Little ant virtual currency
Introction to software
little ant CFT app is an application platform related to making money from blockchain. CFT is the token score of little ant platform. As long as users successfully invite friends to join little ant platform, they can get profits. They usually make money by completing contracts in little ant platform. Every week, little ant platform will have activities, For example, it can win luxury cars, so that users can easily make money<
CFT ant
software advantages
1. A very advanced blockchain money making platform, a mobile phone online blockchain mining application software, the software only needs users to use their own mobile phone to register, and then can be used normally
2. The operation is very convenient and simple. Users can start to make money by mining after logging in with one key on the mobile phone. Users can make money by mining on the software every day
3. In addition, users can get extra rewards by inviting friends to join, and they can get rich mining experience anytime and anywhere by using the mobile phone
function introction
1. As long as you have a real name, you can send two mining machines, which are 140 yuan mining machine and 2-hour mining machine
2. Cash can be withdrawn every day, starting from 2 yuan, and it will arrive in 5 minutes
3, authentication does not require certification fees, and requires ID number;
4. Easy to operate, it is a very valuable digital asset platform
use
small ant mining app0 Lu 2 yuan strategy:
1, first download software and registration, real name authentication requires ID number without authentication fees;
2. In my miner, you can see two miners, one is 140 yuan, the other is 2 hours miner, you can get 2 coins after 2 hours of operation
3. Enter 2 in the trading center to sell directly, and then 2 yuan can be immediately sent to the account balance
4. Click to withdraw, set the bank card number, withdraw 2 yuan immediately, and it will arrive in 5 minutes
the miner with 5 or 140 yuan can proce about 4 pieces per day, and the withdrawal method is the same as above
6. If invited, there are five generations of income: 5% for the first generation, 4% for the second generation, 3% for the third generation, 2% for the second generation and 1% for the first generation
software description
registration Description:
in the registration page input box
input the mobile phone number, mobile phone verification code, set the login password, confirm password, fill in the invitation code (not required), check agree to the "little ant user agreement" and click the registration button<
description of little ant CFT:
directly share different contracts on friends to get physical strength value
the system gives the novice contract, and the superior gets physical strength value at one time; Each time the direct sharing friends re cast the contract, they will increase their physical strength (according to the number of times the direct sharing friends complete the contract)
calculation method: the physical strength obtained by the superior = (the physical strength obtained by directly sharing the task on a friend = 30} * the number of times the subordinate completes this task
turning into a CFT is 1:3 to increase physical strength
being given a CFT is 1:3 to increase physical strength
giving 1 CFT is 1:1 energy consumption value
the CFT transferred out to ctc1 is 1:1 energy consumption value
1、 Put the al power automatic transfer switch on the debugging platform, connect the corresponding power line according to the correct phase sequence, and connect the phase line with the neutral line (zero line) according to the position
ring the debugging of two pole and three pole switches, the common and standby zero lines should be connected to the neutral line terminals (NN and RN) respectively
Third, set the al power supply automatic transfer switch in the automatic switching and automatic recovery mode. If the two power supply voltages are normal, the switch should be placed in the common power supply position and the common power supply should be closed Four, set common power supply Na, Nb, NC, NN any phase open phase, al power supply should be automatically converted to standby power supply, if the common power supply returns to normal, should be converted back to the common power supply V. adjust the voltage of any phase of common power supply to the preset undervoltage value, and the al power supply shall automatically switch to the standby power supply. When the common power supply returns to normal, the switch shall return to the common power supply
extended data:
al power transfer switching apparatus is an electrical apparatus that converts one or more load circuits from one power supply to another. It is composed of one (or several) transfer switching appliances and other necessary appliances, which is used to monitor the power supply circuit and automatically transfer one or several load circuits from one power supply to another. In the electrical instry, it is referred to as "al power automatic transfer switch" or "al power switch"
series al power supply, when the common power fails suddenly or is cut off, it can be automatically put into the standby power supply through the al power switch (the standby power supply can also be supplied by the generator under small load), so that the equipment can still operate normally. The most common are elevator, fire control, monitoring, lighting, etc
the al power supply consists of a transformer with a middle tap in the secondary winding, a bridge rectifier and two filter capacitors with identical parameters
the positive and negative poles of the two capacitors are connected to one point for grounding, the middle tap of the secondary winding of the transformer is grounded, the other ends of the winding are respectively connected to the two AC input terminals of the bridge rectifier, and the remaining positive and negative poles of the two capacitors are respectively connected to the positive and negative poles of the rectifier output terminal. The positive pole of the capacitor and the ground wire constitute a positive power supply, and the negative pole of the capacitor and the ground wire constitute a negative power supply
as long as the two groups of power supply are respectively connected to the power incoming side of the two air switches, and the load is connected to the outgoing end of the AC contactor
before the installation of wiring, the appearance of the distribution box should be checked to check the correctness of wiring, and the insulation, conction and grounding of each component should be checked; After the inspection, a three-phase 5 AMP switch is used as the test power switch, and the live simulation test is carried out on the distribution box to ensure that it can basically meet the requirements after installation. When connecting two groups of power supply, we should determine which power supply has priority, connect the priority power supply to the side without time delay, and connect the standby power supply to the side after time delay; When there is no connection at the lower end of AC contactor, the same phase of two groups of power supply should be connected to ensure that any group of power supply can ensure normal power supply. After the connection is completed, the power supply switching condition shall be tested: one group of power supply shall be powered respectively, and the switch shall be turned to the main power supply, backup power supply, automatic position, etc. to check the switching condition of two contactors, as well as the synchronous closing condition of each phase, contact connection condition, etc. If you want to check the load, you must also send the rated load for inspection. For the inspection of live equipment, the safety operation proceres must be observed to ensure the safety of the implementation process.
another problem is that the two power supplies are not fixed in the chassis. I think you should sell the two power supplies that are not enough, and then buy one that is enough. This will not affect the appearance.
The use method is as follows:
1. When the power is cut off for some reason, and the power supply can not be restored in a short time, the standby power supply must be enabled:
1. Cut off the circuit breakers of the municipal power supply (including the circuit breakers of the control cabinet in the distribution room, the municipal power supply breaker of the al power switch box), pull the al switch anti backfeed switch to the side of the self-contained power supply, Keep the self-contained power supply circuit breaker in the al power switch box in the off state
② start up the standby power supply (diesel generator set) and close the air switch of the generator and the circuit breakers in the control cabinet of the self-contained power supply in sequence when the standby unit operates normally
③ close each standby power circuit breaker in the power switch box one by one to send power to each load
(4) ring the operation of the standby power supply, the operator on ty shall not leave the generator set, and timely adjust the voltage, plant frequency, etc. according to the change of the load, and deal with the abnormal in time
2. When the power supply is restored, the power conversion should be done in time, the standby power supply should be cut off, and the power supply should be restored:
1. Disconnect the circuit breakers of the self-contained power supply one by one in order: the self-contained power supply circuit breaker of the al power supply switching box → the circuit breakers of the self-contained power supply distribution cabinet → the main switch of the generator → turn the al switch to the side of the power supply
(2) shut down the diesel engine according to the steps (3) close each circuit breaker one by one from the main switch to each branch switch in sequence, and put the double power switching box from the circuit breaker in the closed position Check whether the indication of instruments and indicator lights are normal, and start the cooling fan in the transformerdouble power automatic transfer switch (referred to as double power transfer switch) is a kind of molded case circuit breaker or load switch
extended data:
manufacturing principle of al power transfer switch:
1. Adopting double row compound contact, transverse connection mechanism, micro motor pre energy storage and microelectronic control technology, zero flashover (without arc extinguishing cover) is basically realized. Reliable mechanical interlocking and electrical interlocking technology are adopted. Zero crossing technology is adopted
It has obvious on-off position indication, padlock function, reliable isolation between power supply and load, high reliability and service life of more than 8000 times. Mechatronics design, switch conversion accurate, flexible, reliable, good electromagnetic compatibility, strong anti-interference ability, no external interference, high degree of automation3. The automatic type does not need any external control components, with beautiful appearance, small volume and light weight. The logic control board manages the motor directly installed in the switch with different logic, and the operation of the gearbox ensures the position of the switch
4. The motor is of polychloroprene insulation damp heat type. The motor is equipped with safety device and trips when the humidity exceeds 110 ℃ and the over-current state. When the fault disappears, it will be put into operation automatically. The reversible rection gear is straight gear
for reference, but you need to be able to mount the chassis
When the circuit is designed according to the single power supply, the ground wire is connected to the positive or negative side of the power supply according to the requirements, the power terminal of the operational amplifier is connected to the positive and negative side of the power supply respectively, and the signal input and output are connected to the ground
the circuit is designed to use al power supply, the ground terminal of the op amp is connected to the power supply ground, the power terminal of the op amp is respectively connected to the positive and negative sides of the power supply, and the signal input and output are connected to the ground
The input and output ofsignal are suspended, so the circuit needs to be designed separately. When using double power supply, double power supply should have normal ground wire, positive voltage and negative voltage of power supply should be consistent as far as possible, and filtering should be good
extended data
the 220kV Chunshu substation put into operation on October 29 provided new power for haoying traction station. The substation is located in Chengnan New District of Fuyang City. It started construction in November 2018 and took 11 months to complete, three months ahead of the milestone plan. In order to do a good job in the construction of supporting lines for high-speed railway traction station, State Grid Fuyang Power Supply Company Co., Ltd. plans the construction progress, organizes and implements the work requirements of "high, detailed, accurate, strict and precise"
strictly implement the safe and civilized construction and standardized operation, plan and organize the commissioning, acceptance and other links of the substation in advance, timely discover the equipment defects and potential safety hazards, and closely cooperate with the construction project department and equipment manufacturers to clear all kinds of obstacles affecting the power transmission, creating favorable conditions for the smooth power transmission