How can I get to Luogang housing provident fund management cente
→
Kunshan 132 road
→
Kunshan 25 road loop, the whole journey is about 20.0km
1. Walk from Huaqiao middle school to Guangming Xincun station
2. Take Kunshan 101 Road, pass 4 stops,
to Lujia middle school station
3. Walk about 190m to Lujia Luqian Road Station
4. Take Kunshan 132 Road, pass 4 stops,
arrive at Yongli packaging station
5. Walk about 440 meters to Zhuhai Road (Kunshan) station
6. Take Kunshan No.25 ring line, pass 8 stops,
arrive at AVIC City Station
7. Walk to Kunshan sub center of Suzhou housing provident fund management center
2. Take bus 22 (9 stops) from sports center station 2 to nongshuo station 2, and walk to Haoxian road
3. Take 289 Express (4 stops) from Sports Center Station 3 289 Road (take 7 stops) to Dongfeng Middle Road station. Walk to Haoxian road
Guangzhou housing provident fund management center: 10th floor, 193 Haoxian Road, Yuexiu District, Guangzhou
2. Take bus 22 (9 stops) from sports center station 2 to nongshuo station 2, and walk to Haoxian road
3. Take 289 Express (4 stops) from Sports Center Station 3 289 Road (take 7 stops) to Dongfeng Middle Road station. Walk to Haoxian road
Guangzhou housing provident fund management center: 10th floor, 193 Haoxian Road, Yuexiu District, Guangzhou
address: no.485-4, Huangpu East Road, Huangpu District, Guangzhou City, Guangdong Province
B. Tianhe Management Department of Guangzhou housing provident fund management center
address: No.12, Huajiu Road, Tianhe District, Guangzhou City
C. Haizhu Management Department of Guangzhou housing provident fund management center
address: 2nd floor, 272 Changgang East Road
D Liwan Management Department of Guangzhou housing provident fund management center
address: 1024 Kangwang North Road, Liwan District, Guangzhou
e, Baiyun Management Department of Guangzhou housing provident fund management center
address: 2 / F, Zhengyang building, 1438 Airport Road, Baiyun District
F, Yuexiu Management Department of Guangzhou housing provident fund management center
address: 9-10 / F, East Building, real estate building, 193 Haoxian Road Address: room 104-108, 1 / F, poly commercial complex building, Kaichuang Avenue, Luogang District, Luogang District (near Xiangxue 2nd Road)
the party mass system mainly includes a series of units such as the Party committee office, the government office, the National People's Congress, the CPPCC, the Discipline Inspection Commission, the Organization Department, etc. (the division of each place may be slightly different), so the civil servants in these units are collectively referred to as the party mass system civil servants
we know that there are many administrative units in a place. In order to facilitate the division of functions of administrative units, we put the similar functions together to form a system, which is easy to find and manage. For example, some departments that focus on propaganda functions, such as propaganda department, radio and television station, newspaper office and Culture Bureau, will be classified under "propaganda system". Then, civil servants of the above departments can be said to be civil servants of propaganda system
dividing each department into the party mass system is not only easy to find and manage, but also easy to organize. For example, a tug of war chorus competition will be held in a certain place. In other words, people in the units included in the party mass system can participate, while people who are not in the party mass system cannot
(1) there is no design of safety facilities in a mine construction project or a construction project used for the proction or storage of dangerous goods, or the design of safety facilities has not been submitted to the relevant department for examination and approval in accordance with the provisions< (2) the construction unit of a mine construction project or a construction project for the proction and storage of dangerous goods fails to carry out the construction in accordance with the approved design of safety facilities< (3) the safety facilities of a mine construction project or a construction project for the proction or storage of dangerous goods have not passed the acceptance before they are put into proction or use< (4) failing to set up obvious safety warning signs on the proction and operation sites, relevant facilities and equipment with major risk factors
(5) the installation, use, detection, transformation and scrapping of safety equipment do not meet the national or instrial standards< (6) failure to carry out regular maintenance and regular inspection of safety equipment< (7) failing to provide employees with labor protection articles that meet the national or instrial standards< (8) special equipment and containers and means of transport of dangerous goods are put into use without obtaining a safety certificate or safety mark after they have passed the examination and inspection by a qualified organization< (9) the use of processes and equipment that endanger proction safety and are eliminated or prohibited by the state.
