How to mix mineral ingredients of loader
the weighing instrument of forklift electronic scale can print date and time, display peeling, zero setting, store weight data and information, etc., which will not affect the normal loading work. According to the specified proceres, the accuracy error can be controlled within 1%. All kinds of imported and domestic loaders can be installed. Such as ferroalloy ingredients, gypsum ore ingredients, these can be installed and used
Operation method:
1. After the installation of the whole machine and the empty running test, the storage hoppers can be fed respectively, and the discharge gate of the cement silo and the feeding port of the screw conveyor can be opened for debugging
2. Start up according to the instruction manual of batching controller
3. Input the set value of sand, stone and cement according to the requirements of the instruction manual of batching controller. If one of the materials is not used, the set value must be zero
4. In the batching process, when the weight of the material in the weighing hopper reaches the set value, the feeding belt conveyor will stop automatically, but at this time, a part of the material still falls into the weighing hopper from the air, and the weight of this part of the material is called the drop
In order to ensure the accuracy of proportioning, the drop value of materials must be corrected. According to the different batching controllers, the way to modify the drop value is different. XK-314 batching controller is manual correction, and other batching controllers are automatic correction, so there is no need for user correction After batching, record the actual weight value (display value) of each stage: material I, material I + material II, material I + material II + material III, material I + material II + material III + material IV, and then calculate the drop valuein order to ensure the batching accuracy, the drop value of materials must be corrected. According to the different batching controllers, the way to modify the drop value is different. XK-314 batching controller is manual correction, and other batching controllers are automatic correction, so there is no need for user correction
extended data:
ring batching and metering, the difference between the set value (advance) and the actual value is between the time when the electrical control signal sends the stop batching command and the time when the material really falls into the metering bucket, so the control instrument sends the stop signal in advance before the material reaches the actual value, The part of the material falling after the signal is called drop
that is: actual number - set number = drop (this drop batching machine instrument can be automatically corrected)
before work, the loader (manual feeding can be used when the batching machine is installed underground) supplies sand and stone materials to each storage hopper respectively
according to the instruction of the batching controller, input the formula to the batching controller (the unused materials must be set to 0). After pressing the batching button, the batching machine will start to enter the automatic batching program
its working process is as follows: first, the material I belt conveyor starts to work and transports the material I to the weighing hopper. When the weight of material I in the weighing hopper reaches its set value, the material I belt conveyor stops automatically; Then the belt conveyor of material II starts automatically. When the weight of the material in the weighing hopper reaches the sum of the set values of material I and material II, the belt conveyor of material II stops and the belt conveyor of material III starts to work. After the four kinds of materials are complete, the machine is in the waiting state
at this time, press the discharge button, the discharge belt conveyor works, and the prepared dry concrete is discharged into the mixer hopper. After discharging, the discharging belt conveyor will stop automatically and start the second cycle batching automatically. After the second cycle batching is finished, it will wait for discharging, and so on
the so-called inverse calculation method is to assume a proportioning ratio, and calculate the chemical composition of sinter according to the original data of moisture, burning loss and chemical composition of various raw materials. When the calculation results meet the proction requirements, the proction can be organized according to the proportioning ratio. If not, the calculation can be adjusted again until the proction requirements are met. If there is an error between the calculated ratio and the actual proction, we can analyze the causes of the error and adjust the calculation again. How to determine the proportioning ratio in proction is also a problem that everyone is concerned about. In fact, the determination of proportioning ratio is often based on the requirements of sinter quality index, raw material supply status and raw material composition in ironmaking proction, and combined with the proction cost to carry out reasonable collocation and inverse calculation, so as to obtain the final proportioning ratio
first, when calculating by back calculation method, it is necessary to understand some terms related to ingredients
1. Burning loss: the burning loss of material refers to the percentage of the weight of material sample lost after burning (dry material) at high temperature (1200-1400 ℃) in sintering state
2. Burning resie: the resial amount of material, that is, the resial amount of material after sintering, water discharge and burning loss
3. Moisture content: the moisture content of sintering raw material refers to the percentage of physical water content in raw material, that is, the percentage of evaporated moisture in the weight of sample when a certain raw material (100g-200g) is heated to 150 ℃ for 1H
4. Chemical composition: the chemical composition of a raw material refers to the percentage of an element or compound content in the weight of the dry raw material sample< 2. Specific calculation formula: 1. Burning resie = dry material ratio × 1 - burning loss)
2. TFE in the batch = TFE content of the raw material × The ratio of the raw material
3. The SiO2 in the batch = the SiO2 content of the raw material × The ratio of the raw material
4. Cao in the batch = CaO content of the raw material × The ratio of the raw material
5, MgO in the batch = MgO content of the raw material × The proportion of the raw material
6, Mn in the batch = Mn content of the raw material × The raw material ratio
7, sinter chemical composition
sinter TFE = the sum of TFE brought in by various raw materials ÷ Total sinter resie
sinter SiO2 = sum of SiO2 brought in by various raw materials ÷ Total sinter resie
Cao = sum of Cao brought in by various raw materials ÷ The total burning resie
MgO of sinter = the sum of MgO brought in by various raw materials ÷ The total sintering resie
Mn = the sum of Mn brought in by various raw materials ÷ If there are other requirements, the calculation formula is the same as above< Third, ingredient calculation
ingredient calculation is based on dry ingredients. At present, there are two methods, one is to use dry ingredients, the other is to use wet ingredients, but the purpose is the same. Now most units use wet ingredients, because they can't upload the calculation table, they have to be omitted here.
whether it is to build a simple concrete mixing plant or a standard concrete mixing plant, a concrete batching machine is required. In order to ensure the smooth proction and high efficiency of concrete, it is more necessary to select excellent concrete batching machine. Users must pay attention to the proction details of each component system when purchasing< (1) the opening is leveled and the side slope is not deformed
② the tolerance of overall dimension and blanking dimension shall be within 2mm, and the hole diameter and positioning dimension shall be within 1mm; The material
bucket is welded on the frame, and continuous full welding is adopted around to ensure the welding quality. The rest parts are assembled with bolts
③ no deformation on the whole, no obvious striking marks on each panel, removal of welding slag and burr, and blunt sharp edge
2. Discharge door
① the weld is beautiful and smooth, and there shall be no leakage, crack, slag inclusion in crater, burn through and other defects
② the edge of gas cutting is smooth, the welding slag, welding slag, burr, etc. are removed, and the sharp edge is blunt
③ the tolerance of overall dimension and blanking dimension shall be within 2mm, and the hole diameter and positioning dimension shall be within 1mm
3. The supporting frame
1. The weld is beautiful and free from defects such as missed welding, cracks, slag inclusion in crater and burn through
② the edge of gas cutting is smooth, the welding slag, welding slag, burr, etc. are removed, and the sharp edge is blunt
③ the tolerance of overall dimension and blanking dimension shall be within 2mm, and the hole diameter and positioning dimension shall be within 1mm
4. The support frame shall be flat, the center of gravity shall be vertical to the plane, and no deformation and inclination angle shall be allowed
4. Weighing system
the upper end face of the silo is leveled, and then the support frame is welded to ensure that the silo does not press the belt
5. Belt conveyor transportation
① the weld is beautiful and smooth, and there shall be no leakage, crack, slag inclusion in crater, burn through and other defects
② remove welding slag and flying slag
③ the edge of gas cutting is smooth, the motor runs smoothly, and the belt does not slip
[component of concrete batching machine]
concrete batching machine is a gravel batching device using loader or belt conveyor, which can be used together with mud bin and other equipment, with more than three kinds of materials. It can be used together with various types of mixers and other metering devices, and can be combined into a full-automatic and semi-automatic mixing station
this machine can effectively ensure the accuracy of cement, sand, stone and other mix proportion, and further improve the accuracy of weighing by using electronic weighing system. The top panel can be reced or removed as needed, which can greatly rece the labor intensity of the feeding part and increase the convenience of construction
the batching machine is composed of three parts: feeding system, weighing system and electrical control system. Combined with the corresponding concrete mixer, it can form a variety of different forms and specifications of the combined mixing station, and the cost is only 1 / 2-1 / 3 of the same specification of the mixing station, and the mobile installation is very convenient. It is an ideal equipment for the proction of high-quality concrete on site
the concrete batching machine series is a kind of automatic batching equipment used with mixer. It can automatically complete the proportioning program of sand, stone and other materials according to the concrete proportioning designed by users. This series of procts adopt electronic weighing and digital display. It has the advantages of accurate weighing, fast speed, strong control ability and easy operation. It can form a concrete mixing station with the mixer.
The annual electricity consumption is 49056 kwh. Calculation formula: 0.4KW × 24 lights × 14 hours × 365 days = 49056 kwh
The electricity charge ofis 26980.8 yuan. Calculation formula: 49056 kWh × 55 = 26980.8 yuan
a kilowatt per hour, so 400 watts is converted to 0.4 kilowatts in calculation
extended data
degree, the commonly used unit of domestic electricity in China, namely kilowatt hour, the symbol is kW · h, and the power consumption of 1000 Watt equipment is 1 degree per hour. Kilowatt hour is usually called "degree", is the unit of electric work, symbol: kW · h, the calculation formula is power times time. Suppose that the power of a power consuming device is 2500 watts, that is, its power consumption per hour is 2.5 kwh, that is, 2.5 kwh per hour