Parking at Nanning Convention and Exhibition Center
if it's Instrial South Road, then take 87, 47, 99, 119. I remember K116 is also there. You can take these buses at Jiefang Bridge, However, 87 road to the east gate of Daming Lake, or in the old East Gate station to sit also OK ~!
nearby
Convention and Exhibition Center - the subway station 723 meters
by subway: Metro Line 1
According to the survey from the International Convention and Exhibition Center, the supporting facilities have been started and everything has been carried out in an orderly way according to the set goal: the Convention and Exhibition square, which is composed of ecological parking lot and assembly square, has a total land area of 147700 square meters, can park more than 1000 cars and occupies 26000 square meters. The total investment of 125 million yuan has been started on July 10, 2003, It will be completed before October 15, 2004 and officially put into use on October 23, 2004
the Folk Song Square, which attracts the world's attention, is composed of the main venue of the annual Nanning International Folk Song Art Festival, water stage, leisure park, artificial lake, public parking lot, etc., and echoes with the main building of the exhibition center. It covers an area of 256 Mu and can accommodate 35000 people. There are artificial lake and public parking lot with 340 cars in it. The project plans to invest 110 million yuan, It is planned to be put into operation on October 10
the construction of generic cabling system, electroacoustic and conference system, public address system, large screen system, building automation system, security system, fire alarm and linkage system has been basically completed and can be put into use
more than 700 data points and 30 language points have been added to the network system and generic cabling project. The system has completed the bidding work on September 3, is now in the exhibition hall wiring and equipment ordering, and is planned to put into use on October 20
the bidding for the central computer room has been completed on September 7, and the construction unit is carrying out the detailed design of the drawings and arranging the order. It is planned to put into use on October 15
the media center has completed the bidding work on September 13, and is now arranging the order, which is planned to be put into use on October 15
in terms of conference system transformation, a set of 1 + 11 simultaneous interpretation system is added to the international conference hall and the multi-function hall respectively, and a projection system is added to the multi-function hall. The bidding of these systems will be completed before September 2. Now the construction unit is carrying out the detailed design of drawings and arranging the order, and it is planned to put into use on October 15. The security system, including the control room, cameras and the new access control system, has been upgraded. The system has completed the bidding work on September 6, arranged the order, and started the construction of the second phase project of Folk Song Square and a square. It is planned to put into use on October 20
in terms of the intellectualization of the first level supporting project, the generic cabling system is in the process of pipeline cleaning, bridge installation and setting out. The equipment installation will be completed on September 20, and the commissioning will be completed and put into use on September 30
the network system and conference system are planned to be installed on September 30 and debugged and put into use on October 10
the pipeline cleaning, bridge installation and setting out of the security system are in progress. The equipment installation is planned to be completed on October 1, and the commissioning will be completed and put into use on October 10
the fire alarm system is in the process of pipeline cleaning, bridge installation and setting out. It is planned to complete the equipment installation on October 1, and complete the commissioning and put into use on October 10
the building automation system is in the process of pipeline cleaning, bridge installation and setting out. The equipment installation is planned to be completed on October 2, and the commissioning will be completed and put into use on October 15

in recent days, there is a clothing exhibition. You can go and have a look. It's free of charge
the routes passing through "Zhuxi interchange" are: No.1 Ring Road, No.1 line, No.6 Road, No.16 Road, No.17 Road, No.19 Road, No.25 Road, No.29 Road, No.34 Road, No.39 Road, No.45 Road, No.46 Road, No.47 Road, No.52 Road, No.60 Road, No.72 Road, No.74 Road, No.76 Road, No.79 Road, No.87 Road, No.90 Road, No.92 Road, No.206 Road, No.211