What are the inspection contents of feeder points
Generally speaking, spot inspection is to record and save the observation quantity of the equipment (the operation condition of the equipment observed by eyes, such as oil leakage and mess, combined with the 5S of on-site management), meter reading quantity (the value displayed by some important existing measuring instruments on site), and measurement quantity (the value temporarily measured on site, such as vibration temperature) as the basic data of equipment operation
spot inspection needs to use spot inspection instrument, and there are many disadvantages in the way of paper recording in the past
2. A standing tool with inspection contents is required ring inspection
3. See, hear, smell and touch. Prevention and prevention
4. Strengthen the inspection of key contents of inspection equipment
5. Shift records of equipment workshop
6. Equipment inspection record.
1) the main equipment of the base station, checking whether the indicator light of each mole is normal, using OMT software to find out and deal with the alarm in time, whether the connection between each mole, the feeder transmission line ground wire on the top of the cabinet is connected firmly, measuring whether the system voltage of the cabinet is within the normal range, replacing the st net, and cleaning the equipment
2) base station AC / DC power distribution equipment, the base station AC / DC power distribution system provides power for the whole base station, if the AC / DC system fails, the whole base station will be out of service. During routine inspection, it mainly measures three-phase AC voltage introced by power, three-phase phase line current of switching power supply, neutral line current, DC output voltage, DC output current, etc; Whether the wire and fuse are overheated, whether the power supply is turned off or not, whether the power supply is turned off or not, whether the voltage of primary power off and secondary power off, and whether the parameters of the storage battery are correct, etc; Whether the connection of zero line and ground wire is correct, the ground wire is reliable, the ground resistance is less than 5 ohm, the air switch and cable of AC distribution box are well connected, and there is no potential safety hazard. There is no damage to the lightning protector in the AC distribution box, the lightning protection air switch is closed, the floating charge voltage and load current are normal, and the indicator light and alarm signal of the AC distribution panel are normal. Whether the contact, air switch, fuse and knife switch of AC voltage power supply circuit are overheated. Whether there is oil leakage in the transformer and whether the drop switch is in good condition
3) base station battery, which mainly provides power for the main equipment of base station in a short period of time in the case of power interruption. If the battery can not provide enough power for the main equipment when the performance of the battery decreases, the service will be returned directly if the power generation is not in time. Therefore, ring the daily inspection, the main measurements are the cell voltage of the battery pack, the current of the feeder bus, the voltage drop of the soft wire, whether there is looseness and corrosion at the connector, whether there is leakage and deformation of the battery shell, and whether there is acid mist around the safety valve Regularly tighten the battery connecting strip, clean up the st, and do battery capacity test to master the health of the battery
4) base station air conditioning, base station main equipment and battery have high requirements on the ambient temperature. Too high or too low temperature will directly lead to base station service withdrawal, and high temperature also has a fatal impact on the service life of battery. According to the maintenance experience, 25% of the total number of services returned e to air conditioning failure in the base station, so attention should be paid to the maintenance of air conditioning in the base station. During routine inspection, the working voltage, working current, leakage of refrigerant, cleaning of st net, inspection of condenser, regular cleaning of condenser, unobstructed drainage pipe, no leakage and normal self starting are mainly measured
5) power environment monitoring equipment of base station. The monitoring equipment is responsible for collecting current, voltage, temperature, smoke sensing, water immersion and other information of base station equipment, and timely feedback to the monitoring, so as to achieve early detection and early treatment. During the daily inspection, it is important to check whether the sensors are normal, whether the alarms can be generated artificially, whether the alarms can be uploaded normally, and check the data with the computer room
6) base station transmission equipment, transmission equipment is also one of the key inspection items, daily patrol inspection equipment whether there is alarm, if there is alarm to each computer room to confirm, and timely processing. Clean up the equipment st net, optical cable, transmission line, optical fiber, grounding wire, etc
7) the antenna feeder system of the base station detects whether the antenna feeder is not loose, whether the grounding is good, whether the tag falls off, whether the diversity reception and VSWR are within the normal range, and timely processes the antenna feeder system beyond the range
8) there are no weeds, combustibles, cracks in the floor / wall, doors and windows, keys, anti-theft facilities, ground leakage, collapse, floor drain or air conditioning drainage, tight hole sealing, lighting and fire fighting equipment in the base station room. The ground network facilities are damaged, the cable wiring is disordered, the connector is loose, the power line is overloaded and heated, and the signs and labels are incomplete or fall off
the above measurement data should be carefully recorded and edited into a database, which can be analyzed regularly to detect faults in time, so as to take precautions.
(1) check whether the indicated values of pressure gauge and ammeter are in the specified area and keep stable
(2) check whether the running sound is normal and whether there is noise< (3) whether the temperature of bearing and motor is normal (no more than 60 ℃) ° C)
(4) check whether the cooling water is unblocked, whether the packing pump and mechanical seal leak, if the leakage is within the allowable range
(5) check whether the connection parts are tight and whether the anchor bolts are loose
(6) check whether the lubrication is good and the oil level is normal
precautions for pump inspection
1. Arrange the operator to inspect the pump in the unit area once an hour
2. Matters needing attention ring inspection are as follows:
1) whether the sound and vibration of the running equipment are abnormal, whether the temperature of the bearing box is normal (≠ 75 ℃), whether the liquid level of the bearing box is normal (the liquid level is in the normal range of 1 / 2-2 / 3 of the window), whether the cooling water of the pump seat, mechanical seal and cooler is unblocked, and whether the sealing oil is unblocked, Whether there is emulsification of lubricating oil, whether there is leakage at each sealing point, whether the motor current is normal, whether the motor temperature and bearing temperature at both ends are normal (≠ 75 ℃)
2) oil mist lubrication pump
check whether there is oil in the oil mist distributor, if there is, press the button at the bottom of the distributor upward to discharge the condensed lubricating oil to the ground waste oil recovery box. Pay attention to whether there is leakage in the pipeline of oil mist lubrication system. Check the liquid level of the waste oil recovery box and discharge the waste oil to the designated place regularly. Other inspection shall be carried out according to the inspection notes of the pump lubricated by the oil pool (excluding whether the liquid level of the bearing box is normal)
3) the oil mist generator is inspected according to the oil mist lubrication operation proceres.
1、 Cleaning: the surface of main engine and subordinate equipment is free of st, mud and oil, and background color appears
Inspection of tightness: 1. Whether the bolts of mill, pinion, recer and motor are loose; 2. Whether the fastening bolts of mill barrel, end cover, feeder and big gear are loose; 3. Check whether the coupling bolts are loose (3) lubrication: 1. The oil supply time of the refueling pump is normal, whether the oil supply quantity is normal, and whether there is a phenomenon that a certain pipe does not supply oil. 2. The big and small gears are smooth with proper amount of oil (grease), the oil film between the teeth is uniform, and the meshing surface is free of dryness, metal foam and peeling. The oil level of the internal gear of the recer is normal, and the oil quantity should not be too little or too much. If the oil quantity is too little, it will not have a smooth effect, simply speed up the wear speed of the gears and bearings, and even cause problems in a short time; If the oil quantity is too much, the heat dissipation environment in the body will deteriorate, the body temperature will be too high, and it is easy to form the phenomenon of "oil injection" in the heat dissipation breathing hole and oil leakage in the body seal, which will not only affect the cleaning of the equipment, but also form unnecessary waste. The normal oil level should be two-thirds above the middle of the upper and lower marking lines of the oil dipstick. The oil quality and color shall be normal, the appearance shall be transparent, and there shall be no black viscous phenomenon such as carbon deposition. There shall be no iron filings, sand and other debris in the oil Other aspects of inspection: 1. Whether the feeder has worn through and leaked slurry. 2. Whether the motor and wires have peculiar smell; 3. Whether the sound of the main engine and its subordinate equipment is normal, whether there is gear bump (dry noise), bearing noise, low "buzz" of the motor e to low voltage or single-phase operation; 4. Whether the temperature of motor, wire and bearing is normal, and whether there is mist spray at the heat dissipation breathing hole of recerthe inspection is usually carried out with the five senses of human beings and portable point inspection instruments (such as infrared temperature measurement or infrared thermal imager, electronic audiometer, portable vibration meter, combustible gas concentration detector) according to the established or their own routine inspection route, so as to find the equipment abnormalities or hidden dangers
[main contents of spot inspection equipment by inspectors]:
1. Cleanliness and integrity of the equipment: the surface cleaning of the equipment meets the requirements of the enterprise; There is no shortage of spare parts and accessories for the equipment
2. Connection and fastening of all parts of the equipment: whether the anchor bolts and connecting screws are loose, and whether the equipment is stable
3 equipment lubrication:
3.1 whether the lubrication system is complete
3.2 whether the oil quantity (level) is within the required range
3.3 whether the oil circuit is unblocked
3.4 whether the oil temperature and oil pressure are normal
3.5 whether the lubrication automatic control and signal are normal
3.6 whether the oil quality has changed
4 equipment sealing: check whether the machine, pump, pipeline and valve are leaking, and whether the indication of oil pressure gauge changes
5 temperature and smell of equipment: check whether the temperature of the equipment is normal and whether the smell is abnormal
6 sound of equipment: listen to whether the sound of equipment is normal
7 equipment vibration: check whether the vibration of the equipment is abnormal
8 corrosion of equipment: check whether the equipment is corroded and the degree of corrosion
9 equipment and instrument: the electrical terminal is well sealed, indicating that the displayed value is correct; The valve action is normal and accurate, and the air source pipe has no leakage, etc;
Work content of natural gas line inspector:
1. Wear work clothes and enter the post on time
Be familiar with the layout of all medium and low pressure pipelines, and confirm the accurate orientation of each pipeline3. Prepare the hook, wrench, combustible gas detector, soap pot and key of pressure regulating box
4. Carry temporary record book and inspection record form
5. Maintain the valve well, pipeline, surge tank and other equipment
Check whether the pipeline is in good condition and whether there is pipe exposure according to the inspection plan and inspection cycle. Check whether the sign piles and warning signs along the pipeline are complete, and whether other units have slotted the construction buildings around the pipeline. Check auxiliary facilities and equipment for theft and damage The valve well should be maintained regularly. Check whether the valve well cover and well plate are in good condition, and whether the valve well and its surroundings collapse. Check whether the valve body and flange joint are leaking, and whether there are sundries and water seepage in the valve well8. In case of construction excavation, order to stop work and report to the leader for treatment. In case of mass insurance, report in time and go to the scene to maintain order. If it is found that someone is working on the pipeline, it is necessary to stick to it closely and monitor it 24 hours to ensure the safety of the pipeline
extended data:
operation method of line patrol instrument:
I. work flow: line patrol personnel hold online (GPS + RFID) line patrol instrument and travel along the specified line. The line patrol instrument can not only receive GPS satellite positioning information (time, longitude and latitude) from time to time (outdoors), but also read EM information points (indoors), When arriving at a predetermined location, the location information of the location (longitude and latitude) can be automatically recorded and the location information of the EM information point can be manually read
At the same time, the location information and event information can be automatically sent through GSM / GPRS (CDMA) wireless network or manually sent at a predetermined location. Through the wireless network, the patrol data is transmitted to the database of the management system platform, and the real-time movement track of the patrol personnel with the patrol instrument can be observed on the map of the management software Thirdly, it realizes the positioning, tracking and management of personnel, and the system software can automatically analyze and intelligently process, so as to realize the scientific management of line patrol work