Qinchi town Yangquan mine
There are 10 companies in total, including Gaizhou Coal Instry Co., Ltd., Simingshan Coal Instry Co., Ltd., Datong Coal Instry Co., Ltd., Shengtai Coal Instry Co., Ltd., Dianshang Coal Instry Co., Ltd., Nanhe Coal Instry Co., Ltd., zhangshigou Coal Instry Co., Ltd., Lanyu Coal Instry Co., Ltd., Qiyi Coal Instry Co., Ltd. and YECHUAN Coal Instry Co., Ltd
Jinmei group has 68 subsidiaries, 10 branches and 1 trusteeship enterprise. In 2015, the company achieved an operating revenue of 179 billion yuan, a profit of 206 million yuan and a tax of 7.032 billion yuan. By the end of 2015, the total assets of the enterprise was 212.2 billion yuan, and there were more than 160000 employees inside and outside Shanxi Province. Ranked 384 in the 2016 world top 500 enterprises and 93rd in the 2016 China top 500 enterprises
Shanxi Jincheng Anthracite Mining Group Co., Ltd. (hereinafter referred to as "Jincheng Coal Group") is a limited liability company controlled by the state owned assets supervision and Administration Commission of Shanxi Province, state development finance company and China Xinda company. It is an important proction enterprise of high-quality anthracite in China, the largest coal seam gas extraction and utilization enterprise group in China, the largest coal chemical enterprise group in China China's largest gas power generation enterprise group and Shanxi's most dynamic coal machinery manufacturing group. It is also an important part of Jindong coal base among the 13 large-scale coal bases planned by China. It is the backbone enterprise of Jincheng mining area, one of the first batch of 19 coal mining areas planned by China
expansion materials:
business scope
foreign investment with its own funds; Coal wholesale operation; Engineering survey: control survey, topographic survey, line engineering survey, bridge survey, mine survey, tunnel survey and completion survey; Cadastral mapping; Transport of dangerous goods (1 category, 1 item), transport of dangerous goods (3 categories); Blasting operation
Bofu colliery,
Qingchi colliery,
Gougou colliery,
Yinjiagou colliery,
Xigou colliery,
Shangfu colliery,
Xiyao colliery,
, Tuncheng colliery,
zhulinshan colliery,
Huanglongshan colliery, Daqiao colliery, Yicheng colliery,
Huangcheng colliery,
Shangkong colliery,
, Shancheng colliery,
Jinyang colliery,
Baigou coal mine,
Yangquan coal mine,
Daning Coal Mine,
too many, let's write these
for adoption
The construction of small towns is 48 kilometers long. In particular, the 9.72 km Jiaxi coal transportation special line, with an investment of 8.36 million yuan, ranks first in the county in terms of project quality, standard, investment and scale. This year, the town has invested 2.3 million yuan in the construction of roads from Nanyi bridge to Dagou, 2.3 kilometers from Yangquan coal transportation line, etc., which will be open to traffic within this year. The roads of 27 administrative villages and 5 coal mines in the town will all become cement (oil) pavement
make great efforts to solve the problem of drinking water for human and livestock. The deep well water supply project of Yangling, Beiyi and Daxi villages with an investment of 2.3 million yuan will be fully started and completed in October, which will completely solve the draught difficulties of more than 3000 people. In recent years, the town has built one 3000 cubic meter reservoir, two electromechanical deep wells, laid 4500 meters of water-saving irrigation pipeline, and completed the water-saving supporting project of 1500 mu farmland in Qinchi village. So far, the town's irrigated area has reached 16750 mu
take the lead in the pilot project of Biogas Construction in the whole county. Huaishu village carried out biogas project construction in combination with toilet, circle and stove improvement. Among 81 households in the village, 25 households have used biogas, and 35 households are under construction. Biogas can be used by households within this year. Yuanzhuang and Daxi villages have invested 1.6 million yuan in the construction of straw vaporization station. The civil engineering, pipeline laying and meter installation have been completed, and the equipment installation is in progress. It will be completed and put into use in November
seek adoption