The miner is noisy
Publish: 2021-03-31 01:38:28
1. No matter what kind of computer, noise is basically a fan problem. If you can't clean up the st on the fan, replace it
2. Did you make a loud noise when you first bought it? If not, maybe it will be better if the machine gets old, parts wear out or impurities fall into the machine
3. All the graphics cards are in the limit running state, and the noise of at least 6 graphics cards in a miner will be very loud.
4. bitcoin mining machine is also a computer. How much noise does the computer make when it is turned on is equal to its noise
bitcoin mining machine is a kind of computer used to earn bitcoin. This kind of computer generally has professional mining chips and works in the way of burning graphics card, which consumes a lot of power. It is one of the ways to get bitcoin that users download software from personal computer and then run specific algorithm to get corresponding bitcoin after communicating with remote server.
bitcoin mining machine is a kind of computer used to earn bitcoin. This kind of computer generally has professional mining chips and works in the way of burning graphics card, which consumes a lot of power. It is one of the ways to get bitcoin that users download software from personal computer and then run specific algorithm to get corresponding bitcoin after communicating with remote server.
5. This means that the pressure is too high, so I suggest you rece it.
6. The result upstairs is correct. There is no way to write the formula here. The superscript can't be typed
L = 10lg (10 ^ (L / 10) + 10 ^ (L / 10)) = 10lg (2 * 10 ^ (L / 10)) = L + 10 * LG2 = 60 + 10 * 0.301 = 63
pro, give me a good comment
L = 10lg (10 ^ (L / 10) + 10 ^ (L / 10)) = 10lg (2 * 10 ^ (L / 10)) = L + 10 * LG2 = 60 + 10 * 0.301 = 63
pro, give me a good comment
7. Seventy or eighty sewing machines make a lot of noise. To tell you the truth, it's still very noisy. It's estimated that there are more than seventy or eighty decibels. You can make sure.
8. It's not big. You can hardly feel the sound. There's an evaluation. You can search it.
9.
as a common stone crusher in modern mining machinery enterprises, it is a kind of equipment with high noise pollution, and its noise problem has always been one of the problems that mining machinery enterprises need to solve
(I) machine failure
machine failure will lead to additional noise generation, such as belt deviation will lead to the sound of proct belt hitting, such as discharging problems, noise generated by excessive stone hitting crusher, noise of machine common vibration caused by machine foundation falling. If there is such noise, the first time to contact technical personnel to solve the problem, to avoid greater losses< (2) rece the noise of sound source
1. Transform the proction process and select low-noise equipment< 2. Improve the machining and assembly accuracy to rece the noise caused by mechanical vibration and friction
3. For high-pressure and high-speed airflow, the pressure difference and velocity should be reced, or the shape of airflow nozzle should be changed
4. Add rubber under the machine and lubricating oil to the machine to rece its own noise. The crusher should add lubricant regularly to protect the machine
5 It should be square above the feeding port) after widening, it can block the sound. The entrance of the crusher can be covered and the noise can be effectively reced< (3) control on the way of communication; 1) reasonable design on the overall layout. When arranging the plane design of the factory and mine, the main noise source workshop or device should be far away from the workshop, laboratory, office, etc. which requires quiet, or the high noise equipment should be concentrated as far as possible for easy control. The terrain and wind direction should be fully considered in the design of the field proction site, and the sound insulation wall can be appropriately added for noise treatment
2. Use additional barriers to prevent noise transmission, or use natural terrain such as hills, slopes, forests, grass or tall buildings that are not afraid of noise, or add structures
3. The directivity of sound source is used to control the noise, such as adopting sound-absorbing cotton and other schemes, such as turning the exhaust ports of high-pressure boiler, blast furnace and oxygen generator towards the field or sky, so as to rece the impact on the environment< (4) protection of the recipients; 1) personal protection for workers, such as wearing earplugs, earmuffs, helmets and other anti noise articles
2. To shorten the working time of workers in high noise environment, workers should work in rotation< (5) other measures.
noise elimination, sound absorption, sound insulation, vibration isolation, vibration rection and other schemes are adopted to deal with the noise
in a word, actively dealing with the noise problem caused by modern instry is not only the problem of safety proction and protection of workers, but also the problem of social conscience of an enterprise.
as a common stone crusher in modern mining machinery enterprises, it is a kind of equipment with high noise pollution, and its noise problem has always been one of the problems that mining machinery enterprises need to solve
(I) machine failure
machine failure will lead to additional noise generation, such as belt deviation will lead to the sound of proct belt hitting, such as discharging problems, noise generated by excessive stone hitting crusher, noise of machine common vibration caused by machine foundation falling. If there is such noise, the first time to contact technical personnel to solve the problem, to avoid greater losses< (2) rece the noise of sound source
1. Transform the proction process and select low-noise equipment< 2. Improve the machining and assembly accuracy to rece the noise caused by mechanical vibration and friction
3. For high-pressure and high-speed airflow, the pressure difference and velocity should be reced, or the shape of airflow nozzle should be changed
4. Add rubber under the machine and lubricating oil to the machine to rece its own noise. The crusher should add lubricant regularly to protect the machine
5 It should be square above the feeding port) after widening, it can block the sound. The entrance of the crusher can be covered and the noise can be effectively reced< (3) control on the way of communication; 1) reasonable design on the overall layout. When arranging the plane design of the factory and mine, the main noise source workshop or device should be far away from the workshop, laboratory, office, etc. which requires quiet, or the high noise equipment should be concentrated as far as possible for easy control. The terrain and wind direction should be fully considered in the design of the field proction site, and the sound insulation wall can be appropriately added for noise treatment
2. Use additional barriers to prevent noise transmission, or use natural terrain such as hills, slopes, forests, grass or tall buildings that are not afraid of noise, or add structures
3. The directivity of sound source is used to control the noise, such as adopting sound-absorbing cotton and other schemes, such as turning the exhaust ports of high-pressure boiler, blast furnace and oxygen generator towards the field or sky, so as to rece the impact on the environment< (4) protection of the recipients; 1) personal protection for workers, such as wearing earplugs, earmuffs, helmets and other anti noise articles
2. To shorten the working time of workers in high noise environment, workers should work in rotation< (5) other measures.
noise elimination, sound absorption, sound insulation, vibration isolation, vibration rection and other schemes are adopted to deal with the noise
in a word, actively dealing with the noise problem caused by modern instry is not only the problem of safety proction and protection of workers, but also the problem of social conscience of an enterprise.