Gate model of Vibrating Ore Drawing Machine
Publish: 2021-04-05 12:57:46
1. 1. Overview
1.1 main technical features and uses
6m3 bottom side mp car is a kind of special equipment used in underground mine roadway transportation operation system. Its unique structural design makes the car integrate transportation and unloading functions. The 6m3 bottom side mp car developed by our company has the advantages of stable operation, high bearing capacity, accurate unloading meshing track, high load-carrying capacity and low cost It is rable and easy to use and maintain
this equipment is mainly used for ore transportation and unloading in underground roadway or open pit of metallurgical mines
1.2 model composition and its representative significance
the track gauge of 6m3 bottom side mp tramcar is 900mm, and the model is ydcc6-9, where y stands for metallurgical mine, DC stands for bottom side mp tramcar, C stands for tramcar, and the two digits behind represent carriage volume and track gauge respectively
for example, ydcc6-9 refers to the bottom side mp car for metallurgical mines, with a carriage volume of 6m3 and a suitable gauge of 900mm
1.4 executive standard
executive standard of the equipment: JB / t5498-91
2.2 structure description of main parts
2.2.1 carriage
carriage is an important part of the tramcar, which is mainly used to hold ore. when the tramcar carries ore and unloads ore, the carriage bears multi-directional dynamic load
therefore, this part is made of Q345 steel plate and profile, especially for the parts of important parts, the whole steel plate bending process is adopted, so as to fully ensure that the car has enough strength and stiffness
in order to facilitate the continuous loading of ore by trams and improve the transportation efficiency, the structure of the carriage is designed to be overlapped to ensure that the two adjacent trams can be overlapped well. Both ends of the car body are connected with the buffer box by bolts
2.2.2 frame
this part is a structural part, which is the main bearing part of the tramcar
in order to make this part have enough rigidity and strength, it is made of profile and steel plate by welding, and the unloading wheel is installed at the lower side of the middle of the frame
2.2.3 axle part
this part is composed of steering mechanism, spindle, bearing, miner wheel, sealing cover and other parts
the purpose of using the steering mechanism is to fully adapt to the working characteristics of large and medium-sized tramcars, so that the tramcar can turn well when passing the curve, and rece the wheel wear. The special articulated steering mechanism adopts special design, which fully takes into account the strength and structural technology, and has sufficient mechanical properties, convenient maintenance and repair, etc, All kinds of dynamic complex impact loads proced by tramcar running, especially on curved track, are adjusted and steered in any direction
the automatic steering rotary control reset mechanism has been strictly calculated and designed to maintain higher working reliability of the steering mechanism
the main shaft is made of No.45, and the tramcar wheel is made of high-quality engineering cast steel. The rim of the tramcar wheel is 1:20 tapered, so that the tramcar can run along the track center. The rim gauge of the installed tramcar wheel is compatible with the track gauge
the bearings are made by well-known manufacturers to ensure the reliability of bearing quality
the labyrinth seal structure is included in the seal cover, which makes the bearing get good lubrication and seal
2.2.4 automatic hook
this part is an important part of the tramcar. Strict materials, manufacturing technology, detection and test methods are adopted to ensure safe and reliable operation
this part adopts the form of automatic hook. After several improvements, it can effectively buffer the additional impact force when the tramcar collides, and has the characteristics of reliable automatic connection
2.2.5 unloading wheel
the main function of this part is to contact with the curved rail when the ore is unloaded, and the meshing track of the working surface of the unloading wheel and the curved rail surface makes the bottom door of the car turn over, so as to realize the ore unloading
the unloading wheel is installed on the side of the chassis. The processing and installation position of this part meet the working requirements of the ore car when unloading, and it has the characteristics of flexible and reliable rotation
2.2.5 hinge mechanism
the main function of this part is to connect the carriage and the frame. When the ore car is unloaded, the bottom door of the car will open automatically and rotate around the center of the hinge mechanism. When working, the hinge mechanism should be flexible and reliable
the pin in the hinge mechanism is a key part, which is directly related to the safety of the ore car when unloading. Therefore, strict materials, manufacturing technology, detection and test methods are adopted for the pin to ensure the safety and reliability of the work< br />
3、 Technical performance of equipment
serial number, name and specification remarks
1 specification and model ydcc6-9
2 geometric volume (M3) 6
3 maximum load capacity (kg) 16000
4 maximum traction (kg) 6000
5 total length (mm) 5000
6 maximum width (mm) 1800
7 height (mm) 1660 from rail surface
8 gauge (mm) 900
9 wheelbase (mm) 2000
10 wheel diameter (mm) Ф 420
11 diameter of unloading wheel (mm) Ф 350
12 dead weight (kg) 7600
13 connector center height (mm) 725 from the rail surface
14 bottom side unloading
15 executive standard JB / t5498-91
4, equipment installation, debugging and trial operation
in order to facilitate users to directly transport the tramcar to the proction site, the installation personnel can remove the pin in the hinge mechanism to separate the carriage from the frame, Then the carriage and frame are respectively placed on the transport cage or ramp special vehicles for transportation
in order to make it easy for users to directly understand the use of 6m3 bottom side mp tramcar, the tramcar manufacturer is attached with the general drawing of the tramcar, the assembly drawing of the main structure, and relevant technical documents<
4.1 preparatory work
4.1.1 prepare a site with good lifting facilities
4.1.2 lay the required 900 gauge track.
4.1.3 place the 6m3 bottom side mp tramcar on the track
4.2 check
4.2.1 check the accompanying tramcar technical instructions
4.2.2 check whether the tramcar shape is intact
4.2.3 check whether the lubricating oil of each lubrication part of the tramcar is sufficient
4 2.2.4 check whether the fasteners of the connection parts of the tramcar are connected reliably
4.2.5 check whether the hook height of the connection between the tramcars is consistent
4.3 debugging and test run
4.3.1 connect the tramcar with automatic hook
4.3.2 electric locomotive traction tramcar group driving
4.3.3 the tramcar should run stably and reliably without noise Impact, etc.
4.3.4 all rotating parts should be operated flexibly, without collision, scratch, clamping, etc.
4.4 transportation
4.4.1 the user should determine the transportation scheme according to the actual transportation situation on site
4.4.2 remove the pin in the hinge mechanism, Separate the carriage from the frame
4.4.3 erect the carriage and frame in the cage or place them on the ramp special vehicle
4.4.4 the weight and overall dimension of the carriage are 2840 kg and 5000 mm * 1800 mm * 1225 mm
4.4.5 the weight and overall dimension of the frame are 4528 kg and 3472 mm * 1570 mm * 700 mm
4.4.5 the parts shall not be impacted ring transportation
5 Applicable conditions of ore car
5.1 the distance between the bottom plate of the movable chute of the ore loading gate and the upper end of the carriage shall not exceed 250mm. If the ore is loaded by the vibrating ore drawing machine, it shall be determined according to the specific requirements of the vibrating ore drawing machine
5.2 the running speed V of the ore car at the unloading station can be finally determined according to the proction practice. During the trial proction, v = 0.5m/s can be initially taken. The determination of V is to make V as large as possible under the condition that the minerals in the car can be well unloaded in the unloading station, so as to improve the unloading efficiency
5.3 the structural form of the hook of the 14T electric locomotive, the height from the center line of the hook to the rail surface, the size of the wing plates on both sides of the electric locomotive and the height from the hook to the rail surface must be completely consistent with the mine car
6. Use, maintenance and management
the user department should attach great importance to this work, which includes inspection system, use and overhaul system
6.1 carriage
check the welding condition of each part of the carriage, and no desoldering is allowed. If there is any problem, deal with it in time
6.1.1 it is strictly forbidden to throw ore from high places to avoid cracking the bottom of the box
6.1.2 the car cleaning equipment should be designed according to the actual situation of the user department
6.2 frame, buffer and connecting hook
6.2.1 it is not allowed to slide when the car is fully loaded, and it is not allowed to make the mine cars collide violently
6.2.3 the bumps of the buffer shall not be loose. If they are loose, they shall be reinforced or replaced immediately
6.2.4 the connecting parts between tramcars should be checked every shift, and any abnormality should be handled or replaced in time
6.3 axle parts
6.3.1 the axle parts shall be well lubricated, and a regular oil injection system shall be established as required, and the period shall not exceed 3 months
6.3.2 always check the working conditions of the sealing parts at both ends of the axle to avoid water or mineral mud entering the axle, and deal with problems in time
6.3.3 it is strictly forbidden to insert wooden or iron rods into wheel holes to slow down and stop the tramcar ring operation
6.3.4 check whether the connection between axle part and frame part is reliable
6.3.5 the tramcar used shall be numbered, and the account of equipment use, maintenance and management shall be established. It is strictly forbidden to operate the tramcar with "disease" to ensure the normal operation of the equipment
7. Detailed list of wearing parts
name, specification, model, material and quantity
tramcar wheel Ф 420 zg270-500 8 / each tramcar
unloading wheel Ф 350 45 1 / each tramcar
4 rubber springs are specially used according to the drawing / each tramcar
unloading wheel bearing 32318 standard parts 1 / each tramcar
wheel bearing 22319 standard parts 8 / each tramcar
8. Tramcar painting
before the tramcar leaves the factory, the tramcar has been cleaned before painting, the tramcar has been cleaned, and the antirust primer and top coat have been successively applied, The color of the topcoat is selected by the user and implemented by the manufacturer according to the requirements.
1.1 main technical features and uses
6m3 bottom side mp car is a kind of special equipment used in underground mine roadway transportation operation system. Its unique structural design makes the car integrate transportation and unloading functions. The 6m3 bottom side mp car developed by our company has the advantages of stable operation, high bearing capacity, accurate unloading meshing track, high load-carrying capacity and low cost It is rable and easy to use and maintain
this equipment is mainly used for ore transportation and unloading in underground roadway or open pit of metallurgical mines
1.2 model composition and its representative significance
the track gauge of 6m3 bottom side mp tramcar is 900mm, and the model is ydcc6-9, where y stands for metallurgical mine, DC stands for bottom side mp tramcar, C stands for tramcar, and the two digits behind represent carriage volume and track gauge respectively
for example, ydcc6-9 refers to the bottom side mp car for metallurgical mines, with a carriage volume of 6m3 and a suitable gauge of 900mm
1.4 executive standard
executive standard of the equipment: JB / t5498-91
2.2 structure description of main parts
2.2.1 carriage
carriage is an important part of the tramcar, which is mainly used to hold ore. when the tramcar carries ore and unloads ore, the carriage bears multi-directional dynamic load
therefore, this part is made of Q345 steel plate and profile, especially for the parts of important parts, the whole steel plate bending process is adopted, so as to fully ensure that the car has enough strength and stiffness
in order to facilitate the continuous loading of ore by trams and improve the transportation efficiency, the structure of the carriage is designed to be overlapped to ensure that the two adjacent trams can be overlapped well. Both ends of the car body are connected with the buffer box by bolts
2.2.2 frame
this part is a structural part, which is the main bearing part of the tramcar
in order to make this part have enough rigidity and strength, it is made of profile and steel plate by welding, and the unloading wheel is installed at the lower side of the middle of the frame
2.2.3 axle part
this part is composed of steering mechanism, spindle, bearing, miner wheel, sealing cover and other parts
the purpose of using the steering mechanism is to fully adapt to the working characteristics of large and medium-sized tramcars, so that the tramcar can turn well when passing the curve, and rece the wheel wear. The special articulated steering mechanism adopts special design, which fully takes into account the strength and structural technology, and has sufficient mechanical properties, convenient maintenance and repair, etc, All kinds of dynamic complex impact loads proced by tramcar running, especially on curved track, are adjusted and steered in any direction
the automatic steering rotary control reset mechanism has been strictly calculated and designed to maintain higher working reliability of the steering mechanism
the main shaft is made of No.45, and the tramcar wheel is made of high-quality engineering cast steel. The rim of the tramcar wheel is 1:20 tapered, so that the tramcar can run along the track center. The rim gauge of the installed tramcar wheel is compatible with the track gauge
the bearings are made by well-known manufacturers to ensure the reliability of bearing quality
the labyrinth seal structure is included in the seal cover, which makes the bearing get good lubrication and seal
2.2.4 automatic hook
this part is an important part of the tramcar. Strict materials, manufacturing technology, detection and test methods are adopted to ensure safe and reliable operation
this part adopts the form of automatic hook. After several improvements, it can effectively buffer the additional impact force when the tramcar collides, and has the characteristics of reliable automatic connection
2.2.5 unloading wheel
the main function of this part is to contact with the curved rail when the ore is unloaded, and the meshing track of the working surface of the unloading wheel and the curved rail surface makes the bottom door of the car turn over, so as to realize the ore unloading
the unloading wheel is installed on the side of the chassis. The processing and installation position of this part meet the working requirements of the ore car when unloading, and it has the characteristics of flexible and reliable rotation
2.2.5 hinge mechanism
the main function of this part is to connect the carriage and the frame. When the ore car is unloaded, the bottom door of the car will open automatically and rotate around the center of the hinge mechanism. When working, the hinge mechanism should be flexible and reliable
the pin in the hinge mechanism is a key part, which is directly related to the safety of the ore car when unloading. Therefore, strict materials, manufacturing technology, detection and test methods are adopted for the pin to ensure the safety and reliability of the work< br />
3、 Technical performance of equipment
serial number, name and specification remarks
1 specification and model ydcc6-9
2 geometric volume (M3) 6
3 maximum load capacity (kg) 16000
4 maximum traction (kg) 6000
5 total length (mm) 5000
6 maximum width (mm) 1800
7 height (mm) 1660 from rail surface
8 gauge (mm) 900
9 wheelbase (mm) 2000
10 wheel diameter (mm) Ф 420
11 diameter of unloading wheel (mm) Ф 350
12 dead weight (kg) 7600
13 connector center height (mm) 725 from the rail surface
14 bottom side unloading
15 executive standard JB / t5498-91
4, equipment installation, debugging and trial operation
in order to facilitate users to directly transport the tramcar to the proction site, the installation personnel can remove the pin in the hinge mechanism to separate the carriage from the frame, Then the carriage and frame are respectively placed on the transport cage or ramp special vehicles for transportation
in order to make it easy for users to directly understand the use of 6m3 bottom side mp tramcar, the tramcar manufacturer is attached with the general drawing of the tramcar, the assembly drawing of the main structure, and relevant technical documents<
4.1 preparatory work
4.1.1 prepare a site with good lifting facilities
4.1.2 lay the required 900 gauge track.
4.1.3 place the 6m3 bottom side mp tramcar on the track
4.2 check
4.2.1 check the accompanying tramcar technical instructions
4.2.2 check whether the tramcar shape is intact
4.2.3 check whether the lubricating oil of each lubrication part of the tramcar is sufficient
4 2.2.4 check whether the fasteners of the connection parts of the tramcar are connected reliably
4.2.5 check whether the hook height of the connection between the tramcars is consistent
4.3 debugging and test run
4.3.1 connect the tramcar with automatic hook
4.3.2 electric locomotive traction tramcar group driving
4.3.3 the tramcar should run stably and reliably without noise Impact, etc.
4.3.4 all rotating parts should be operated flexibly, without collision, scratch, clamping, etc.
4.4 transportation
4.4.1 the user should determine the transportation scheme according to the actual transportation situation on site
4.4.2 remove the pin in the hinge mechanism, Separate the carriage from the frame
4.4.3 erect the carriage and frame in the cage or place them on the ramp special vehicle
4.4.4 the weight and overall dimension of the carriage are 2840 kg and 5000 mm * 1800 mm * 1225 mm
4.4.5 the weight and overall dimension of the frame are 4528 kg and 3472 mm * 1570 mm * 700 mm
4.4.5 the parts shall not be impacted ring transportation
5 Applicable conditions of ore car
5.1 the distance between the bottom plate of the movable chute of the ore loading gate and the upper end of the carriage shall not exceed 250mm. If the ore is loaded by the vibrating ore drawing machine, it shall be determined according to the specific requirements of the vibrating ore drawing machine
5.2 the running speed V of the ore car at the unloading station can be finally determined according to the proction practice. During the trial proction, v = 0.5m/s can be initially taken. The determination of V is to make V as large as possible under the condition that the minerals in the car can be well unloaded in the unloading station, so as to improve the unloading efficiency
5.3 the structural form of the hook of the 14T electric locomotive, the height from the center line of the hook to the rail surface, the size of the wing plates on both sides of the electric locomotive and the height from the hook to the rail surface must be completely consistent with the mine car
6. Use, maintenance and management
the user department should attach great importance to this work, which includes inspection system, use and overhaul system
6.1 carriage
check the welding condition of each part of the carriage, and no desoldering is allowed. If there is any problem, deal with it in time
6.1.1 it is strictly forbidden to throw ore from high places to avoid cracking the bottom of the box
6.1.2 the car cleaning equipment should be designed according to the actual situation of the user department
6.2 frame, buffer and connecting hook
6.2.1 it is not allowed to slide when the car is fully loaded, and it is not allowed to make the mine cars collide violently
6.2.3 the bumps of the buffer shall not be loose. If they are loose, they shall be reinforced or replaced immediately
6.2.4 the connecting parts between tramcars should be checked every shift, and any abnormality should be handled or replaced in time
6.3 axle parts
6.3.1 the axle parts shall be well lubricated, and a regular oil injection system shall be established as required, and the period shall not exceed 3 months
6.3.2 always check the working conditions of the sealing parts at both ends of the axle to avoid water or mineral mud entering the axle, and deal with problems in time
6.3.3 it is strictly forbidden to insert wooden or iron rods into wheel holes to slow down and stop the tramcar ring operation
6.3.4 check whether the connection between axle part and frame part is reliable
6.3.5 the tramcar used shall be numbered, and the account of equipment use, maintenance and management shall be established. It is strictly forbidden to operate the tramcar with "disease" to ensure the normal operation of the equipment
7. Detailed list of wearing parts
name, specification, model, material and quantity
tramcar wheel Ф 420 zg270-500 8 / each tramcar
unloading wheel Ф 350 45 1 / each tramcar
4 rubber springs are specially used according to the drawing / each tramcar
unloading wheel bearing 32318 standard parts 1 / each tramcar
wheel bearing 22319 standard parts 8 / each tramcar
8. Tramcar painting
before the tramcar leaves the factory, the tramcar has been cleaned before painting, the tramcar has been cleaned, and the antirust primer and top coat have been successively applied, The color of the topcoat is selected by the user and implemented by the manufacturer according to the requirements.
2. Gate hoist, also known as gate hoist, is a large-scale hydraulic machinery proct. Gate hoist is related to the normal operation of hydraulic structures. In addition to meeting the design requirements of general lifting machinery, gate hoist is a kind of large-scale hydraulic machinery proct, It is of special significance to work safely and reliably and operate flexibly and conveniently
gate hoist: gate hoist * Rongcheng hydraulic machinery, gate hoist maintenance standard, gate hoist installation sequence, gate hoist control cabinet, gate hoist schematic animation, gate hoist PLC control cabinet, gate hoist quotation manufacturer, gate hoist operation ticket form, gate hoist model and specification, gate hoist Lanzhou, Working principle of gate hoist, video of steel dam gate, principle of gate hoist, gate hoist, gate hoist company, structural drawing of gate hoist, upper gate of vibrating ore drawing machine, 8t hoist, structure and working principle of gate hoist, How much is the parameter? Is gofair on the market? Schematic quotation? Does gofair charge? What brand is good? Model specifications. What does the price mean? Installation drawing brand ranking quotation company setting, manufacturer price gofair how to charge tutorial gofair which cheap inquiry and transaction quotation manufacturer ranking tutorial. What does gofair mean? How much is gofair? How to use the schematic diagram? How to use the manufacturer's price? How to rank the brand? How to operate the plan? How to operate the quotation? How to operate the multilingual gofair with amazing flow Brand ranking price translation speed classification which good quality price how to use introction, manufacturer ranking quotation Global Online Fair structure gofair structure how much money what brand good manufacturer.
gate hoist: gate hoist * Rongcheng hydraulic machinery, gate hoist maintenance standard, gate hoist installation sequence, gate hoist control cabinet, gate hoist schematic animation, gate hoist PLC control cabinet, gate hoist quotation manufacturer, gate hoist operation ticket form, gate hoist model and specification, gate hoist Lanzhou, Working principle of gate hoist, video of steel dam gate, principle of gate hoist, gate hoist, gate hoist company, structural drawing of gate hoist, upper gate of vibrating ore drawing machine, 8t hoist, structure and working principle of gate hoist, How much is the parameter? Is gofair on the market? Schematic quotation? Does gofair charge? What brand is good? Model specifications. What does the price mean? Installation drawing brand ranking quotation company setting, manufacturer price gofair how to charge tutorial gofair which cheap inquiry and transaction quotation manufacturer ranking tutorial. What does gofair mean? How much is gofair? How to use the schematic diagram? How to use the manufacturer's price? How to rank the brand? How to operate the plan? How to operate the quotation? How to operate the multilingual gofair with amazing flow Brand ranking price translation speed classification which good quality price how to use introction, manufacturer ranking quotation Global Online Fair structure gofair structure how much money what brand good manufacturer.
Hot content