Realization of automatic machine following by hydraulic support
The methods are as follows; Take iPhone operation as an example:
1. First, you need to enter the peace elite game, as shown in the figure
the biggest difference between the golden island map and other modes is that the above ground materials of the Golden Island are not weapons and ammunition, but all gold bars
there are three kinds of gold bars found at present:
one: give 20 gold bars after picking up
one pile: give 50 gold bars after picking up
one pile: give 100 gold bars after picking up
& 65532
almost every house has hundreds of gold bars. After playing these games, the basic gold bars are enough, so we don't have to worry about the problem of insufficient gold bars Moreover, gold bars don't occupy the space of the backpack, so when you see gold bars, you can pick them up, and if you have more gold bars, you can give them to your teammates who don't have them)
next, Let's talk about how to get gold bars:
1. Search materials normally
2. Get gold bars from the enemy's box
3. When the poison ring is refreshed, the system will automatically give gold bars ranging from 300 to 500 (approximately)
4. Get gold bars from the underground mining machine (400 at a time)
first, We will see a button similar to a shopping cart on the operation panel<
there will be a number at the bottom, which shows the number of gold bars you have. You can buy a lot of things in the store by clicking on it.
Zhiqiu has a general look, except for the air dropped weapons and the grenades removed from this map, you can buy other M4, level 3 head and level 3 A, and the price is not particularly expensive, This player can really become a mobile resource package
at last, you may find this collection column. You can click "Edit collection" to put your commonly used materials here, so as to avoid the trouble of searching
sticky bomb:
it can stick to most buildings, and the detonating time is the same as that of a grenade, which is six seconds. Before detonating, it will make "diddiddidi" noise. If the wall is made of red brick, then the wall will collapse, and the damage caused is basically the same as that caused by the grenade, ignoring the penetrating damage of the building
it is worth mentioning that the map of golden island has directly removed the grenade, but the other throwing weapons are still there. It seems that the only way to attack the building in the future is to rely on the burning bottle
so far, Golden Island is the only map supporting destruction of buildings, which also adds more playability for players
iron fist rocket launcher:
as the first missile weapon launched in the classic mode, its missile attribute damage is basically the same as RPG. Iron fist rocket launcher can not only crack the brick wall like a sticky bomb, but also damage the tail smoke of its tail, so when teammates pick up this weapon, try not to get too close to the ground to avoid being injured by mistake
but the fly in the ointment is that he can only launch once. After that, the iron fist bazooka will disappear from your weapon bar, so in the final circle, the rich guys can play. Maybe the iron Headed Boy will turn into a wisp of smoke under your missile.
It is composed of hydraulic cylinder, bearing structure, pushing device, control system and other auxiliary devices
The hydraulic support is composed of hydraulic cylinder (column, Jack), load-bearing structure (top beam, shield beam and base), pushing device, control system and other auxiliary devices The support is supplied by emulsion pump station installed in roadway or chamber. When the pressure emulsion enters the column through the control system, the support will raise the initial support roof. With the sinking of the roof, the support resistance of the support to the roof increases. The pressure of the locking liquid in the column is limited by the safety valve to realize constant resistance support
extended data:
requirements for the use of hydraulic support:
1. When the top beam is subjected to horizontal thrust, the column inclines, forcing the return spring to deform. After the support is unloaded, under the action of the return spring, the column and the top beam are reset to ensure that the roof is supported in a normal state ring the next lifting
2. The sub frame still supports the roof, the main frame is lowered, and the main frame is moved forward one step by using the moving jack with the sub frame as the fulcrum and guided by the guiding mechanism
3. The main frame supports the top plate, the sub frame lowers, the main frame is used as the fulcrum, the sub frame moves a step in the direction of guidance, and then supports the top plate, so as to complete a work cycle
column is one of the main components of hydraulic support to bear roof pressure, which is the main component to connect the support top beam and base, and is used for hydraulic support to bear roof load and adjust support height. The column is the pressure bearing part of the support, which is under high pressure for a long time. In addition to reasonable working resistance and reliable working characteristics, it must also have sufficient compressive and bending strength and good sealing performance. Reliable operation and long service life
Henan Hexin
the pushing jack extends and the pushing rod extends to push the scraper conveyor forward one step, then the pushing jack retracts and the pushing rod retracts. The scraper conveyor reacts on the support and drives the support forward one step to complete the hydraulic support moving
2. Hydraulic support is a kind of hydraulic power device which uses liquid pressure to proce supporting force and realize automatic movement for roof support and management. It is an indispensable supporting equipment for comprehensive mechanized coal mining. The structure used to control the mine pressure of the working face. In the form of external load, the mine pressure acts on the hydraulic support
3. Attention should be paid to when moving the hydraulic support:
(1) before moving the support, open the inlet valve of the support, and clean up the floating coal, floating gangue and other debris in the support, otherwise it is not allowed to move the support; In addition, the roof condition should be checked. When the roof is broken or there is a phenomenon of roof falling, the support should be moved after the treatment, so as to prevent the injury accident caused by excessive roof falling in the process of moving the support; And check whether there are cables, liquid pipes and other equipment in front, if so, clean them before moving them; If it can't be cleaned in time, mark the shelf, and conct comprehensive treatment after shutdown
(2) when moving the support, first lower the column to make the top beam leave the roof, then stop falling the column and move the support quickly; For the broken roof, it is allowed to "move the roof" or "move the frame with pressure"; When the metal net is moved down, the top beam should be separated from the metal net to avoid tearing the net
(3) after the frame is moved, it must be arranged in order to form a straight line; After the front and back of the top beam are connected to the top, adjust the balance Jack properly to make the support achieve the best supporting effect.
the main function of the side guard board of the hydraulic support is to prevent the coal wall from spalling. The side protecting plate is hinged with the side protecting jack, and the hinge axis of the front beam makes rotary movement, and the side protecting Jack supports the pressure from the coal wall
the side guard is a simple welding plate. When it is necessary to protect the wall, the jack can be operated to make the lower part of the plate close to the coal wall. Before the arrival of the shearer, we must take back the protection device to make the shearer pass smoothly and prevent the drum from cutting the front beam. When the distance between beam ends is too large, the side guard board can be pushed out first, but the side guard board must be retracted before the shearer passes. When the roof falls or the distance between the beam ends is too large, the retaining plate can be turned over to temporarily support the roof above the coal wall
Henan Hexin
hydraulic support is a kind of hydraulic power device which uses liquid pressure to proce supporting force and realize automatic moving to support and manage roof, and it is an indispensable supporting equipment for comprehensive mechanized coal mining
the hydraulic support is mainly used in the long wall fully mechanized working face with one-time top coal caving along the floor in horizontal and gently inclined thick coal seam less than or equal to 10 degrees, and it is also suitable for the fully mechanized working face with horizontal slicing and top coal caving in steeply inclined and extra thick coal seam.
the hydraulic support is acted on by the form of external load
in the mechanical system of the interaction between the hydraulic support and the surrounding rock of the mining face, if the resultant force of the supporting parts of the hydraulic support and the resultant force of the external load of the roof acting on the hydraulic support are exactly in the same line, the hydraulic support is very suitable for the surrounding rock of the mining face
hydraulic support is a kind of hydraulic power device which uses liquid pressure to proce supporting force and realize automatic moving to support and manage roof, and it is an indispensable supporting equipment for comprehensive mechanized coal mining
the hydraulic support is mainly used in the long wall fully mechanized working face with one-time top coal caving along the floor in horizontal and gently inclined thick coal seam less than or equal to 10 degrees, and it is also suitable for the fully mechanized working face with horizontal slicing and top coal caving in steeply inclined and extra thick coal seam.
no.596 up (fangjiazui (Provincial Tumor Hospital) - songhaiyuan)
fangjiazui (Provincial Tumor Hospital) - Chenjiawan Huquan Zhuoquan guangbutun Qunguang square jiejiejiekou Hongshan dingziqiao fujiapo Yuemachang guqintai wuqinlu wulixincun wulin qilinlu Shilipu- Erqiao road - Wangjiawan - Longyang village - Wangjiafan - taojialing - shengguan - shengguan community - Hanyang passenger transport center - Wuhan French Street - Golden Harbor - Triangle Lake - Wuhan Sports Center - ningkangyuan - Development Zone No.1 Middle School - Chuangye road - zhuanyang Street - Yangguang Lijing - songhaiyuan (36 stations in total)
205 Road (zhujiating - Zhashan)
zhujiating - Wangjiawan - Longyang Village- Wangjiafan taojialing shengguan shengguan community Hanyang Passenger Transport Center Golden Harbor Triangle Lake Wuhan Sports Center ningkangyuan Development Zone No.1 Middle School Chuangye road Yincheng building private instrial park Dongjing road France village Lixian village Xingfu Village (G318) - Xuefeng Donglin village Quanli village Zhashan (24 stations in total)
596 road downhill (songhaiyuan fangjiazui) Provincial Cancer Hospital)
songhaiyuan Yangguang Lijing zhuanyang Avenue Chuangye Avenue No.1 Middle School of Development Zone ningkangyuan Wuhan Sports Center Triangle Lake Golden Harbor Wuhan French Street Hanyang passenger transport center shengguan community shengguan taojialing Wangjiafan Longyang village Wangjiawan Shilipu Qilin road qilimiao wulin wulixincun wuqin road Guqin Road Qintai Yuemachang Dadongmen fujiapo T-shaped bridge Hongshan jiejiejiekou Qunguang square guangbutun Zhuoquan Huquan Chenjiawan fangjiazui (Provincial Cancer Hospital) (36 stations in total)
597 Road (Dongfeng Design Institute echengn)
Dongfeng Design Institute Checheng South Street Dongfang Instrial Park Yincheng building Chuangye Avenue No.1 Middle School of development Zone Ningkang garden Wuhan Sports Center Xin - Triangle Lake - Golden Harbor - Xinhua Village - shengguan community - taojialing - Wangjiafan - Longyang village - Wangjiawan - Guocikou - Shuanghe village - Shuangn - Yingfang village - Baofeng 2nd Road - Wangjian - Qingnian Road - shuishuilou - Echeng Dun (25 stations in total)