Underground drilling machine
mine boring machine
thirteen cubic meters energy
configure st collector
mine boring machine
thirteen cubic meters energy
configure st collector
mine boring machine
thirteen cubic meters energy
configure st collector
drilling machine is a kind of machinery and equipment that uses harder and sharper tools than the target to leave cylindrical holes or holes on the target by rotary cutting or rotary extrusion. It is also called drilling machine, drilling machine, drilling machine, through hole machine, etc. Through drilling precision parts, to achieve the desired effect, drilling machine has semi-automatic drilling machine and automatic drilling machine, with the increase of human resource cost; Most enterprises consider automatic drilling machine as the development direction. With the development of the times and the improvement of drilling technology of automatic drilling machine, it has obvious advantages to use automatic drilling machine to drill all kinds of metal mold strap, strap and jewelry.
1. Use the drilling machine to move forward and backward, and knock the drill pipe with hammer at the same time,
2. Manually move the rotary rod, hammer the rotary rod, and then use the rotary machine to move forward and backward.
3. If the site conditions permit, hydraulic equipment can be used to pull out the rotary rod,
4, Only when the hole is re drilled in another place can the original rotating rod be abandoned.
boreholes are mainly used for water exploration and drainage, gas extraction, large hole for ventilation, etc
Measurement while drilling (MWD) technology in coal mine is developed from oil drilling technology. However, e to the differences between the construction environment, drilling form, construction purpose and oil drilling, the requirements for measurement method and transmission technology are also different. Specific performance in the following five aspects: 1) poor construction environment in coal mine. In the coal mine underground gas drainage drilling construction to face the coal st, gas, moisture and other environment, not only caused inconvenience to the construction personnel operation activities, but also put forward the requirements of moisture-proof, explosion-proof and other construction equipment. Therefore, the measurement while drilling system generally used in surface drilling can not meet the needs of underground construction in terms of explosion-proof performance
2) according to the layout form and construction purpose of directional drilling in coal mine, MWD is mainly for the purpose of guiding and drilling trajectory description, and provides the measurement results and drilling trajectory to drillers, so that they can control the drilling trajectory at any time. Therefore, the measurement while drilling mentioned here mainly refers to the measurement of attitude parameters. Generally, the formation evaluation while drilling (FEWD) is not carried out for the purpose of exploration. Compared with the measurement while drilling in oil drilling, the requirement of the instrument for the measurement while drilling in coal mine is relatively simple
3) the size of drilling tools used in underground drilling construction is generally small, and the maximum diameter of drill pipe is 89mm, which determines that the diameter of MWD device should be small, so that it can be installed into the drill pipe and can not affect the flow of flushing fluid; The length of MWD should be short, generally not more than 3m, so it is easy to use in underground coal mine roadway. In addition, the construction environment of underground coal mine is bad, and there is no buffer and protection device similar to oil drilling in the drilling process, so the MWD instrument is required to have strong seismic performance
4) measurement while drilling is generally used in the construction of gas drainage hole, water exploration and drainage hole and exploration hole of geological anomaly body in coal mine. No matter the construction cost or the process complexity, it can not be compared with oil drilling. Therefore, the cost of measurement while drilling instrument used in coal mine should not be too high, and it should be simple and practical
5) the layout of borehole in coal mine is mainly near horizontal borehole. In the construction process, clean water is generally used as the circulating medium, and sealing device is generally not used at the orifice, so the drilling technology is different from that of oil drilling. Therefore, in addition to considering the applicability of wire transmission, it is necessary to explore the feasibility of other wireless transmission technologies
Measurement while drilling (MWD) technology in coal mine is developed from oil drilling technology. However, e to the differences between the construction environment, drilling form, construction purpose and oil drilling, the requirements for measurement method and transmission technology are also different. Specific performance in the following five aspects:
1) coal mine construction environment is poor. In the coal mine underground gas drainage drilling construction to face the coal st, gas, moisture and other environment, not only caused inconvenience to the construction personnel operation activities, but also put forward the requirements of moisture-proof, explosion-proof and other construction equipment. Therefore, the measurement while drilling system generally used in surface drilling can not meet the needs of underground construction in terms of explosion-proof performance
2) according to the layout form and construction purpose of directional drilling in coal mine, MWD is mainly for the purpose of guiding and drilling trajectory description, and provides the measurement results and drilling trajectory to drillers, so that they can control the drilling trajectory at any time. Therefore, the measurement while drilling mentioned here mainly refers to the measurement of attitude parameters. Generally, the formation evaluation while drilling (FEWD) is not carried out for the purpose of exploration. Compared with the measurement while drilling in oil drilling, the requirement of the instrument for the measurement while drilling in coal mine is relatively simple
3) the size of drilling tools used in underground drilling construction is generally small, and the maximum diameter of drill pipe is 89mm, which determines that the diameter of MWD device should be small, so that it can be installed into the drill pipe and can not affect the flow of flushing fluid; The length of MWD should be short, generally not more than 3m, so it is easy to use in underground coal mine roadway. In addition, the construction environment of underground coal mine is bad, and there is no buffer and protection device similar to oil drilling in the drilling process, so the MWD instrument is required to have strong seismic performance
4) measurement while drilling is generally used in the construction of gas drainage hole, water exploration and drainage hole and exploration hole of geological anomaly body in coal mine. No matter the construction cost or the process complexity, it can not be compared with oil drilling. Therefore, the cost of measurement while drilling instrument used in coal mine should not be too high, and it should be simple and practical
5) the layout of borehole in coal mine is mainly near horizontal borehole. In the construction process, clean water is generally used as the circulating medium, and sealing device is generally not used at the orifice, so the drilling technology is different from that of oil drilling. Therefore, in addition to considering the applicability of wire transmission, it is necessary to explore the feasibility of other wireless transmission technologies