Jinpeng mining machinery official wechat
as a pioneer of general contracting project in mining instry, Yantai Jinpeng Mining Machinery Co., Ltd. provides general contracting services for domestic and foreign customers, including beneficiation experiment, mine design, equipment manufacturing, installation and commissioning, personnel training and management contracting. Jinpeng people always adhere to the tenet of technology, high efficiency, quality, safety and customer satisfaction, Try our best to complete every project successfully<
according to the ore properties and ore feasibility study report, Jinpeng beneficiation engineer has developed a cyanidation process for the project, which meets the requirements of the project:
process description
1 feed screening system
the raw ore is transported to the raw ore bin by truck, the raw ore bin is equipped with a lattice screen, and the large particles on the screen are broken manually by hydraulic hammer, Until it falls into the ore bin, a belt feeder is installed at the lower discharge port of the ore bin, the materials are fed into the circular vibrating screen for screening by 1 ᦇ belt conveyor, the procts on the screen are fed into the waste separation device, the wastes are sorted manually and transported to 4 ᦇ belt conveyor by 3 ᦇ belt conveyor, and the procts under the screen are fed into the steel structure powder ore bin by 2 ᦇ belt conveyor
2 grinding classification system
the ore in the fine ore bin is fed to the 4 ﹥ belt conveyor by the belt conveyor, and then fed to the energy-saving ball mill by the belt conveyor. The discharge of the ball mill is pumped into the cyclone group by the slurry pump for classification, the underflow of the cyclone returns to the ball mill for regrinding, and the overflow enters the concentration leaching system after impurity removal by the impurity removal screen
3 thickening leaching system
the pulp is concentrated by the high-efficiency reformed thickener, the overflow flows into the circulating water tank, the bottom flows through the rubber pump into the leaching tank, and the leaching agent is added at the same time. After the two leaching tanks are pre leached, the activated carbon is adsorbed. The activated carbon is added to the final leaching tank, and then graally runs to the front leaching tank according to the regulations. When the activated carbon runs to the third leaching tank, the activated carbon is added to the final leaching tank, When the gold content meets the requirements, the air lifter is used to lift the vibrating screen for carbon slurry separation, the slurry is returned to the leaching tank, and the gold loaded carbon is sent to the desorption electrolysis system
4 Analytical electrolysis system
the gold loaded carbon enters the desorption column after washing and impurity removal in the carbon storage tank, and the desorbed solution prepared by the desorbing solution tank is fed from the bottom of the desorption column by heating and pressurizing, and the gold cyanogen complex in the gold loaded carbon is desorbed, filtered by the filter and then sent to the electrolytic tank for electrolysis to obtain gold mud
5 dosing system
there are many dosing points in the carbon pulp plant. In order to ensure the continuous and accurate dosing, Jinpeng's own patented touch screen computer dosing machine is used to control the dosing at each point, and the reagent mixing and lime mixing are matched
6 dewatering system
the final tailings of the leaching tank are pumped to the full-automatic box filter press through the buffer tank, and the filtered water flows into the circulating pool for recycling. The filter cake is transported to the tailings yard by belt conveyor, and the tailings are transported to the tailings pond by truck.
the following is the case of Jinpeng:
Sudan 1500t / D carbon pulp plant EPC project
Sudan Sahara 1000 / 500t / d
cil100t / D CIL plant (Indonesia)
1 million T / a tin ore dressing plant (Bolivia)
1 million T / a tungsten tin ore dressing plant (Kyrgyzstan)
217 road
30 minutes
|
2.4km
|
walk 480m
railway station
walk 480m
Qing railway station
get on
217 road
3 stations
Qingyi Affiliated Hospital Station
get off
bus line: Metro Line 3, the whole journey is about 16.7km
1. Take Metro Line 3 from Haier Road, pass by 14 stations, and reach Renmin Huitang station
2. Walk about 1.1km to Qingyi affiliated hospital
bus line: tunnel No.3 → Metro Line No.3 → No.364, the whole journey is about 47.3km
1. Walk about 450m from Huang Development Zone to the East Office Center Station of the government agency
2. Take tunnel No.3, pass 7 stops, and reach Xilingxia Road railway station
3. Walk about 520m to Qing station
4. Take Metro Line No.3, pass 20 stops, To Yongping Road Station
5, walk about 260 meters, to xiaowengcun station
6, take bus 364, after 4 stops, to Cangkou Stadium Station
7, walk about 560 meters, to the Central Hospital of Licang District, Qing