1. The main equipment of ore preparation stage includes crusher, screening equipment, grinding equipment and extension equipment. Auxiliary equipment: feeder, belt conveyor, st removal equipment, iron removal equipment, sand pump, etc
there are three main mineral processing processes: flotation, magnetic separation and gravity separation. In addition, there are electric separation, chemical separation and so on. According to the different mineral processing methods, the mineral processing equipment is not the same
flotation equipment mainly includes flotation machine and flotation column; Magnetic separation equipment is mainly magnetic separator; Gravity separation equipment is complex: chute, spiral chute, shaker, jig
auxiliary equipment mainly includes sand pump, mixing tank, dosing machine, etc
the proct treatment equipment is determined according to different procts and different requirements for procts, which can include thickener, filter, dryer, packaging equipment, etc., or it can be as simple as ordinary precipitation method
the tailings are stored in the tailings pond, which can be transported by pump without too much equipment
generally, safety and environmental protection should also be considered. The crushing stage should have st removal equipment, the grinding and flotation stage should have equipment and facilities to prevent leakage, and the safety of tailings pond in flood season should be considered
these are mainly determined by the size and configuration level of the concentrator, which can not be generalized.
2. It seems that you have also seen the relevant news, which is true. Recently, the last batch of equipment for the Africa 500t / D Gold Mine EPC project contracted by Yantai Jinpeng mining Machinery Co., Ltd. was successfully delivered
as a pioneer of general contracting project in mining instry, Yantai Jinpeng Mining Machinery Co., Ltd. provides general contracting services for domestic and foreign customers, including beneficiation experiment, mine design, equipment manufacturing, installation and commissioning, personnel training and management contracting. Jinpeng people always adhere to the tenet of technology, high efficiency, quality, safety and customer satisfaction, Try our best to complete every project successfully<

according to the ore properties and ore feasibility study report, Jinpeng beneficiation engineer has developed a cyanidation process for the project, which meets the requirements of the project:
process description
1 feed screening system
the raw ore is transported to the raw ore bin by truck, the raw ore bin is equipped with a lattice screen, and the large particles on the screen are broken manually by hydraulic hammer, Until it falls into the ore bin, a belt feeder is installed at the lower discharge port of the ore bin, the materials are fed into the circular vibrating screen for screening by 1 ᦇ belt conveyor, the procts on the screen are fed into the waste separation device, the wastes are sorted manually and transported to 4 ᦇ belt conveyor by 3 ᦇ belt conveyor, and the procts under the screen are fed into the steel structure powder ore bin by 2 ᦇ belt conveyor
2 grinding classification system
the ore in the fine ore bin is fed to the 4 ﹥ belt conveyor by the belt conveyor, and then fed to the energy-saving ball mill by the belt conveyor. The discharge of the ball mill is pumped into the cyclone group by the slurry pump for classification, the underflow of the cyclone returns to the ball mill for regrinding, and the overflow enters the concentration leaching system after impurity removal by the impurity removal screen
3 thickening leaching system
the pulp is concentrated by the high-efficiency reformed thickener, the overflow flows into the circulating water tank, the bottom flows through the rubber pump into the leaching tank, and the leaching agent is added at the same time. After the two leaching tanks are pre leached, the activated carbon is adsorbed. The activated carbon is added to the final leaching tank, and then graally runs to the front leaching tank according to the regulations. When the activated carbon runs to the third leaching tank, the activated carbon is added to the final leaching tank, When the gold content meets the requirements, the air lifter is used to lift the vibrating screen for carbon slurry separation, the slurry is returned to the leaching tank, and the gold loaded carbon is sent to the desorption electrolysis system
4 Analytical electrolysis system
the gold loaded carbon enters the desorption column after washing and impurity removal in the carbon storage tank, and the desorbed solution prepared by the desorbing solution tank is fed from the bottom of the desorption column by heating and pressurizing, and the gold cyanogen complex in the gold loaded carbon is desorbed, filtered by the filter and then sent to the electrolytic tank for electrolysis to obtain gold mud
5 dosing system
there are many dosing points in the carbon pulp plant. In order to ensure the continuous and accurate dosing, Jinpeng's own patented touch screen computer dosing machine is used to control the dosing at each point, and the reagent mixing and lime mixing are matched
6 dewatering system
the final tailings of the leaching tank are pumped to the full-automatic box filter press through the buffer tank, and the filtered water flows into the circulating pool for recycling. The filter cake is transported to the tailings yard by belt conveyor, and the tailings are transported to the tailings pond by truck.
3. Mr. Chen of Tianbao bought it for the purpose of land appreciation, not to help farmers and workers
the mechanical design talents of the old mining machinery (formerly Chengde conveyor Group Co., Ltd.) were in the No.1 level in Chengde City, but they could not be combined with the low-grade developers and mine owners.
4. Bookstore
5. Legal representative: Gaorun
date of establishment: July 17, 2009
registered capital: RMB 50 million
region: Xinjiang Uygur Autonomous Region
unified social credit Code: 91650100689583778a
business status: opening
instry: manufacturing
Company type: limited liability company (invested or controlled by natural person)
personnel size: 100-500 people < br/ >Address: 319 Helanshan street, Urumqi Economic and Technological Development Zone, Xinjiang business scope: manufacturing, maintenance and sales: mining belt conveyor, scraper conveyor, harrow winch, tramcar and accessories; Sales: oilfield additives, mining equipment, wires and cables, switchgear, photovoltaic support, power equipment, heating equipment, mineral procts, petroleum procts, coal, coke, chemical procts; Import and export of goods and technology; Mining investment, mining technology consulting services, mining equipment leasing, entrusted processing of mining equipment, photovoltaic support, conference and exhibition services, business information consulting services, professional technical consulting services, ticketing agents, property services, housing leasing, catering services.
6. Relatively scattered, what kind of conveyor? I am Luoyang vision do scraper machine, scraper machine relatively large factory has northwest Benniu, Zhangjiakou coal machine, Shandong mining machinery, these are large fully mechanized mining scraper machine manufacturers
7. Precautions for safety inspection of belt conveyor:
1. The fixed conveyor should be installed on the fixed foundation according to the specified installation method. The wheels of mobile conveyor should be wedged with triangle wood or braked with brake before formal operation. In order to avoid walking in the work, when there are multiple conveyors working in parallel, there should be a one meter channel between machines and between machines and walls
2. Before using the conveyor, check whether the running parts, belt buckles and bearing devices are normal, and whether the protective equipment is complete. The tightness of the tape must be adjusted to a proper level before starting.
3. The belt conveyor should start without load. After the operation is normal, the material can be fed. It is forbidden to feed before driving
4. When several conveyors run in series, they should start from the discharge end and start in sequence. Only after all of them are in normal operation can they be fed. 5. In case of belt deviation ring operation, stop the machine for adjustment and do not use it reluctantly to avoid edge wear and load increase. 6. The temperature of working environment and materials to be delivered shall not be higher than 50 ℃ and lower than - 10 ℃< No pedestrians or passengers are allowed on the conveyor belt
8. Stop feeding before stopping, and stop until all materials on the belt are discharged< The conveyor motor must be well insulated. Do not pull and drag the cable of mobile conveyor. The motor should be grounded reliably. 10. It is forbidden to pull the belt by hand when the belt is slipping, so as to avoid accidents.
8.

Baisheng machinery is a professional manufacturer specializing in the proction, sales, research and development of feeder, conveyor, vibrating screen, hoist and other equipment. It has strong technical force, domestic advanced processing equipment such as stamping, riveting and welding and accurate testing equipment

Baisheng machinery - proction of reciprocating feeder, vibrating feeder, impeller feeder, disc feeder, vibrating ore drawing machine, plate feeder and other feeder equipment, screw conveyor, chain conveyor, belt conveyor, scale conveyor, scraper conveyor and other conveyor equipment, vibrating screen, rotary vibrating screen, linear vibrating screen, circular vibrating screen Drum screen and other vibrating screen equipment, bucket elevator, belt bucket elevator, plate chain bucket elevator, dehydration bucket elevator and other elevator equipment to meet the needs of all over the world, won the praise of customers

The manual can be downloaded directly from the website


Hot content
Inn digger Publish: 2021-05-29 20:04:36 Views: 341
Purchase of virtual currency in trust contract dispute Publish: 2021-05-29 20:04:33 Views: 942
Blockchain trust machine Publish: 2021-05-29 20:04:26 Views: 720
Brief introduction of ant mine Publish: 2021-05-29 20:04:25 Views: 848
Will digital currency open in November Publish: 2021-05-29 19:56:16 Views: 861
Global digital currency asset exchange Publish: 2021-05-29 19:54:29 Views: 603
Mining chip machine S11 Publish: 2021-05-29 19:54:26 Views: 945
Ethereum algorithm Sha3 Publish: 2021-05-29 19:52:40 Views: 643
Talking about blockchain is not reliable Publish: 2021-05-29 19:52:26 Views: 754
Mining machine node query Publish: 2021-05-29 19:36:37 Views: 750