Position: Home page » Computing » The next Wafang subway goes to the first center

The next Wafang subway goes to the first center

Publish: 2021-04-24 00:46:57
1. Take 867 from the lower Wafang to Saibo, Anshan West Road, and then wait for 851 at the same place,
or just wait for a bus to Binjiang Road, lebina station, and then wait for 851.
2.

As of November 2019, all stations of Tianjin Metro Line 1 are: shuangqiaohe station (not yet opened), xianshuigu North Station (not yet opened), Donggu Road station, Guozhan Road station, Beiyangcun station, shangguozhuang station (not yet opened), gaozhuangzi station, hongnihe east station (not yet opened), Lishuang Road North Station (not yet opened), Lilou station, Shuanglin station, University of Finance and Economics station, huashanli station Fuxingmen station, chentangzhuang station,

Tucheng station, Nanlou station, xiawafang station, Xiaolou station, Yingkou station, Anshan Road station, haiguangsi station, Erwei Road station, southwest corner station, northwest corner station, west station, honghuli station, qinjian station, Benxi Road station, jiayuanli station, Ruijing Xinyuan station and Liuyuan station

Tianjin Rail Transit Line 1 (also known as 7047 project) is the earliest subway line in Tianjin. The project was officially started on June 5, 1970, put into trial operation in January 1976, officially put into operation on December 28, 1984, and shut down on October 9, 2001

the length of Tianjin Rail Transit Line 1 is 42 km, which is derived from the extension and reconstruction of the existing Tianjin Metro Line (namely "7047 project"). Tianjin Rail Transit Line 1 runs obliquely through the urban area of Tianjin from southeast to northwest, passing through six districts: Beichen District, Hongqiao District, Nankai District, Heping District, Hexi District and Jinnan District. It is one of the most important subway lines with the largest passenger flow in Tianjin

extended data:

main project

East extension project of Tianjin Metro Line 1, located in Jinnan District. The construction unit has overcome the problems of lagging civil engineering handover surface and long line, adopted the advanced "steel spring floating slab" track bed technology, selected the "steel cage method" construction method for construction, and used the special variable span gantry crane as the track laying tool on site.

when the monolithic track bed is laid to the steel spring floating slab track bed section, the construction unit has completed the construction, The construction process is changed from "track arrangement method" to "reinforcement cage method", which ensures the continuity of construction, improves the construction progress and quality, and successfully realizes the goal of "long rail connection"

value significance of Tianjin Metro Line 1

the opening of Tianjin Rail Transit Line 1 is of great significance to improve the traffic conditions of Tianjin and show the economic strength of Tianjin

source of reference: network Tianjin Metro Line 1

3. Tianjin Metro Line 1: from Liuyuan to Shuanglin, 26.188 km long, with 22 stations<

Liuyuan xihengdi wine factory Benxi road Qinjian road honghuli West Railway Station northwest corner southwest corner Nankai Erwei Road haiguang Temple Anshan Road Yingkou Road Xiao building xiawafang South Building Tucheng chentangzhuang Fuxingmen huashanli College of Finance and economics Shuanglin
4. Xiawafang
1 walk 1 meter to xiawafang, take 641 (via 7 stops | 26 minutes) or 641 air conditioning
2 get off the Hotel South Road, walk 22 meters to the Hotel South Road, take 838 (via 5 stops | 27 minutes), or take 529 air conditioning
3 get off the Meijiang Convention and Exhibition Center to reach
Meijiang Convention and Exhibition Center
5. Get off at the southwest corner and walk over
6. Line 1: from Liuyuan to Shuanglin, 26.188km long, with 22 stations. The line passes through CBD area, southwest corner and southwest building, and connects xihengdi residential area, xiaohaihai residential area and chentangzhuang instrial area on the edge of central urban area, with Liuyuan parking lot and Shuanglin depot (within the outer ring road)
line 2: from Caozhuang to limingzhuang, with a total length of 23.5km and 20 stations. The line can reach Yangliuqing town in the West and Tianjin Binhai International Airport in the East. It mainly passes through CBD area, Huanghe Road, southwest corner, Nanshi, Tianjin station, Huachang Road, Weiguo Road, Wanxin village and Wansong residential area; A branch line to Yihe residential area will be added at the west end to expand the service scope. Caozhuang parking lot and limingzhuang depot (outside the outer ring road) are set
line 3: the total length from Houtai to Xiaodian is 22.3km, with 19 stations. To the north, it can reach Beichen Science and Technology Park, mainly through CBD area, Houtai residential area, wangdingdi residential area, water park, Weijin Road, Nankai University, Tianjin University, Radio Road, Yingkou Road, Chifeng Road, Tianjin station, kunwei Road, North Station, Zhongshan North Road, zhangxingzhuang street, yixingbu, xinyi Avenue, Xiaodian, etc., and set Huayuan depot Xiaodian parking lot (outside the outer ring road)
line 4: from Hebei to ZhangGuiZhuang, with a total length of 35.7 km and 28 stations. The main routes along the line are BeiCang residential area, Baimiao, Tiantai Road, Zhongshan Road, northeast corner, southeast corner, Heping Road, Liuwei Road, Jintang Road, ZhangGuiZhuang, etc. the connection to Shuangjie town is reserved in Hebei, and the connection to Jintang light rail is reserved in ZhangGuiZhuang; Dongli and Wanxin branch lines are added at the east end, and Hebei comprehensive maintenance base and Xinli parking lot (outside the outer ring line) are set
line 5: 31.2km long, with 24 stations. This line passes through Zhangkou, Lishuang highway, Youyi Road, Guangzhou road, Qiongzhou Road, Dagu No.3 Road, Hongxing Road, Jingjiang Road, hexingzhuang, yixingbu, Tiedong residential area, etc; Zhangkou reserves the interface to the surrounding group of Dasi town; And set up the Dashi depot (outside the outer ring road) and BeiCang parking lot (inside the outer ring road)
line 6: from liqizhuang to dabizhuang. The total length is 21.4 km, with 18 stations. Through Li Qizhuang, Lingbin Road, Binshui West Road, sports center, Hongqi South Road, Hongqi Road, Xiqing Road, Tianjin west railway station, Hebei eight road, Tianjin North railway station, Jianchang Road, dabizhuang, etc., and set up dabizhuang depot (outside the outer ring road), Li Qizhuang parking lot (inside the outer ring road)
line 7: it is a peripheral line of rail transit. From Nandian scenic spot to liyuantou in Beichen District, the total length is 25.5km. The line is laid along Helan Road, Shaliu road and Dongjiang road. The service areas include Liyuan residential area, Wanxin residential area, Dongli residential area, xiaohaihai residential area, MeiJiangNan residential area, exhibition center and weinanwa scenic area
line 8: it is a peripheral line of rail transit. Xiaodian group to Zhongbei Town, a total length of 20 km, the line along Nancang Road, Miyun Road, mustard Garden Road West layout. The service areas include xihengdiwai residential area, Tiedong residential area, BeiCang instrial area and Tiedong instrial area
line 9: the east section of the rapid rail transit project from Tianjin urban area to Binhai New Area starts from Zhongshan Gate in the city and ends at the eighth avenue of the development zone. There are 19 stations (including 5 reserved stations), one control center, one vehicle base and one parking lot. At present, nine operating stations have been opened, including Zhongshan Gate station, No.2 Bridge station, Dongli Development Zone Station, steel pipe company station, foreign goods market station, Dongting Road station, citizen square station, exhibition center station and Donghai Road station. The rest stations will be opened one after another.
7.

bus line: Metro Line 6 → Metro Line 3 → Jinbin Light Rail Metro Line 9 → No. 668, the whole journey is about 12.4km

1. Take Metro Line 6 from jinzhonghe street, pass 3 stops, and reach North Station

2. Walk about 70m, then transfer to Metro Line 3

3. Take Metro Line 3, pass 3 stops, and reach Tianjin station

4. Take Jinbin Light Rail Metro Line 9, After 3 stops, you can reach Zhigu station

5, walk about 410 meters, reach Yian hot spring apartment station

6, take bus 668, after 2 stops, you can reach xiawafang (yunzhongtian media) station

7, walk about 70 meters, and reach xiawafang

8. Starting from entrance a of xiawafang station (Metro Line 1)
starting from xiawafang station

walking to the terminal Tianjin station
9. Starting from Tianjin station
start from Tianjin station (platform a)
take no.858 bus to go down (Tianjin station (platform a) - Xushui lanxuan)
arrive at xiawafang.
walk to the terminal point, xiawafang station entrance a (Metro Line 1) reply: comments (0)
10. From Liuyuan, Beichen District in the north to Shuanggang group, Jinnan District, with a total length of 31.5km, the line connects xihengdi residential area, dingzigu residential area, Tianjin west railway station, Longcheng, Nanjing Road, Central Business District, Central Business District, xinanlou District, chentangzhuang instrial area, xiaohaihai residential area, Shuanglin residential area and Shuanggang group, The direction of the line is dominated by passenger flow to the west of Haihe River

the train is entering huashanli station of Tianjin Metro Line 1. The project of Tianjin Metro Line 1 and the reconstruction project of the existing line of Tianjin Metro started in 2001. Tianjin Metro was shut down on October 9, 2001. The reconstruction project was officially started on November 21, 2002 and opened to traffic on December 28, 2005. The sightseeing trial operation was originally scheled to start on March 28, 2006 (not on time), but a notice was posted at the subway station on March 28, 2006, and the sightseeing trial operation failed to proceed as planned. Finally, the trial operation started on June 12, 2006
the total length of the reconstructed Metro Line 1 is 26.188 km, including 8.743 km of elevated line, 1.509 km of ground line, 0.558 km of transition line and 15.378 km of underground line (including 7.335 km of existing line). There are Liuyuan, xihengdi, guojiuchang, Benxi Road, Qinjian Road, honghuli, West Railway Station (temporarily cancelled e to the renovation of this station on May 28, 2009), northwest corner, southwest corner, Erwei Road, West Railway Station, etc Haiguang temple, Anshan Road, Yingkou Road, Xiaolou, xiawafang, South Tower, Tucheng, chentangzhuang, Fuxingmen, huashanli, University of Finance and economics, Shuanglin, a total of 22 stations. The Xinhua Road station, which is built on the existing railway line, has been permanently closed and become the first permanent subway station in Chinese mainland. Officials said the station was closed because it was too close to Xiaolou station. It was also pointed out that the station may be closed because it is connected with the underground structures of Tianjin municipal Party committee and municipal government, so it is inconvenient to carry out reconstruction.
Hot content
Inn digger Publish: 2021-05-29 20:04:36 Views: 341
Purchase of virtual currency in trust contract dispute Publish: 2021-05-29 20:04:33 Views: 942
Blockchain trust machine Publish: 2021-05-29 20:04:26 Views: 720
Brief introduction of ant mine Publish: 2021-05-29 20:04:25 Views: 848
Will digital currency open in November Publish: 2021-05-29 19:56:16 Views: 861
Global digital currency asset exchange Publish: 2021-05-29 19:54:29 Views: 603
Mining chip machine S11 Publish: 2021-05-29 19:54:26 Views: 945
Ethereum algorithm Sha3 Publish: 2021-05-29 19:52:40 Views: 643
Talking about blockchain is not reliable Publish: 2021-05-29 19:52:26 Views: 754
Mining machine node query Publish: 2021-05-29 19:36:37 Views: 750