Visit the National Convention and Exhibition Center in the new y
take metro line 17, get off at Zhuguang Road station, exit 2, and walk 650 meters to Shanghai National Convention and Exhibition Center.
2. Take no.739 from Caobao road Xingzhong road bus station to Hangdong road Huqingping Road station, transfer no.776 (interval) to Yinggang road Zhuguang Road station, get off and walk to the National Convention and Exhibition Center
2. When you arrive at Wanchai port, you should buy a ticket first. After you buy the ticket, you should line up in the frontier inspection Hall, and the police should check the pass.
3. The fee is 15 yuan (or foreign currency, about RMB)
4, Very close to Macau's [fountain] and [Shiliupu casino]
5. After arriving in Macau, there are several exchange points on the new road nearby, and some businesses will cheat people. Be careful (cross the road after leaving the Macao border hall, turn left and go straight)
warm tips: a boat can carry 100 people in about 10 minutes, Choose me as soon as possible!!!!!
exhibition date 2015-11-03 to 2015-11-07
exhibition city Shanghai
exhibition address national convention and Exhibition Center (Shanghai)
exhibition hall name National Convention and Exhibition Center (Shanghai)
organizer: National Development and Reform Commission, Ministry of Commerce, Ministry of instry and information technology, Ministry of science and technology, Chinese Academy of Sciences
Bijia Exhibition
The National Convention and Exhibition Center is large in size and regular in shape, integrating the functions of exhibition, conference, commerce, office and hotel. The total construction area is 1.2 million square meters, of which the exhibition hall is about 400000 square meters. The project is divided into two phases. The total construction area of the first phase is about 620000 square meters, the indoor exhibition area is 200000 square meters, and the outdoor exhibition area is 100000 square meters. It will be officially put into use in the second half of 2015
the National Convention and Exhibition Center is designed by the joint design team of German GMP and China Academy of Building Sciences, which combines the advantages of both sides and adopts international standards. The overall layout of the project is a 24 meter high single storey exhibition hall on the west side and sufficient commercial facilities on the east side. The exhibition hall is connected in series with a simple cross axis moving line. The single-layer columnless structure design and open outdoor exhibition hall can meet the needs of holding heavy theme exhibitions and related activities
the National Convention and Exhibition Center takes into consideration the practicability, economy, convenience and intensive operation. We should innovate the system and mechanism, strengthen the cooperation with international well-known exhibition institutions, undertake the international exhibition instry transfer, innovate the new mode of "south light North heavy, South out north, South out North in", and form the exhibition layout of "south, middle and North" division of labor and cooperation
the exhibition operation adheres to the direction of "specialization, marketization, internationalization, legalization and branding", and takes the road of sustainable development; Adhere to the combination of domestic and foreign trade, pay more attention to domestic trade; Adhere to the combination of import and export, pay more attention to import; Adhere to the combination of service trade and goods trade, and pay more attention to service trade; Adhere to the combination of light and heavy instries, and pay more attention to heavy instries; Adhere to the combination of government guidance and market operation, and pay more attention to market operation; Efforts should be made to achieve the level, characteristics and results
the National Convention and Exhibition Center is "people-oriented", and customers can freely walk through the exhibition halls; The elevated central corridor provides diversified demands for customers; There is a large truck waiting area around, which is directly connected with the internal loop system; The internal logistics channels connect the exhibition halls to realize the separation of passengers and goods
each exhibition hall is set according to the exhibition rules, with a length of more than 150 meters and a width of more than 80 meters, providing an exhibition area of 12500 square meters; The net height is 16m and the ground load is 5T or 8t; The lifting point reaches 200kg; Adjacent exhibition halls can easily form a larger exhibition space. The outdoor area is 100000 square meters, and the ground load is 10t, which can meet the exhibition of various specifications of exhibits
the National Convention and Exhibition Center is adjacent to Haihe River on the natural axis of the city in the north and Tianjin Avenue in the south. It is about 10km away from the airport, 20km away from the port and 15km away from the high-speed railway station. Many highways of various grades meet here. Three planned metro lines will go directly to the exhibition hall, of which Metro Line 1 will be put into use in 2015

On the evening of October 15, 2014, the exhibition hall concted a light test
from October 19 to 21, 2014, the world's largest single building and Convention and Exhibition complex, the National Convention and Exhibition Center (Shanghai), will usher in the first trial operation exhibition. At that time, the two North pavilions will hold the China International Automobile Fair. According to the prediction of relevant departments, the average daily passenger flow will reach 50000 person times, and the peak hour passenger flow will be about 20000 person times
since March 11, 2015, all pavilions of the National Convention and Exhibition Center have been put into use, including the Shanghai auto show in April 2015, and a series of exhibitions have been confirmed to be held here

Shanghai National Convention and Exhibition Center is a project jointly built by the Ministry of Commerce and Shanghai municipal government. It covers an area of 860000 square meters, with a construction area of 1.47 million square meters. It can provide 400000 square meters of indoor exhibition area and 100000 square meters of outdoor exhibition area. Among them, the C1 double-layer exhibition hall, CO office building, do hotel and other eight single buildings and two bidding sections of related supporting facilities undertaken by the eighth Bureau of China Construction Co., Ltd. only took less than two years to make this landmark "four leaf grass" building bloom perfectly

