Shandong mining machinery coal safety sign
Publish: 2021-04-17 04:15:57
1. 1. Coal mine proct safety mark certificate and mark MA (hereinafter referred to as coal mine safety mark)
before formal proction, the company's procts must apply to the mine proct safety mark office of the State Administration of work safety (State Administration of coal mine safety) according to the legal proceres and requirements, The office of safety signs for mining procts concts technical review, on-site review and proct sampling inspection on the company's application materials, and issues "certificate of safety signs for mining procts of coal mine" after all kinds of work are approved. The contents of the certificate include:
safety sign number - unique code of the certified proct of safety signs
proction unit, proction address, proct name, specification and model The scope of application and period of validity are
2. The company's procts must obtain the explosion-proof certificate before applying for the safety mark certificate of coal mine procts
application procere for explosion proof certificate:
a. the complete set of drawings, proct standards or technical conditions of the proct shall be submitted to the inspection unit designated by the state for examination
B. complete prototypes and samples manufactured according to the approved drawings, together with technical documents such as proct instructions, shall be sent to the inspection unit designated by the state
the inspection unit designated by the State shall inspect and carry out various tests on the samples submitted for inspection according to the explosion-proof regulations, and confirm that the data are complete, the tests are complete, and the current relevant standards are met. If the explosion-proof regulations are met, the "explosion-proof certificate" can be issued
the explosion-proof certificate number is the only code of this type of proct< br />
before formal proction, the company's procts must apply to the mine proct safety mark office of the State Administration of work safety (State Administration of coal mine safety) according to the legal proceres and requirements, The office of safety signs for mining procts concts technical review, on-site review and proct sampling inspection on the company's application materials, and issues "certificate of safety signs for mining procts of coal mine" after all kinds of work are approved. The contents of the certificate include:
safety sign number - unique code of the certified proct of safety signs
proction unit, proction address, proct name, specification and model The scope of application and period of validity are
2. The company's procts must obtain the explosion-proof certificate before applying for the safety mark certificate of coal mine procts
application procere for explosion proof certificate:
a. the complete set of drawings, proct standards or technical conditions of the proct shall be submitted to the inspection unit designated by the state for examination
B. complete prototypes and samples manufactured according to the approved drawings, together with technical documents such as proct instructions, shall be sent to the inspection unit designated by the state
the inspection unit designated by the State shall inspect and carry out various tests on the samples submitted for inspection according to the explosion-proof regulations, and confirm that the data are complete, the tests are complete, and the current relevant standards are met. If the explosion-proof regulations are met, the "explosion-proof certificate" can be issued
the explosion-proof certificate number is the only code of this type of proct< br />
2.
Article 9 of the management rules for the issuance and identification of safety sign certificates of mining procts clearly states that the safety sign number is composed of 9-digit codes, and the following coding rules shall be implemented:
proct use environment: coal mine procts are represented by m, and metal and non-metal mine procts are represented by K
Proct Category: the proct category included in the Management Catalogue of safety signs, expressed in two capital English letters
certification year: the year when the proct first obtained the safety mark
Panlong furnace finishing and ing, welcome to ask
3. What you are talking about is one thing. Generally, if a mining proct needs to go down the well or be sold, it needs "three certificates"
1, safety sign certificate
2, explosion proof certificate
3, and inspection certificate
when applying, it needs to apply in the general Coal Research Institute (Beijing), and after acceptance, it will be assigned to an inspection institution (Shenyang, Shanghai, Chongqing), and then you send the proct for inspection, After passing, the inspection institution will issue explosion-proof certificate and inspection certificate to your procts, and issue safety sign certificate to you in the general Coal Research Institute.
1, safety sign certificate
2, explosion proof certificate
3, and inspection certificate
when applying, it needs to apply in the general Coal Research Institute (Beijing), and after acceptance, it will be assigned to an inspection institution (Shenyang, Shanghai, Chongqing), and then you send the proct for inspection, After passing, the inspection institution will issue explosion-proof certificate and inspection certificate to your procts, and issue safety sign certificate to you in the general Coal Research Institute.
4. The proct certificate of steel wire rope for important use in coal mine has coal safety mark, quality inspection certificate, and anti-counterfeiting code or anti-counterfeiting strip
5. (1) application and acceptance
1. Enterprises procing procts listed in the catalogue shall apply to the Provincial Bureau of quality and technical supervision where they are located, and submit the following application materials:
1) application for national instrial proct proction license in triplicate< 2) three copies of business license
3) three copies of the proction license certificate (enterprises that reapply after the expiration of the proction license period)
4) other materials required in the proct implementation rules< After receiving the application from the enterprise, the Provincial Bureau of quality and technical supervision shall accept the application materials that meet the requirements of the implementation rules, and send the decision on acceptance of administrative license application to the enterprise within 5 days from the date of receiving the application
if the application materials do not meet the requirements of the implementation rules and can meet the requirements through supplement and correction, the enterprise shall send the notification of supplement and correction of administrative license application materials to the enterprise on the spot or within 5 days. If the application is not informed within the time limit, it shall be accepted as of the date of receiving the application materials
if the application materials do not meet the requirements of the administrative license law and the regulations on the administration of proction license for instrial procts, a decision of not accepting the application shall be made and a decision of not accepting the application for administrative license shall be issued< The provincial license office shall submit all the application materials to the examination department within 5 days from the date of accepting the enterprise application if the examination department is responsible for organizing the examination according to the implementation rules< (2) enterprise on-site verification
1. According to the requirements of the proct implementation rules, the provincial quality and Technical Supervision Bureau or review department shall organize the review
2. The provincial license office or the review department shall formulate the on-site verification plan of the enterprise and notify the enterprise 5 days in advance. If the review department organizes the review, the review department shall also the verification plan to the local provincial license office
3. The provincial license office or the examination department shall assign 2-4 examiners to form an examination team to carry out on-site inspection on the enterprise, and the enterprise shall cooperate
4. According to the requirements of the proct implementation rules, the review team concts on-site verification on the enterprise, and the verification time is generally 1-3 days. The review team shall be responsible for the results of the on-site verification of the enterprise and implement the team leader responsibility system
5. If the Provincial Bureau of quality and technical supervision is responsible for organizing the review, the provincial license office shall complete the on-site verification and sample sealing of the enterprise within 30 days from the date of accepting the enterprise's application, and inform the inspected enterprise of the on-site verification conclusion in written form
if the review is organized by the review department, the review department shall, within 30 days from the date of accepting the enterprise's application, complete the on-site verification and sample sealing of the enterprise, and inform the inspected enterprise of the on-site verification conclusion in written form, and inform the provincial license office at the same time< If the enterprise fails to pass the on-site inspection, it shall be judged as unqualified in the examination. The provincial license office or the examination department shall report to the General Administration of quality supervision, inspection and quarantine in writing, and the General Administration of quality supervision, inspection and quarantine shall issue the decision on not granting administrative license to the enterprise< (3) proct sampling and inspection
1. If the enterprise passes the on-site inspection, the inspection team shall seal up the samples in accordance with the requirements of the implementation rules, and inform the enterprise of the list and contact information of all inspection institutions responsible for the inspection of the proct's proction license, which shall be selected by the enterprise
2. If the sample needs to be sent for inspection after field verification, the enterprise shall be informed to deliver the sample to the inspection institution within 7 days from the date of sealing up the sample. If on-site inspection is required, the inspectors shall notify the inspection institution of their own choice to conct on-site inspection
3. The inspection institution shall complete the inspection work within the time specified in the proct implementation rules and issue the inspection report< 4. If the proct of an enterprise fails to pass the inspection, it shall be judged as unqualified in the examination. The examination department shall report to the AQSIQ in writing, and the AQSIQ shall issue the "decision on not granting administrative license" to the enterprise< (4) examination, approval and license issuing
1. If the provincial license office is responsible for organizing the examination, the provincial license office shall collect and examine the enterprise's application, business license, verification record, verification report and proct inspection report according to relevant regulations, and submit the application materials to the examination department within 30 days from the date of accepting the enterprise's application
if the review is organized by the review department, the review department shall summarize and review the application, business license, verification record, verification report and proct inspection report of the enterprise in accordance with relevant regulations< The examination department shall submit the application materials to the national license examination center within 40 days from the date of accepting the enterprise application
3. The national license examination center shall complete the examination of the submitted materials within 50 days from the date of accepting the enterprise application, and report to the national license office< 4. AQSIQ shall decide whether to grant the license or not within 60 days from the date of accepting the application. If the license conditions are met, AQSIQ shall issue a proction license within 10 days from the date of making the license decision; If the license issuing conditions are not met, the decision letter of no administrative license shall be issued to the enterprise within 10 days from the date of making the decision
5. The national license office will publish the list of licensed enterprises to the public through the Internet, newspapers and other means< (5) proction license of the group company
1. If the group company and its subsidiaries, branches or proction bases (hereinafter referred to as affiliated units) have the legal personality, they can apply for proction license separately; Those who do not have the status of a legal person shall not apply for a proction license in the name of the unit to which they belong
2. All affiliated units can apply for proction license independently or jointly with the group company, regardless of whether they have the legal person status
3. When applying for the proction license together with the group company, the affiliated units should apply to the Provincial Bureau of quality and technical supervision where the group company is located. Where the provincial license office organizes the on-the-spot inspection of the enterprise according to the regulations, the provincial license office of the place where the group company is located may directly send an inspection team, or entrust the provincial license office of the place where the branch company is located to organize the inspection in writing. The provincial license office where the group company is located is responsible for summarizing and reporting relevant materials according to the above proceres
4. Other economic consortia and affiliated units applying for proction license shall refer to the license application proceres of the group company< (6) the filing proceres for entrusted processing
1. The entrusted enterprise applying for filing shall meet the following conditions:
(1) it shall obtain a valid business license issued by the administrative department for Instry and commerce, and its business scope shall cover the procts applying for entrusted processing filing
(2) if the application for the record of entrusted processing involves instrial policies, it should meet the relevant requirements of instrial policies
(3) a valid contract for entrusted processing has been signed and notarized, and the contract must specify that the entrusted enterprise is responsible for all proct sales< (1) obtain a valid business license issued by the administrative department for Instry and commerce, and the business scope shall cover the procts applied for the record of entrusted processing< (2) proction license has been obtained
(3) a valid contract for entrusted processing has been signed and notarized, and the contract must specify that the entrusted enterprise is responsible for all proct sales
3. The entrusting enterprise and the entrusted enterprise shall submit the filing application to the local provincial license office respectively, and submit the following filing application materials respectively:
(1) application for the filing of national instrial proct proction license entrusted processing in plicate< (2) copies of the business license of the entrusted enterprise and the entrusted enterprise< (3) a of the proction license of the entrusted enterprise< (4) notarized copies of the contract
4. The provincial license office shall carry out necessary verification within 5 days from the date of receiving the entrusted processing filing application, and record the qualified enterprises. Those who do not meet the requirements shall not be put on record and the reasons shall be explained.
1. Enterprises procing procts listed in the catalogue shall apply to the Provincial Bureau of quality and technical supervision where they are located, and submit the following application materials:
1) application for national instrial proct proction license in triplicate< 2) three copies of business license
3) three copies of the proction license certificate (enterprises that reapply after the expiration of the proction license period)
4) other materials required in the proct implementation rules< After receiving the application from the enterprise, the Provincial Bureau of quality and technical supervision shall accept the application materials that meet the requirements of the implementation rules, and send the decision on acceptance of administrative license application to the enterprise within 5 days from the date of receiving the application
if the application materials do not meet the requirements of the implementation rules and can meet the requirements through supplement and correction, the enterprise shall send the notification of supplement and correction of administrative license application materials to the enterprise on the spot or within 5 days. If the application is not informed within the time limit, it shall be accepted as of the date of receiving the application materials
if the application materials do not meet the requirements of the administrative license law and the regulations on the administration of proction license for instrial procts, a decision of not accepting the application shall be made and a decision of not accepting the application for administrative license shall be issued< The provincial license office shall submit all the application materials to the examination department within 5 days from the date of accepting the enterprise application if the examination department is responsible for organizing the examination according to the implementation rules< (2) enterprise on-site verification
1. According to the requirements of the proct implementation rules, the provincial quality and Technical Supervision Bureau or review department shall organize the review
2. The provincial license office or the review department shall formulate the on-site verification plan of the enterprise and notify the enterprise 5 days in advance. If the review department organizes the review, the review department shall also the verification plan to the local provincial license office
3. The provincial license office or the examination department shall assign 2-4 examiners to form an examination team to carry out on-site inspection on the enterprise, and the enterprise shall cooperate
4. According to the requirements of the proct implementation rules, the review team concts on-site verification on the enterprise, and the verification time is generally 1-3 days. The review team shall be responsible for the results of the on-site verification of the enterprise and implement the team leader responsibility system
5. If the Provincial Bureau of quality and technical supervision is responsible for organizing the review, the provincial license office shall complete the on-site verification and sample sealing of the enterprise within 30 days from the date of accepting the enterprise's application, and inform the inspected enterprise of the on-site verification conclusion in written form
if the review is organized by the review department, the review department shall, within 30 days from the date of accepting the enterprise's application, complete the on-site verification and sample sealing of the enterprise, and inform the inspected enterprise of the on-site verification conclusion in written form, and inform the provincial license office at the same time< If the enterprise fails to pass the on-site inspection, it shall be judged as unqualified in the examination. The provincial license office or the examination department shall report to the General Administration of quality supervision, inspection and quarantine in writing, and the General Administration of quality supervision, inspection and quarantine shall issue the decision on not granting administrative license to the enterprise< (3) proct sampling and inspection
1. If the enterprise passes the on-site inspection, the inspection team shall seal up the samples in accordance with the requirements of the implementation rules, and inform the enterprise of the list and contact information of all inspection institutions responsible for the inspection of the proct's proction license, which shall be selected by the enterprise
2. If the sample needs to be sent for inspection after field verification, the enterprise shall be informed to deliver the sample to the inspection institution within 7 days from the date of sealing up the sample. If on-site inspection is required, the inspectors shall notify the inspection institution of their own choice to conct on-site inspection
3. The inspection institution shall complete the inspection work within the time specified in the proct implementation rules and issue the inspection report< 4. If the proct of an enterprise fails to pass the inspection, it shall be judged as unqualified in the examination. The examination department shall report to the AQSIQ in writing, and the AQSIQ shall issue the "decision on not granting administrative license" to the enterprise< (4) examination, approval and license issuing
1. If the provincial license office is responsible for organizing the examination, the provincial license office shall collect and examine the enterprise's application, business license, verification record, verification report and proct inspection report according to relevant regulations, and submit the application materials to the examination department within 30 days from the date of accepting the enterprise's application
if the review is organized by the review department, the review department shall summarize and review the application, business license, verification record, verification report and proct inspection report of the enterprise in accordance with relevant regulations< The examination department shall submit the application materials to the national license examination center within 40 days from the date of accepting the enterprise application
3. The national license examination center shall complete the examination of the submitted materials within 50 days from the date of accepting the enterprise application, and report to the national license office< 4. AQSIQ shall decide whether to grant the license or not within 60 days from the date of accepting the application. If the license conditions are met, AQSIQ shall issue a proction license within 10 days from the date of making the license decision; If the license issuing conditions are not met, the decision letter of no administrative license shall be issued to the enterprise within 10 days from the date of making the decision
5. The national license office will publish the list of licensed enterprises to the public through the Internet, newspapers and other means< (5) proction license of the group company
1. If the group company and its subsidiaries, branches or proction bases (hereinafter referred to as affiliated units) have the legal personality, they can apply for proction license separately; Those who do not have the status of a legal person shall not apply for a proction license in the name of the unit to which they belong
2. All affiliated units can apply for proction license independently or jointly with the group company, regardless of whether they have the legal person status
3. When applying for the proction license together with the group company, the affiliated units should apply to the Provincial Bureau of quality and technical supervision where the group company is located. Where the provincial license office organizes the on-the-spot inspection of the enterprise according to the regulations, the provincial license office of the place where the group company is located may directly send an inspection team, or entrust the provincial license office of the place where the branch company is located to organize the inspection in writing. The provincial license office where the group company is located is responsible for summarizing and reporting relevant materials according to the above proceres
4. Other economic consortia and affiliated units applying for proction license shall refer to the license application proceres of the group company< (6) the filing proceres for entrusted processing
1. The entrusted enterprise applying for filing shall meet the following conditions:
(1) it shall obtain a valid business license issued by the administrative department for Instry and commerce, and its business scope shall cover the procts applying for entrusted processing filing
(2) if the application for the record of entrusted processing involves instrial policies, it should meet the relevant requirements of instrial policies
(3) a valid contract for entrusted processing has been signed and notarized, and the contract must specify that the entrusted enterprise is responsible for all proct sales< (1) obtain a valid business license issued by the administrative department for Instry and commerce, and the business scope shall cover the procts applied for the record of entrusted processing< (2) proction license has been obtained
(3) a valid contract for entrusted processing has been signed and notarized, and the contract must specify that the entrusted enterprise is responsible for all proct sales
3. The entrusting enterprise and the entrusted enterprise shall submit the filing application to the local provincial license office respectively, and submit the following filing application materials respectively:
(1) application for the filing of national instrial proct proction license entrusted processing in plicate< (2) copies of the business license of the entrusted enterprise and the entrusted enterprise< (3) a of the proction license of the entrusted enterprise< (4) notarized copies of the contract
4. The provincial license office shall carry out necessary verification within 5 days from the date of receiving the entrusted processing filing application, and record the qualified enterprises. Those who do not meet the requirements shall not be put on record and the reasons shall be explained.
6. Coal safety certification is the abbreviation of coal mine safety certification. In 2007, the State Economic and Trade Commission and the Coal Mine Safety Supervision Bureau issued the "Interim Measures for safety signs of coal mine procts" and other documents, which implemented the safety proction certification system for equipment, instruments, meters and other facilities used in underground coal mines, effectively curbing the entry of fake and inferior procts into the underground. Safety proction mark system is an effective way. In order to improve the safety level of coal mine, people pay more and more attention to the development of safety technology. The state has reformed the method of funding technology development. Due to the lack of safety investment, the state should establish a fund guarantee mechanism for the research and development of safety proction
safety proction certification system shall be implemented for equipment, instruments and meters used in underground coal mines
safety proction certification system shall be implemented for equipment, instruments and meters used in underground coal mines
7. Log in to "safety standard office"; Click "safety label query"; Continue to click on "coal mine safety standard query"; Then enter "enterprise name" or "safety label number" to query. Are you satisfied?
8. According to the regulations of the National Center for safety signs of mining procts, the period of validity of the safety signs of the procts obtained must be extended. If the proct certificate with safety mark is not renewed, it will be invalid automatically. Therefore, the equipment with expired coal safety signs of mining procts cannot be used.
9. In the process of certification, we often hear the words of mine safety certification and coal safety certification. Sometimes we feel that they are not the same thing, but what we see on the Internet is that they are both the same thing. Why< In fact, both coal safety certification and mine safety certification are abbreviations of coal mine safety certification, which can be written as Ma and Ka certification. This is a national compulsory certification for mineral operations. Only with these certificates can we sell, purchase and use mine procts with safety marks
there is no difference between the two. We can regard them as one thing.
there is no difference between the two. We can regard them as one thing.
10. Please go to the "safety standard national mine proct safety mark center" online check to understand, is a proct safety mark number.
Hot content