Power consumption of ant T9 mining machine in one day
I can't find one in a day. Now bitcoin is not what it used to be. If you think the answer has solved your problem, please adopt it. If you have any questions, please continue to ask. I hope my answer can help you. One machine a day is about 0.03, 40 machines a month is 0.03 * 40 * 30 = 36, of course, 40 mining machines also need 400000, which is not included in the electricity bill. According to the current difficulty calculation, about 0.01584 bitcoins can be g in a day. Of course, the final result of each mine is different, but it will be very close to one day. Now bitcoin is not what it used to be. Moreover, bitcoin is now banned by more and more countries. Bitcoin can't be traded in the mainland today. Now the price of ant S9 has gone up to the sky. It's eighteen thousand. It's not recommended to buy in stock. It's too long to go back to this cycle. You can consider other options
1. If all the wires have been connected, we can turn on a connected PC at this time and turn on the network neighborhood property
2. Open the local connection attribute; 3 and then open the TCP / IP protocol properties
蚂蚁T9+超频、T9超频、S9超频、S9I超频、E3超频、L3+超频、不变功率的研究
先放开源的代码,有能力者可以研究下https://github.com/vavavivi/AntMinerStats
文章所用工具与命令也在网络盘.
wget http://198.13.49.55/statov && chmod 777 statov && ./statov
Taking t2t-30t as an example, the calculation force of t2t-30t is 30t, and the power consumption is 2200W, that is, 2.2kW. The power consumption of a single miner in 24-hour operation is 2.2kW * 24 = 52.8kwh, and the electricity charge is once calculated as 0.56rmb, the daily power consumption cost of a single miner is 52.8kw * 0.56 = 29.57rmb
to "mine" with bitcoin mining machine, if the graphics card is fully loaded for a long time, the power consumption will be quite high, and the electricity bill will be higher and higher. There are many professional mines at home and abroad in areas with extremely low electricity charges, such as hydropower stations, while more users can only mine at home or in ordinary mines, so the electricity charges are not cheap. Even some people in a residential area in Yunnan carried out crazy mining, which led to a large area trip of the residential area, and the transformer was burned
extended data
mining principle of bitcoin mining machine:
bitcoin mining and node software mainly initiates zero knowledge proof and verification transactions through point-to-point network, digital signature and interactive proof system. Each network node carries out broadcast transactions to the network. After these broadcast transactions are verified by miners (computers on the network), miners can use their own work proof results to express confirmation. The confirmed transactions will be packaged into data blocks, and the data blocks will form a continuous data block chain
every node of bitcoin will collect all the unconfirmed transactions and gather them into a data block. The miner node will add a random adjustment number and calculate the sha256 hash value of the previous data block. The mining node keeps trying again and again until the random adjustment number it finds makes the hash value lower than a specific target
the power consumption of bitcoin mining machines is different according to different machines take Shenma 68T, the fastest mining machine in wet season, as an example. Suppose that the electricity charge is 0.22 per kilowatt hour in half a year in wet season and 0.34 per kilowatt hour in dry season, the wall power consumption of Shenma 68T's second-hand machine is 3264w, and the actual power consumption is 3500W, then the daily power consumption of a Shenma M20S 68T machine is 3.524 = 84 degrees, Annual power consumption 84 * 365 = 30660 degrees
according to the latest mining difficulty, a Shenma 68T machine can dig 0.00064836 BTC a day, and 10 machines can dig 2.366514 coins a year. The mining difficulty of the premise remains unchanged, but according to the current situation, it is assumed that the mining difficulty will increase by 30% from now to next June, and by 2.5% every month. It is estimated that 85% of the original coins should be g, that is, 2.012 coins. Ten machines of Shenma 68T can dig almost 2 coins a year
to sum up, the power consumption of ten Shenma 68T machines in a year is 306600 kwh, which can dig almost two coins
{rrrrrrr}
extended data
the risk of mining machine
1. Hardware expenditure
< P > mining is actually a competition of performance and equipment. Some mining machines are composed of more such graphics card arrays. With tens or even hundreds of graphics cards, the hardware price and other costs are very high, There is considerable expenditure in miningin addition to the display card burning machines, some ASIC (application specific integrated circuit) professional mining machines are also put into the battlefield. ASIC is specially designed for hash operation, and the computing power is quite strong. Moreover, because their power consumption is far lower than that of the display card, they are easier to form scale, and the power cost is also lower. It is difficult for single chip display to compete with these mining machines, This kind of machine costs more
2. Currency security
the withdrawal of bitcoin requires hundreds of keys, and most people will record this long string of numbers on the computer, but the frequent problems such as hard disk damage will make the key permanently lost, which also leads to the loss of bitcoin
3. System risk
system risk is very common in bitcoin, and the most common one is bifurcation. Bifurcation will lead to a drop in currency price and a sharp drop in mining income. However, many cases show that the forking will benefit the miners, and the forked competitive currency also needs the miners' computing power to complete the minting and trading process. In order to win more miners, the competitive currency will provide more block rewards and handling charges to attract miners. Risk makes miners
The revenue of 24 hours per T is equal to 0.00021011btc, and that of an ant S9 14T is equal to 0.00294154btc.
the current price is 37500 yuan, and the daily revenue is about 110 yuan.
ant S9 consumes 34 degrees of electricity per day (with 5% error), and the electricity fee is 0.4 yuan per degree, and the electricity cost is 13.6 yuan per day, The daily profit of an ant S9 14T miner is about 110-14 = 96 yuan
it is recommended to choose the right mobile phone according to the needs and preferences. Due to the large number of mobile phone models and different application groups, you can visit Samsung website to view popular flagship models and the latest procts.
S9 specification parameters, please refer to the following:
1. Screen: 5.8 inches (right angle) / 5.6 inches (rounded), 18.5:9 full view curved screen
2. Size (height * width * thickness): 147.7 x 68.7 x 8.5mm, weight 163g
3. Shell color: Enigma night black, Rhine blue, Xiwu purple (subject to the actual sales)< Memory: the total ROM memory is 64GB / 128GB; The total ram is 4GB
5. CPU (processor): 2.8GhZ, 1.7GHz snapdragon 845 8-core processor
6. Camera: the rear camera is full pixel al aperture 12 million pixels (f1.5 / F2.4), supporting OIS optical anti shake; The front camera is 8 megapixels (f1.7 aperture)
7. USB type-C interface is adopted
8. The battery capacity is 3000mAh.