certificate and labor contract shall be in plicate.
Hot content
Inn digger Publish: 2021-05-29 20:04:36 Views: 341
Purchase of virtual currency in trust contract dispute Publish: 2021-05-29 20:04:33 Views: 942
Blockchain trust machine Publish: 2021-05-29 20:04:26 Views: 720
Brief introduction of ant mine Publish: 2021-05-29 20:04:25 Views: 848
Will digital currency open in November Publish: 2021-05-29 19:56:16 Views: 861
Global digital currency asset exchange Publish: 2021-05-29 19:54:29 Views: 603
Mining chip machine S11 Publish: 2021-05-29 19:54:26 Views: 945
Ethereum algorithm Sha3 Publish: 2021-05-29 19:52:40 Views: 643
Talking about blockchain is not reliable Publish: 2021-05-29 19:52:26 Views: 754
Mining machine node query Publish: 2021-05-29 19:36:37 Views: 750