Position: Home page » Pool » Triangle miner keyboard

Triangle miner keyboard

Publish: 2021-04-03 19:50:12
1. Qwertycoin (qwc) was built by geek team in Germany for 18 months. It is a kind of secure anonymous coin, which focuses on privacy and is used for global secure payment
qwc has no pre excavation and no fund-raising. It adopts cryptight algorithm (supporting mainstream mining machine X3 and A8 +) POW mining. At present, its computing power is maintained at about 800mh, ranking second in cryptight algorithm, second only to DERO
the epose consensus initiated by qwc in the world will be combined with pow mining to resist 51% attacks. The advantages can be summarized as follows: security and privacy: providing instant transactions that cannot be traced
fast transaction: the average transaction confirmation time is reced to about 5 seconds; Members are allowed to vote in community decision-making
the unique epose consensus mechanism can be rewarded according to the contribution to the network; The community oriented project suck up huge development space under the strong community consensus. Similarly, the community does not give the force is the same result.
2. This is not very clear. The assembly and proction of mining machines are generally in the Pearl River Delta region, with Shenzhen and Dongguan as the majority
the maintenance of bitcoin mining machines is generally not too difficult. If there are many machines, it is better to return to the factory for maintenance
nowadays, most of the new coins do not need to be mined. For example, Ruitai coins are mined at one time.
3. Just insert it according to the color of the thread
4. Now bitcoin is out of business. The risk is high
5. blockchain is still a concept at present
many fields are using this concept to promote
blockchain is divided into public chain, private chain and alliance chain
the real reconstruction is private, so as to ensure that it will not be changed, but it is too difficult
6. OEM mainly refers to the experimental procts proced by manufacturers to cooperate with each other in R & D work. There is no big difference between OEM and authentic procts. It only needs to be cautious in terms of stability. The procts circulating in the market are basically second-hand or even n-hand procts that have been violently tested, which are equivalent to mining machines and cards
7. This is the Milky way. How much time does it take? How long is it awesome? It is estimated that it is half a year after another. The galaxy
8. Shandong Aluminum Factory in the vicinity of the apple garden community west gate (mining intersection) have sold! I used to buy a good one! There are Mickey and Kitty cartoons
9. AAC team out of the appearance of a triangular host, is a computer host, there is enough new. Entertainment, office and mining are going on at the same time, which is very interesting.
10.

1. Model and specification: ккд— 700 (px-700 / 130) feed mouth 700 mm
2. Feed and discharge particle size: feed particle size: & lt; 550 mm; Ore size: 100-160 mm
3. Type: suspension shaft type
4. Transmission mode: the motor is decelerated by V-belt pulley and connected to the transmission shaft by elastic coupling
5. Maximum lifting capacity of crushing cone: 160mm
6. Eccentricity: upper eccentricity: 21.61mm; Lower eccentricity: 33.37 mm
7. Motor model jr127-8, 130 kW, 735 rpm
8. Shaft speed: 406 rpm
9. Eccentric sleeve revolution, 140 rpm
10. Proction capacity: when the discharge port is 130 mm, the proction capacity is about 300 t / h
11. Lubrication mode: oil pump
12. Overall dimension: 2800 × five hundred and fifty-five × 4415
13. Total weight: 33706kg. 1. Overload operation of equipment is not allowed, such as too much or too large ore feeding, too small ore outlet, etc
2. The maximum lump size of ore feeding should not exceed 80-85% of the width of ore feeding mouth
3. The adjusting gap of the ore outlet should be within the range of 100-160 mm (the crushing cone is 1:3, that is, the crushing cone rises by 6 mm and the ore outlet decreases by 1 mm)
4. It is strictly forbidden for metal iron and other foreign matters to enter the crusher cavity ring operation. If they enter, they should be stopped immediately for elimination. 1. Check whether there is enough lubricating oil in the oil tank, whether the oil quality meets the requirements, and whether the oil filter is not clean
2. Test the oil pump and check whether there is oil leakage in the oil pump and pipeline
3. Whether the oil pressure is between 0.8-1.5kg/cm2
4. Check whether the oil return is not smooth and the oil flow is unstable
5. There is no looseness in the foundation screw of each part of the machine body and the frame interface screw in the frame
6. Whether the screws, pulley and key of the transmission shaft are loose
7. If there are any materials in the crusher chamber, it must be removed before starting
8. Whether the easily worn parts of the engine body (such as broken cone liner and middle frame liner) are seriously worn or cracked
9. Check whether the funnel is blocked or seriously worn
10. Check whether the hand wheel of oil immersed rheostat in electrical part is at zero position
11. Check the contact condition of motor carbon brush
12. It is not flexible to check the distribution box and operating mechanism
13. Check whether the pointer of ammeter is at zero. 1. Operation method of the equipment
(1) before operation, the equipment must be inspected item by item according to the inspection content
(2) start the oil pump first, and start the motor only after the return oil is normal
(3) pay special attention to the sound of motor and crusher when starting, and stop running immediately in case of any abnormality
(4) start feeding after normal operation of the equipment
(5) ore feeding must be stopped when the operation is stopped, and it can only be stopped when there is no ore in the crushing chamber
(6) stop the oil pump feeding
2. Start up operation sequence:
(1) first check whether the oil immersed rheostat is at the zero position and whether the short-circuit switch is open
(2) press the start button
(3) slowly transfer the hand wheel of the oil immersed rheostat to the starting position until the motor reaches the rated speed
(4) close the short circuit breaker
(5) observe whether the indication of ammeter is normal
(6) the motor shall not be started frequently, and generally it shall not be started more than three times continuously
3. Stop operation sequence:
(1) stop feeding before stop, and stop the crusher when all ores in the crusher cavity are discharged
(2) the operator presses the stop button
(3) turn the hand wheel of the oil immersed rheostat back to the zero position and open the short-circuit knife switch
(4) after power failure without notice or shutdown with load, the ore in the crusher cavity must be taken out to facilitate the start-up after power supply

Hot content
Inn digger Publish: 2021-05-29 20:04:36 Views: 341
Purchase of virtual currency in trust contract dispute Publish: 2021-05-29 20:04:33 Views: 942
Blockchain trust machine Publish: 2021-05-29 20:04:26 Views: 720
Brief introduction of ant mine Publish: 2021-05-29 20:04:25 Views: 848
Will digital currency open in November Publish: 2021-05-29 19:56:16 Views: 861
Global digital currency asset exchange Publish: 2021-05-29 19:54:29 Views: 603
Mining chip machine S11 Publish: 2021-05-29 19:54:26 Views: 945
Ethereum algorithm Sha3 Publish: 2021-05-29 19:52:40 Views: 643
Talking about blockchain is not reliable Publish: 2021-05-29 19:52:26 Views: 754
Mining machine node query Publish: 2021-05-29 19:36:37 Views: 750