Position: Home page » Pool » Drawing machine vibration rubber block size table

Drawing machine vibration rubber block size table

Publish: 2021-05-10 08:22:13
1. I only know that vibration ore drawing is better. The cost is almost the same when considering the overall cost. Of course, labor, electricity, maintenance, efficiency and other factors should be taken into account.
2.

Vibrating feeder: if the ore is evenly broken, small in size and good in fluidity, swing type or wave type can be selected. It is suitable for elliptical vibration type and directional vibration type
double mass vibrating feeder: the principle of double mass near resonance inertial vibration is adopted. Single row or double row shear rubber springs are arranged at the top and bottom, and the lower pressing plate is connected to the balance body by bolts, and then the left and right side plates are connected with the groove body. It has compact structure, stable starting under constant pressure, and is not affected by the load and jamming of the tank material. The feeding particle size (0-850mm) is large (8-1800t / h). It can be equipped with stepless frequency converter to realize frequency conversion feeding and batching, and remote microcomputer operation and control

3.

1. Before the installation of the seat type drawing machine, the on-site foundation shall be compared with the drawing of the drawing machine. After the inspection, the steel plate shall be embedded. The thickness of the steel plate shall be 20 mm and the flatness shall not be greater than 1.5%
2. After the ore drawing machine is installed, adjust the relative position, and then weld the spring base and the embedded steel plate by spot welding
3. It is required that the two vibrating motors must turn in the opposite direction
4. After installation and running for 1 hour, check whether the body runs smoothly, the yaw is not more than 0.5mm, and the bolt fastening of the vibration motor
5. If the handling capacity is not enough, the exciting force of the vibration motor can be adjusted to achieve the best effect if it is allowed
6. Adjustment of exciting force: A. remove the protective cover; B. loosen the two inner eccentric blocks; C. adjust the two outer eccentric blocks in the same phase and at the same angle; D. tighten the adjusting bolts and install the protective cover; e. the temperature rise of the vibration motor bearing shall not be greater than 80oC (resistance method)
7. During the operation of the ore drawing machine, attention should be paid to whether the movement of the machine body is stable. If abnormal operation or abnormal sound is found, the machine should be stopped immediately for inspection. 8. The bearing of vibration motor shall be lubricated with 3 # lithium grease once a week. The bearing shall be inspected and cleaned once a year to check the wear degree of the bearing. If necessary, it shall be replaced and repaired in time
9. The fastening bolts of the connection parts should be checked frequently to eliminate the hidden danger in time

4. Yes, the first phase of pre-sale of mchain intelligent IPFs exclusive miner, that is, physical miner, has ended. You can see the real object on its official website.
5. It's not a driving school, it's just a theory course training organization set up in the transportation management department! In addition, Jiaxing transportation management department has also innovated the management mode of driver training. Since September last year, the pilot project has been carried out at the municipal level. Ten driver training schools at the municipal level have jointly funded the establishment of the Zhengda motor vehicle driver training service center, which is responsible for the science training and driver training of all driver trainees at the municipal level, It not only improves the efficiency of the model driver, but also standardizes the management of driver training
6. Jiaxing No.1 middle school has a company from Shanghai on Fanggong road. It's said that it's good.
7.

bus line: No.161 → No.33, the whole journey is about 15.2km

1. Take No.161 from Daqiao police station, pass by 14 stations, and reach Jiaxing railway station (also take NO.160 / k160, No.212, No.233, No.232)

2. Walk about 70m to Jiaxing railway station

3. Take No.33, pass by 9 stations, and reach south station of Municipal Transportation Administration Bureau

4. Walk about 90m, Arrive at Zhengda motor vehicle training service

Hot content
Inn digger Publish: 2021-05-29 20:04:36 Views: 341
Purchase of virtual currency in trust contract dispute Publish: 2021-05-29 20:04:33 Views: 942
Blockchain trust machine Publish: 2021-05-29 20:04:26 Views: 720
Brief introduction of ant mine Publish: 2021-05-29 20:04:25 Views: 848
Will digital currency open in November Publish: 2021-05-29 19:56:16 Views: 861
Global digital currency asset exchange Publish: 2021-05-29 19:54:29 Views: 603
Mining chip machine S11 Publish: 2021-05-29 19:54:26 Views: 945
Ethereum algorithm Sha3 Publish: 2021-05-29 19:52:40 Views: 643
Talking about blockchain is not reliable Publish: 2021-05-29 19:52:26 Views: 754
Mining machine node query Publish: 2021-05-29 19:36:37 Views: 750