How to calculate the design value of steel support axial force
route recommendation: route recommendation:
1. Nanshan Temple + Tianya Haijiao, Nanshan Temple's view of Buddha worship, the 108 meter high South China Sea Guanyin statue from afar, the exquisite "Jinyu Guanyin" built with nearly 200 million yuan, kneeling down to pray for happiness and safety, the Tianya Haijiao experience the profound cultural heritage spread all over the world, and feel the cultural feelings expressed by the ancients here
2 Wuzhou + Nantian hot spring, go to the island to see the beautiful natural scenery of lover's paradise (you can choose various self funded projects such as motorboat, parasol and diving on the island), and go to Nantian from the outlying island to experience the subtle feeling of little fish's kiss in the beautiful garden
3. Yanoda tropical rain forest, in this tropical rain forest world, you can see all kinds of tropical rain forest vegetation, Experience the rich and colorful rainforest ecological treasure house, in addition, you can also choose to participate in the interesting expansion activities of stepping on the waterfall
4. Outdoor yacht deep-sea diving super value package 280 yuan / person
yacht sightseeing + sea fishing + seafood barbecue + fishing port sightseeing + deep-sea diving
you should do more homework, if you don't understand, you can ask me or go to my space to have a look
for the major suspects who commit crimes on the run, repeatedly or in groups, the time for submitting for examination and approval can be extended to 30 days
the people's Procuratorate shall decide whether to approve the arrest or not within seven days after receiving the letter of approval from the public security organ. If the people's Procuratorate refuses to approve the arrest, the public security organ shall immediately release it after receiving the notice and inform the people's Procuratorate of the execution in a timely manner. For those who need to continue investigation and meet the conditions for obtaining a guarantor pending trial or residential surveillance, they shall obtain a guarantor pending trial or residential surveillance according to law<
Article 343 (1) [crime of illegal mining] of the criminal law of the people's Republic of China violates the provisions of the mineral resources law by mining without a mining license, entering state planned mining areas, mining areas of great value to the national economy and other people's mining areas, or mining specific minerals for which protective mining is prescribed by the state, If the circumstances are serious, he shall be sentenced to fixed-term imprisonment of not more than three years, criminal detention or public surveillance and shall also, or shall only, be fined; If the circumstances are especially serious, he shall be sentenced to fixed-term imprisonment of not less than three years but not more than seven years and shall also be fined.
Kn is the unit of force, MPa is the unit of stress and strength. The simple conversion is 1kn = 0.001mpa
Calculation of pre added axial force of steel support in deep foundation pit: firstly, add the pre added force to zero to calculate an anchor cable tension, which can ensure the stability of foundation pit against overturning, and then multiply it by 70 ~ 95% of the specification to get the pre added force
generally, the preloaded axial force of steel support in deep foundation pit is not more than 450kn, because the pile anchor structure is mostly sand, silt, or clay, and the uplift force of this stratum and anchor cable is limited. The preloaded force of 450kn means that the design tensile force reaches 450 / 0.95 ~ 450 / 0.7, which is basically the limit of ordinary anchor cable in this stratum. If it can not be met, it is necessary to consider densifying the anchor cable spacing
extended data:
basic requirements of deep foundation pit support:
1. The construction scheme of deep foundation pit support must be determined according to the design requirements, depth and on-site environmental engineering progress. After spinning, it shall be approved by the chief engineer of the unit and submitted to the chief supervision engineer for approval, and the construction can be carried out only when it meets the requirements of specifications and laws and regulations
2. The underground water level must be solved in the construction of deep foundation pit. Generally, light well point pumping is used to lower the underground water level to 1.0 meters below the bottom of foundation pit. A special person must be responsible for pumping water for 24 hours on ty, and the pumping records should be made. When the open ditch drainage is adopted, the drainage shall not be interrupted ring the construction period. When the structure does not have anti floating conditions, it is strictly forbidden to stop the drainage
3. During the excavation of deep foundation pit, the distance between multiple excavators should be more than 10m, and the excavation should be carried out layer by layer from top to bottom, and no deep excavation is allowed
The ladder or support should be g up and down the deep foundation pit, and it is forbidden to step on the support, and safety railings should be set around the pit5. When manually lifting earthwork, the lifting tools should be checked to see if they are reliable, and no one should stand under the bucket
When stacking materials and moving construction machinery on the side of deep foundation pit, a certain distance should be kept from the excavation edge. When the soil quality is good, it should be 0.8m away, and the height should not exceed 1.5m During the construction in rainy season, drainage measures must be taken to prevent rainwater and surface water from flowing into the deep foundation pit. During the excavation in rainy season, 15-30cm soil should be left above the elevation of the foundation pit, and the excavation should be carried out after sunny dayssuppose:
the designed applied prestress value is 300KN
the sectional area of the jack is 0.017671 M2
the applied prestress = the designed applied prestress value / sectional area of the jack = 300 / 0.017671/1000 = 1.70mpa
Axial Force: in architecture, the internal force that coincides with the axis of the member is called the axial force, which is represented by the symbol FN. When the member is in tension, the axial force is tension, which points away from the section; When the member is compressed, the axial force is compression, which points to the section (in building curtain walls, especially in frame supported curtain walls, it is also expressed as eccentric compression and eccentric tension). It is usually stipulated that the tension is represented by a positive sign and the pressure is represented by a negative sign.
2. Manual calculation steps: firstly, the plane frame calculation diagram to be calculated is extracted from the structural system. Because the space system needs to be transformed into a plane according to the mechanical principle in manual calculation, and the horizontal frame and vertical frame are calculated respectively, it is almost impossible to calculate the structural space system directly; The calculation diagram includes span, number of spans, column height, load, beam column stiffness, etc; ② In the calculation diagram, use the iterative method to calculate the internal force. After the calculation, you can get the axial force and bending moment of the column, including the internal force of the beam.
