Inclined shaft scraper
Publish: 2021-04-22 11:48:54
1. Introction: Xiangyang Zhongliang Construction Machinery Co., Ltd. (Zhongliang slag raking machine) is an enterprise dedicated to research and development, proction, sales, service and training of mining equipment (slag raking machine, slag raking machine). The company is located in Xiangyang, a famous historical and cultural city with beautiful scenery and pleasant environment
legal representative: Wang Hualiang
time of establishment: November 25, 2005
registered capital: RMB 10 million
Instrial and commercial registration number: 420621000007995
enterprise type: limited liability company (invested or controlled by natural person)
address: No.45 diamond Avenue, Xiangzhou District, Xiangyang City
legal representative: Wang Hualiang
time of establishment: November 25, 2005
registered capital: RMB 10 million
Instrial and commercial registration number: 420621000007995
enterprise type: limited liability company (invested or controlled by natural person)
address: No.45 diamond Avenue, Xiangzhou District, Xiangyang City
2. Why do you say that? Because it works continuously for more than 20 hours a day, the incorrect operation mode has a great impact on the loss of slag raking machine parts. Just like a person, if he works with overload for a long time, all parts of his body will feel tired. The same is true for the micro slag raking machine. When the wear of parts exceeds the normal proportion, the machine will have more faults and shorter service life< Daily inspection of Yimei crawler slag scraper
1. Disassemble the pipe joints, check the internal rust, and replace the oil seal belt
2. Check the fixing screws of hydraulic cylinder and hydraulic motor for looseness and oil leakage
3. The looseness, deterioration and scar of high-pressure oil pipe should be listed as the focus of regular inspection, and it should be replaced immediately in case of any defect
4. Check the pressure switch, relay, limit switch and other electrical system parts for normal operation
5. Check the support part of the whole system piping ymjt01 for looseness and vibration
6. Touch the joint by hand to check whether there is oil leakage, and check whether there is oil leakage in the piping.
1. Disassemble the pipe joints, check the internal rust, and replace the oil seal belt
2. Check the fixing screws of hydraulic cylinder and hydraulic motor for looseness and oil leakage
3. The looseness, deterioration and scar of high-pressure oil pipe should be listed as the focus of regular inspection, and it should be replaced immediately in case of any defect
4. Check the pressure switch, relay, limit switch and other electrical system parts for normal operation
5. Check the support part of the whole system piping ymjt01 for looseness and vibration
6. Touch the joint by hand to check whether there is oil leakage, and check whether there is oil leakage in the piping.
3. Each has its own merits
loader is a kind of earthwork construction machinery which is widely used in highway, railway, construction, hydropower, port, mine and other construction projects. It is mainly used for shoveling soil, sand, lime, coal and other bulk materials, and can also be used for light shoveling of ore and hard soil
excavator, also known as excavating machine, is a kind of earth moving machine which uses bucket to excavate materials higher or lower than the bearing surface and load them into transport vehicles or unload them to the stockyard< The machine is mainly used for tunnel excavation, mining engineering, water conservancy engineering construction machinery and small section diversion tunnel, mine slag (ore) machinery. The machine is mainly used for gravel soil material collection, transportation and loading construction in some non explosive dangerous mines with narrow proction liquid space and small proction scale, such as phosphate rock, metal and non-metal ore. Features of slag raking machine: it is a proction device that combines the manipulator and conveyor, integrates the collection and conveying functions, and adopts the electro-hydraulic control system. It has the characteristics of safety, environmental protection, low energy consumption and high efficiency. It is an indispensable advanced mining equipment for mines and small tunnels. It is an alternative proct for human and other machinery. The advantages of slag raking machine: it has five functions: hydraulic walking, excavation, collection, transportation, loading and bottom cleaning. Among them, the hydraulic walking function is to drive the wheels through the hydraulic motor, recer, transmission shaft, and then to the recer. The hydraulic motor has three functions: forward, backward and automatic braking; The digging and collecting function is completed by the manipulator. The manipulator has the functions of digging, extending arm, loading and unloading. The boom can rise, fall and rotate left and right. The operation of digging and collecting is controlled by full hydraulic pressure. It is operated by six handles, and each handle controls two actions, a total of 12 actions. This technology is improved by the operation process of large excavator, which is easy to operate and transport, The loading function is completed by the conveyor system. The lifting of the conveyor frame is controlled by the hydraulic cylinder. When the conveyor frame descends, the front wheel can be supported. At the same time, the front material receiving port of the conveyor frame is more close to the ore contact surface, so the stability is stronger. At the same time, the bulk material can be joined, and the conveyor belt width is 650-700mm, and the transmission speed is 800-900mm / s, Another 2.2kW motor drives the recer to drive the driving roller, which makes the transmission performance more stable, the service life longer and the maintenance more convenient. Most of the slag raking machines used in tunnel construction are German made itc312, with a theoretical slag loading capacity of 312 cubic meters per hour. It is the model with the largest number of tunnel equipment enterprises in China, and also the model with the highest slag loading efficiency and the most stable performance. It has a high evaluation with the same specification of only Nissan model. In 2009, China's Ministry of Railways designated the localization of large-scale slag raking machine (tunnel digging and loading machine) as a science and technology project, which was researched and developed by Shijiazhuang Railway Institute and finally proced by the 6411 factory of the Chinese people's Liberation Army. WZ330 is similar to itc312 in appearance, and its hydraulic, power, motor and other components are still imported international famous brands, so it can achieve the slag loading capacity and stability of itc312. The electro-hydraulic proportional control and regulated power supply are improved to make it more suitable for large and long tunnel construction, but like most domestic high imitation procts, it is imported from domestic shell, The soup didn't change the dressing. Slag raking machine has changed the original construction of semi mechanized, intermittent slag transportation and requires a lot of manual cooperation of low speed, high safety risk and high cost. The slag raking machine integrates raking, digging, raking, loading, transporting and unloading. It has six functions of walking, digging, collecting, transporting, loading and cleaning the site. It has continuous and efficient proction. It is the current narrow site construction to ensure high yield, high efficiency, low safety risk and low cost; Enhance market competitiveness; Improve the proction progress and occupy the market quickly; It can be seen that the project can be completed ahead of schele. There are 80 cubic meters, 100 cubic meters, 120 cubic meters, 150 cubic meters, 180 cubic meters, 200 cubic meters, 220 cubic meters, 260 cubic meters, 312 cubic meters, 330 cubic meters and other ordinary and large slope types of earth materials transported by slag raking machine per hour; Design of gear pump and high pressure pump; Electric and oil electric al-use; Explosion proof type; Tire type, track type, crawler type. Liu Jiang, please choose the machinery according to the details of your own construction section, so as to achieve the best, most reasonable and most economical construction scheme. Slag raking machine is a new scientific and technological proct of underground excavation, excavation, transportation mechanical equipment instead of manual and intermittent machinery, which is the guarantee of safe and rapid underground engineering construction. It belongs to engineering machinery, tunnel mining equipment, underground excavation equipment, tunnel engineering equipment, railway tunnel engineering equipment, highway tunnel engineering equipment, power station diversion tunnel engineering equipment, mining equipment, mining roadway excavation equipment, water conservancy diversion tunnel excavation equipment, culvert excavation equipment, coal mine roadway excavation equipment, metal mine excavation equipment, iron mine excavation equipment Phosphate loading and unloading equipment, manganese mining and loading equipment, roadway engineering loading and unloading equipment, excavation equipment, conveying equipment, loading and unloading equipment, construction equipment, mining equipment, shoveling and transporting equipment, shoveling and transporting machinery, fully mechanized mining equipment, earthwork machinery, stonework machinery, concrete machinery, tunnel and underground equipment, road construction machinery, transfer equipment, tunnel machinery, material loading and unloading machinery, coal mine explosion-proof equipment. Wide range of uses, the most suitable for narrow space narrow site operation. Suitable section space of slag scraper [bucket loader]: provided by Liu Jiang of Jiangxi Da underground Technology Co., Ltd. The suitable cross section of the tyre scraper is 1.6 * 1.6m; 1.8 * 1.8m; 2 * 2m section. The suitable section of rail loader is 80 type 1.8 * 1.8m; 100 type 2.5 * 2.5m; 120 type 2.4 * 2.5m; 150 type, 2.5 * 2.8m; 160 Type 3.2 * 3.2m section. The selection of this model is mainly based on the mechanical equipment used to transport ore [such as rail transport, bucket car transport, shuttle car transport, etc.]. Suitable cross section of crawler excavator loader: 80 type 2 * 2.2m; 100 type 2.6 * 2.6m; 100 type 2.2 * 2.4; 120 type 2.3 * 2.6m; 120 type 2.8 * 2.8; 150 type, 2.5 * 2.9m; 150 type 3.5 * 3.5m; 180 type, 2.8 * 3.3m; 180 type, 3 * 4m; 180 type, 4 * 4m; 200 type 4 * 4m; 220 type 4.5 * 4.5m; 260 type 5 * 5m; 312 type, 5 * 5m; 330 type 5 * 5m section. Jiangxi Da underground Technology Co., Ltd. Suitable section for inclined shaft with large slope: 80 crawler type 2.4 * 2.5m section, with maximum working slope of 30 degrees; The maximum working gradient of 100 crawler type 2.6 * 2.6m section is 25 degrees; 120 crawler type 2.4 * 2.4m, maximum working gradient 28 degrees; 150 crawler type 3.5 * 3.5m, maximum working gradient 28 degrees; The maximum working gradient of 4 * 4m section of 180 crawler type is 32 degrees; 120 crawler type 2.8 * 2.8m, maximum working gradient 32 degrees; The maximum working gradient of 312 crawler type 5 * 5m section is 30 degrees. Tunnel section, tunnel section, roadway section, shaft section, inclined shaft section, drift section, diversion tunnel section, diversion tunnel section, culvert section, mine tunnel section, underground construction section, geotechnical engineering section, mining engineering section, excavation section, large section, small section excavation, transportation, traction, transportation equipment and accessories. Integrating proct engineering information, adjusting proct price is professional, professional and long-term purchasing can represent group buying, and group buying can get preferential treatment. Comprehensive display of proct information to help you understand and make decisions quickly, so that you can purchase voluntarily. The main equipment commonly used in the construction of large section or full section are as follows: Rail Transportation: gantry drilling jumbo, bolt support, vertical claw or rake bucket rail loader [slag loader], 10 ~ 30 cubic shuttle mine car or mining jumbo, 12 ton or 25t traction motor car, concrete spraying machine or delivery pump, and steel formwork jumbo. Trackless transportation: 3-arm or 4-arm tire and crawler electric hydraulic rock drilling jumbo, shotcrete anchor support, anchor jumbo, bucket crawler rock loader, 20 ~ 25 ton mining truck or pit truck [small secondary wheel, small Dongfeng], concrete jet or delivery pump, integral steel formwork jumbo. The advantages of trackless transportation are high proction efficiency, good mobility, overcoming the practical advantages of large slope work, small turning radius, strong working force, fast speed, not limited by conditions and so on. Although the initial investment is high, but the construction cost is low and fast, and the engineering quality is good, and the safety and environmental protection are constantly improving, which is now the commonly used construction method of underground construction. Main application of slag raking machine: it is suitable for tunnel excavation, transportation, mining engineering, water conservancy engineering construction machinery, medium and small section diversion tunnel, mine slag (ore) machinery. It is mainly used for the collection, transportation and loading of rock and soil materials in tunnels and mines with narrow proction space, such as coal mine, phosphate mine, iron mine, metal and non-metal mine. Features of slag raking machine: it is a proction device that combines the manipulator and conveyor, integrates the collection and conveying functions, and adopts the electro-hydraulic control system. It has the characteristics of safety and environmental protection, low energy consumption and high efficiency. It is a necessary advanced tunneling mining equipment for mine and Suidong, and a substitute for manual and other machinery. The machine shovels rock by crawler and scrapes the rock into its own scraper conveyor through bucket. The conveyor mps the rock into mp truck, shuttle car or other transfer equipment from the tail. At the same time, the backhoe digging arm can be used to pick up the distant rock, and the bucket can also be used to clean the working face. The machine adopts electric hydraulic transmission, with compact structure, large propulsion force and wide range of picking. It can load rock in full section without dead angle and manual cleaning; The main action of the machine is controlled by the pilot valve, which is easy to operate, stable and shock free, reliable in performance and convenient in maintenance; This machine has excellent humanized design. The hydraulic system is air-cooled. There are seats and driving shed. There are alarm systems for over limit travel, over high oil temperature, oil blockage and motor overload, which greatly rece the labor intensity of workers. It is safe, easy and comfortable for the driver to operate the machine. Advantages of slag raking machine: the machine includes six functions: hydraulic walking, excavation, collection, transportation, loading and site cleaning. Among them, the hydraulic walking function is to drive the wheels through the hydraulic motor, recer, transmission shaft, and then to the recer. The hydraulic motor has three functions: forward, backward and automatic braking[ 1] The digging and collecting function is completed by the manipulator. The manipulator has the functions of digging, extending arm, loading and unloading. The boom can rise, fall and rotate left and right. The operation of digging and collecting is controlled by full hydraulic pressure. It is operated by six handles, and each handle controls two actions, a total of 12 actions. This technology is improved by the operation process of large excavator, which is easy to use, The function of conveying and loading is completed by the conveyor system. The lifting of the conveyor frame is controlled by the hydraulic cylinder. When the conveyor frame descends, the front wheel can be supported. At the same time, the front material receiving port of the conveyor frame is more close to the ore contact surface, so the stability is stronger. At the same time, the bulk material can be joined. In a smooth way, the width of the conveyor belt is 650-700mm, and the transmission speed is 800-900mm / s, Another 2.2kW motor drives the recer to drive the driving roller, which makes the transmission performance more stable, the service life longer and the maintenance more convenient
rolling machine is a shaping machine for continuous point bending of sheet metal, with different shapes such as O-shape, U-shape, multi-stage R, etc< Rock loading machine a machine that loads ore or rock in a horizontal or gently inclined tunnel. According to work
loader is a kind of earthwork construction machinery which is widely used in highway, railway, construction, hydropower, port, mine and other construction projects. It is mainly used for shoveling soil, sand, lime, coal and other bulk materials, and can also be used for light shoveling of ore and hard soil
excavator, also known as excavating machine, is a kind of earth moving machine which uses bucket to excavate materials higher or lower than the bearing surface and load them into transport vehicles or unload them to the stockyard< The machine is mainly used for tunnel excavation, mining engineering, water conservancy engineering construction machinery and small section diversion tunnel, mine slag (ore) machinery. The machine is mainly used for gravel soil material collection, transportation and loading construction in some non explosive dangerous mines with narrow proction liquid space and small proction scale, such as phosphate rock, metal and non-metal ore. Features of slag raking machine: it is a proction device that combines the manipulator and conveyor, integrates the collection and conveying functions, and adopts the electro-hydraulic control system. It has the characteristics of safety, environmental protection, low energy consumption and high efficiency. It is an indispensable advanced mining equipment for mines and small tunnels. It is an alternative proct for human and other machinery. The advantages of slag raking machine: it has five functions: hydraulic walking, excavation, collection, transportation, loading and bottom cleaning. Among them, the hydraulic walking function is to drive the wheels through the hydraulic motor, recer, transmission shaft, and then to the recer. The hydraulic motor has three functions: forward, backward and automatic braking; The digging and collecting function is completed by the manipulator. The manipulator has the functions of digging, extending arm, loading and unloading. The boom can rise, fall and rotate left and right. The operation of digging and collecting is controlled by full hydraulic pressure. It is operated by six handles, and each handle controls two actions, a total of 12 actions. This technology is improved by the operation process of large excavator, which is easy to operate and transport, The loading function is completed by the conveyor system. The lifting of the conveyor frame is controlled by the hydraulic cylinder. When the conveyor frame descends, the front wheel can be supported. At the same time, the front material receiving port of the conveyor frame is more close to the ore contact surface, so the stability is stronger. At the same time, the bulk material can be joined, and the conveyor belt width is 650-700mm, and the transmission speed is 800-900mm / s, Another 2.2kW motor drives the recer to drive the driving roller, which makes the transmission performance more stable, the service life longer and the maintenance more convenient. Most of the slag raking machines used in tunnel construction are German made itc312, with a theoretical slag loading capacity of 312 cubic meters per hour. It is the model with the largest number of tunnel equipment enterprises in China, and also the model with the highest slag loading efficiency and the most stable performance. It has a high evaluation with the same specification of only Nissan model. In 2009, China's Ministry of Railways designated the localization of large-scale slag raking machine (tunnel digging and loading machine) as a science and technology project, which was researched and developed by Shijiazhuang Railway Institute and finally proced by the 6411 factory of the Chinese people's Liberation Army. WZ330 is similar to itc312 in appearance, and its hydraulic, power, motor and other components are still imported international famous brands, so it can achieve the slag loading capacity and stability of itc312. The electro-hydraulic proportional control and regulated power supply are improved to make it more suitable for large and long tunnel construction, but like most domestic high imitation procts, it is imported from domestic shell, The soup didn't change the dressing. Slag raking machine has changed the original construction of semi mechanized, intermittent slag transportation and requires a lot of manual cooperation of low speed, high safety risk and high cost. The slag raking machine integrates raking, digging, raking, loading, transporting and unloading. It has six functions of walking, digging, collecting, transporting, loading and cleaning the site. It has continuous and efficient proction. It is the current narrow site construction to ensure high yield, high efficiency, low safety risk and low cost; Enhance market competitiveness; Improve the proction progress and occupy the market quickly; It can be seen that the project can be completed ahead of schele. There are 80 cubic meters, 100 cubic meters, 120 cubic meters, 150 cubic meters, 180 cubic meters, 200 cubic meters, 220 cubic meters, 260 cubic meters, 312 cubic meters, 330 cubic meters and other ordinary and large slope types of earth materials transported by slag raking machine per hour; Design of gear pump and high pressure pump; Electric and oil electric al-use; Explosion proof type; Tire type, track type, crawler type. Liu Jiang, please choose the machinery according to the details of your own construction section, so as to achieve the best, most reasonable and most economical construction scheme. Slag raking machine is a new scientific and technological proct of underground excavation, excavation, transportation mechanical equipment instead of manual and intermittent machinery, which is the guarantee of safe and rapid underground engineering construction. It belongs to engineering machinery, tunnel mining equipment, underground excavation equipment, tunnel engineering equipment, railway tunnel engineering equipment, highway tunnel engineering equipment, power station diversion tunnel engineering equipment, mining equipment, mining roadway excavation equipment, water conservancy diversion tunnel excavation equipment, culvert excavation equipment, coal mine roadway excavation equipment, metal mine excavation equipment, iron mine excavation equipment Phosphate loading and unloading equipment, manganese mining and loading equipment, roadway engineering loading and unloading equipment, excavation equipment, conveying equipment, loading and unloading equipment, construction equipment, mining equipment, shoveling and transporting equipment, shoveling and transporting machinery, fully mechanized mining equipment, earthwork machinery, stonework machinery, concrete machinery, tunnel and underground equipment, road construction machinery, transfer equipment, tunnel machinery, material loading and unloading machinery, coal mine explosion-proof equipment. Wide range of uses, the most suitable for narrow space narrow site operation. Suitable section space of slag scraper [bucket loader]: provided by Liu Jiang of Jiangxi Da underground Technology Co., Ltd. The suitable cross section of the tyre scraper is 1.6 * 1.6m; 1.8 * 1.8m; 2 * 2m section. The suitable section of rail loader is 80 type 1.8 * 1.8m; 100 type 2.5 * 2.5m; 120 type 2.4 * 2.5m; 150 type, 2.5 * 2.8m; 160 Type 3.2 * 3.2m section. The selection of this model is mainly based on the mechanical equipment used to transport ore [such as rail transport, bucket car transport, shuttle car transport, etc.]. Suitable cross section of crawler excavator loader: 80 type 2 * 2.2m; 100 type 2.6 * 2.6m; 100 type 2.2 * 2.4; 120 type 2.3 * 2.6m; 120 type 2.8 * 2.8; 150 type, 2.5 * 2.9m; 150 type 3.5 * 3.5m; 180 type, 2.8 * 3.3m; 180 type, 3 * 4m; 180 type, 4 * 4m; 200 type 4 * 4m; 220 type 4.5 * 4.5m; 260 type 5 * 5m; 312 type, 5 * 5m; 330 type 5 * 5m section. Jiangxi Da underground Technology Co., Ltd. Suitable section for inclined shaft with large slope: 80 crawler type 2.4 * 2.5m section, with maximum working slope of 30 degrees; The maximum working gradient of 100 crawler type 2.6 * 2.6m section is 25 degrees; 120 crawler type 2.4 * 2.4m, maximum working gradient 28 degrees; 150 crawler type 3.5 * 3.5m, maximum working gradient 28 degrees; The maximum working gradient of 4 * 4m section of 180 crawler type is 32 degrees; 120 crawler type 2.8 * 2.8m, maximum working gradient 32 degrees; The maximum working gradient of 312 crawler type 5 * 5m section is 30 degrees. Tunnel section, tunnel section, roadway section, shaft section, inclined shaft section, drift section, diversion tunnel section, diversion tunnel section, culvert section, mine tunnel section, underground construction section, geotechnical engineering section, mining engineering section, excavation section, large section, small section excavation, transportation, traction, transportation equipment and accessories. Integrating proct engineering information, adjusting proct price is professional, professional and long-term purchasing can represent group buying, and group buying can get preferential treatment. Comprehensive display of proct information to help you understand and make decisions quickly, so that you can purchase voluntarily. The main equipment commonly used in the construction of large section or full section are as follows: Rail Transportation: gantry drilling jumbo, bolt support, vertical claw or rake bucket rail loader [slag loader], 10 ~ 30 cubic shuttle mine car or mining jumbo, 12 ton or 25t traction motor car, concrete spraying machine or delivery pump, and steel formwork jumbo. Trackless transportation: 3-arm or 4-arm tire and crawler electric hydraulic rock drilling jumbo, shotcrete anchor support, anchor jumbo, bucket crawler rock loader, 20 ~ 25 ton mining truck or pit truck [small secondary wheel, small Dongfeng], concrete jet or delivery pump, integral steel formwork jumbo. The advantages of trackless transportation are high proction efficiency, good mobility, overcoming the practical advantages of large slope work, small turning radius, strong working force, fast speed, not limited by conditions and so on. Although the initial investment is high, but the construction cost is low and fast, and the engineering quality is good, and the safety and environmental protection are constantly improving, which is now the commonly used construction method of underground construction. Main application of slag raking machine: it is suitable for tunnel excavation, transportation, mining engineering, water conservancy engineering construction machinery, medium and small section diversion tunnel, mine slag (ore) machinery. It is mainly used for the collection, transportation and loading of rock and soil materials in tunnels and mines with narrow proction space, such as coal mine, phosphate mine, iron mine, metal and non-metal mine. Features of slag raking machine: it is a proction device that combines the manipulator and conveyor, integrates the collection and conveying functions, and adopts the electro-hydraulic control system. It has the characteristics of safety and environmental protection, low energy consumption and high efficiency. It is a necessary advanced tunneling mining equipment for mine and Suidong, and a substitute for manual and other machinery. The machine shovels rock by crawler and scrapes the rock into its own scraper conveyor through bucket. The conveyor mps the rock into mp truck, shuttle car or other transfer equipment from the tail. At the same time, the backhoe digging arm can be used to pick up the distant rock, and the bucket can also be used to clean the working face. The machine adopts electric hydraulic transmission, with compact structure, large propulsion force and wide range of picking. It can load rock in full section without dead angle and manual cleaning; The main action of the machine is controlled by the pilot valve, which is easy to operate, stable and shock free, reliable in performance and convenient in maintenance; This machine has excellent humanized design. The hydraulic system is air-cooled. There are seats and driving shed. There are alarm systems for over limit travel, over high oil temperature, oil blockage and motor overload, which greatly rece the labor intensity of workers. It is safe, easy and comfortable for the driver to operate the machine. Advantages of slag raking machine: the machine includes six functions: hydraulic walking, excavation, collection, transportation, loading and site cleaning. Among them, the hydraulic walking function is to drive the wheels through the hydraulic motor, recer, transmission shaft, and then to the recer. The hydraulic motor has three functions: forward, backward and automatic braking[ 1] The digging and collecting function is completed by the manipulator. The manipulator has the functions of digging, extending arm, loading and unloading. The boom can rise, fall and rotate left and right. The operation of digging and collecting is controlled by full hydraulic pressure. It is operated by six handles, and each handle controls two actions, a total of 12 actions. This technology is improved by the operation process of large excavator, which is easy to use, The function of conveying and loading is completed by the conveyor system. The lifting of the conveyor frame is controlled by the hydraulic cylinder. When the conveyor frame descends, the front wheel can be supported. At the same time, the front material receiving port of the conveyor frame is more close to the ore contact surface, so the stability is stronger. At the same time, the bulk material can be joined. In a smooth way, the width of the conveyor belt is 650-700mm, and the transmission speed is 800-900mm / s, Another 2.2kW motor drives the recer to drive the driving roller, which makes the transmission performance more stable, the service life longer and the maintenance more convenient
rolling machine is a shaping machine for continuous point bending of sheet metal, with different shapes such as O-shape, U-shape, multi-stage R, etc< Rock loading machine a machine that loads ore or rock in a horizontal or gently inclined tunnel. According to work
4. Chapter 1 Definitions Article 1 the provisions are based on the relevant provisions of proction safety law, mine safety law, regulations on coal mine safety supervision and regulations on coal mine safety. This regulation is applicable to the rail transportation of the transportation roadway, including the rail transportation of the main transportation roadway of the mine, the rail transportation of the transportation roadway between different levels, the rail transportation of the transportation roadway in the mining area, the rail transportation of the two transportation roadways of the working face, and the rail transportation of various temporary transportation roadways< Chapter 2 organization and management article 3 each unit shall establish a "safety responsibility system for leaders in charge of auxiliary transportation" at all levels to clarify the management responsibility, scope and key work
Article 4 each unit shall specify a leader to be responsible for the auxiliary transportation of the whole mine and take the leadership responsibility for the transportation safety of the mine
Article 5 each unit shall have a transport functional management organization with a clear person in charge, who is specially responsible for the auxiliary transport management of the unit and directly responsible for the transport safety of the unit
Article 6 specifies that the full-time transport team leader and a person in charge of the non full-time transport unit shall take direct leadership responsibility for the auxiliary transport safety within the management scope of the unit< Article 7 defines the scope of responsibilities of the transport functional management organization:
1. The mechanical and electrical department is the functional department managed by the transport functional management organization of each unit, which is responsible for organizing and coordinating the design review, comprehensive deployment, installation acceptance, supervision and inspection of the auxiliary transport equipment of each unit, and taking the responsibility of business guidance. The mine safety supervision department is responsible for the inspection and supervision of the auxiliary transportation of the whole mine< Second, adhere to the principle of "who uses, who manages, who bears direct safety responsibility". The person in charge of the relevant business unit is responsible for the management, and the specific leader is mainly responsible
thirdly, according to the actual situation of the mine, formulate the implementation rules of auxiliary transportation management, clarify the responsibilities of all levels, timely find and deal with the problems of auxiliary transportation system, and establish relevant reward and punishment methods< Fourth, the training plan, training, examination and annual review of the Department in charge of training for winch driver, hook operator, signalman, battery truck driver and other key jobs< 5. Be responsible for the inspection, recording and assessment of whether the winch driver, Hooker, signalman and battery truck driver are qualified before the shift and whether they work in compliance with regulations ring the shift< Sixth, check the track, turnout quality, equipment and facilities, good condition of mining vehicles, measures
fulfillment, operation in compliance with regulations, site environment and system establishment of the auxiliary transportation line of the whole mine, deal with the problems found in time, and rectify within a time limit
VII. Organize the acceptance of transportation roadway facilities and hoisting winch before operation< 8. Be responsible for the selection, design and installation of anti sports car and anti sports car protection device in transportation lane. Responsible for the preparation and summary of annual, quarterly and monthly work plans of mine auxiliary transportation. All units applying for the use of dispatching, double speed and column return winches must calculate according to the slope, transportation distance, maximum lifting load, traction mode and other data of the construction roadway, correctly select the winch model and steel wire rope, and then assemble and install the winch, sound and light signal, electrical small parts and cables after being reviewed and approved by the mine mechanical and electrical department< Chapter III General Provisions Article 8 special measures must be formulated to transport four super (super long, super wide, super high and overweight) vehicles
Article 9 any transportation unit using transportation lane dispatching, double speed and return winch must fill in the following records: inspection,
overhaul and maintenance records. Inspection and replacement record of steel wire rope. Electrical and mechanical fault records
Article 10 any transportation unit that uses transportation lane dispatching, double speed and return winch must formulate the following system: post responsibility system for the driver, hook operator and signal operator. Operation proceres for driver, coupler and signalman. Driver, hook operator and signal
shift system. Patrol inspection, maintenance and repair system
Article 11 "three good, four have, three implement" and "three fixed, four insurance" must be achieved for small winch transportation
three good: the winch equipment is in good condition, the roadway specification and support are good, and the track quality is good
four have: reliable anti sports car and sports car protection device, rope roller, signal and refuge chamber, sound and light signal
three implementation: implementation of post responsibility system, implementation of inspection and maintenance responsibility, and implementation of shift handover system. Three fixed: fixed driver, fixed signal worker, fixed hook worker
four insurances: safety gate, safety rope, safety pin and safety chamber
Article 12 the driver of small winch must be "six don't open". That is to say, if the winch is not in good condition, if the wire rope is knotted or broken, if the wire is worn beyond the limit, if the safety facilities and signal facilities are not complete, if the super trailer is not opened, if the signal is not clear, if the "four super" vehicles are not opened without transportation measures
Article 13 the hook workers must be "six not linked". That is: if the safety facilities are not complete and reliable, if the signal is not connected properly, if the "four super" vehicles are not connected without transportation measures, if the heavy vehicle loading is not standard, if the connecting device is not qualified, if there are pedestrians in the transportation lane. Before sending the signal, the hook head, bolt, three link chain, steel wire rope, vehicle connection and safety rope must be checked comprehensively. After confirming that the connection is normal and the winch has no remaining rope, the signal can be sent to start
Article 14 the signalman must achieve "five don't send out": there are pedestrians on winch road don't send out; The Super Trailer will not be launched; No delivery without the consent of the hook operator; If the loading does not meet the requirements, it will not be delivered; No hair without a safety rope
Article 15 when the winch is in operation, the transportation lane must implement the system of "no driving, no pedestrians, no driving". It is forbidden to push the hook in the transportation lane. When the personnel need to be transported up and down the line by the small winch, it must be allowed by the hooker. The signalman sends the signal to inform the driver. After the personnel pass, they must return to the signal before they can work. When the red light is on, it is strictly forbidden to get on and off
Article 16 it is strictly forbidden to push the hook in auxiliary transportation, and pedestrians are strictly prohibited when driving. When personnel go up and down, they can only go up and down with the consent of the hook operator and send a stop signal, and the winch stops running; The sound and light alarm device linked with winch must be installed at the loading and unloading yard of transportation lane and each mping crossing
Article 17 it is forbidden to rest and work in the winch chamber when the winch is running the hook. When working in the transportation lane, safety measures must be prepared, submitted to the relevant leaders for approval, and can only work after contacting with the relevant personnel
Article 18 when transporting the "four super" vehicles in the transportation lane, they must be tied firmly, lifted and transported separately, the center of gravity is not biased, and they must be connected with special multi link connectors. If other items are used instead, measures must be taken and approved by the leader in charge
Article 19 special binding measures must be formulated for large-scale materials, and special personnel shall be responsible for it. Large equipment into the well must be fixed with anchor bolts, and the upper and lower ends are protected by protective chains
Article 20 each mine must establish a management account for the transport lane and register the technical parameters of the transport lane equipment and facilities; The calculation basis and process of the selected equipment and facilities; The equipment and facilities are in good condition, and the charter party is responsible for it; Management unit changes and inspection problems. Record the original design and construction of equipment and facilities
Chapter IV transportation roadway, yard and chamber
Article 21 winch chamber, each yard, swing lane and chamber must be designed, and its roadway section, sidewalk width, safety distance between equipment and facilities and vehicles, safety distance between double track yard, etc. must comply with the provisions of Article 21, 22 and 23 of "coal mine safety regulations". Refuge adits must be set up at the car yard and each crossing in the transportation lane< Article 22 specific requirements for each depot:
I. the length of each depot in the small transportation lane of mining and transportation is 1.5 times of the length of one lifting train
2. The length of each yard in the main transportation lane is more than 3 times of the length of one-time lifting train
3. No negative slope shall be formed in the car park to prevent the vehicles from sliding down< The width of the yard meets the requirements of Article 23 of the coal mine safety regulations
Article 23 the number of hoisting cars for inclined roadway dispatching and return winch transportation must meet the following requirements: single rope winding hoisting winch, the number of hoisting cars must be calculated and marked on the site management board. The number of lifting cars must be calculated and marked on the site management plate. Qualified chains should be used to connect the cars. Transportation without connection between vehicles is strictly prohibited
Article 24 the track radius of the middle and lower yards of the transportation lane must be designed to meet the needs of installing standard turnouts
Article 25 the winch and equipment chamber must be excavated for the construction of the reverse drawworks and the opposite drawworks in the haulage lane
Article 26 the front of the back-up winch must be supported with body protection pillars (no less than 2) or stone stacks
Article 27 when there are rail and belt or chute transportation in the same roadway, the safety distance between them must comply with the provisions of Article 22 of "coal mine safety regulations". The driver's operating room must be excavated at the head of the chute and belt conveyor, and it is forbidden to operate the chute and belt on the rail side
Article 28 the main transportation lane must be designed and constructed with regular ditch, complete cover plate, and the running water shall not scour the road center
Article 29 the chamber of small winch shall meet the design requirements, and the distance between the most prominent part of winch and one side of roadway or shed shall not be less than the specified distance. The chamber support is qualified
Article 30 the drum center of lifting winch shall coincide with the track center line, and the lateral arrangement can be adopted in the near horizontal machine lane and air lane. The angle between the drum center line of the winch and the track center line shall be appropriate, so as to make the wire ropes arranged orderly, installed firmly and operated conveniently. No rope biting, rope climbing, rope skipping and orderly arrangement. The tail rope head of the steel wire rope must be pressed on the winch drum, the rope pressing plate shall not be less than two pairs, and the rope head shall not grind the winch motor end cover screw
Article 31 the backhauling winch for driving uphill construction shall be installed on the outside of the track, and the flat guide wheel shall be installed at the head, and its diameter selection shall comply with the provisions of article 416 of "coal mine safety regulations", and it is forbidden to replace it with small sliding plate. The fixing method of the guide wheel shall be clearly specified in the construction measures, all of which shall be exposed to facilitate inspection, and the person in charge of the inspection shall be assigned. The fixing of the guide wheel of the backward drawworks must be designed
Chapter V installation of dispatching, double speed and return winch
Article 32 the installation of dispatching, double speed and return winch must meet the following standards:
1. When using jd-25 and above winch, it must be fixed with concrete foundation or ground anchor. The foundation design shall meet the design requirements of winch manufacturer, and the foundation size and anchor screw shall be constructed according to the specification
2. The installation of jd-11.4 small winch should be determined according to the lithology of roadway floor:
(1) for the roadway with hard sandstone floor, the winch can be fixed by bolting
(2) for the roadway with medium hard sandy shale floor, the method of bolting can also be used to fix the winch, but the ground anchor can only be used after the anchoring force test
(3) for long-term permanent winch and roadway with soft rock and coal floor, concrete foundation can be used to fix the winch
(4) the column pressing winch can only be used when it moves along with the advancing of the mining face, and its number should be increased
Article 4 each unit shall specify a leader to be responsible for the auxiliary transportation of the whole mine and take the leadership responsibility for the transportation safety of the mine
Article 5 each unit shall have a transport functional management organization with a clear person in charge, who is specially responsible for the auxiliary transport management of the unit and directly responsible for the transport safety of the unit
Article 6 specifies that the full-time transport team leader and a person in charge of the non full-time transport unit shall take direct leadership responsibility for the auxiliary transport safety within the management scope of the unit< Article 7 defines the scope of responsibilities of the transport functional management organization:
1. The mechanical and electrical department is the functional department managed by the transport functional management organization of each unit, which is responsible for organizing and coordinating the design review, comprehensive deployment, installation acceptance, supervision and inspection of the auxiliary transport equipment of each unit, and taking the responsibility of business guidance. The mine safety supervision department is responsible for the inspection and supervision of the auxiliary transportation of the whole mine< Second, adhere to the principle of "who uses, who manages, who bears direct safety responsibility". The person in charge of the relevant business unit is responsible for the management, and the specific leader is mainly responsible
thirdly, according to the actual situation of the mine, formulate the implementation rules of auxiliary transportation management, clarify the responsibilities of all levels, timely find and deal with the problems of auxiliary transportation system, and establish relevant reward and punishment methods< Fourth, the training plan, training, examination and annual review of the Department in charge of training for winch driver, hook operator, signalman, battery truck driver and other key jobs< 5. Be responsible for the inspection, recording and assessment of whether the winch driver, Hooker, signalman and battery truck driver are qualified before the shift and whether they work in compliance with regulations ring the shift< Sixth, check the track, turnout quality, equipment and facilities, good condition of mining vehicles, measures
fulfillment, operation in compliance with regulations, site environment and system establishment of the auxiliary transportation line of the whole mine, deal with the problems found in time, and rectify within a time limit
VII. Organize the acceptance of transportation roadway facilities and hoisting winch before operation< 8. Be responsible for the selection, design and installation of anti sports car and anti sports car protection device in transportation lane. Responsible for the preparation and summary of annual, quarterly and monthly work plans of mine auxiliary transportation. All units applying for the use of dispatching, double speed and column return winches must calculate according to the slope, transportation distance, maximum lifting load, traction mode and other data of the construction roadway, correctly select the winch model and steel wire rope, and then assemble and install the winch, sound and light signal, electrical small parts and cables after being reviewed and approved by the mine mechanical and electrical department< Chapter III General Provisions Article 8 special measures must be formulated to transport four super (super long, super wide, super high and overweight) vehicles
Article 9 any transportation unit using transportation lane dispatching, double speed and return winch must fill in the following records: inspection,
overhaul and maintenance records. Inspection and replacement record of steel wire rope. Electrical and mechanical fault records
Article 10 any transportation unit that uses transportation lane dispatching, double speed and return winch must formulate the following system: post responsibility system for the driver, hook operator and signal operator. Operation proceres for driver, coupler and signalman. Driver, hook operator and signal
shift system. Patrol inspection, maintenance and repair system
Article 11 "three good, four have, three implement" and "three fixed, four insurance" must be achieved for small winch transportation
three good: the winch equipment is in good condition, the roadway specification and support are good, and the track quality is good
four have: reliable anti sports car and sports car protection device, rope roller, signal and refuge chamber, sound and light signal
three implementation: implementation of post responsibility system, implementation of inspection and maintenance responsibility, and implementation of shift handover system. Three fixed: fixed driver, fixed signal worker, fixed hook worker
four insurances: safety gate, safety rope, safety pin and safety chamber
Article 12 the driver of small winch must be "six don't open". That is to say, if the winch is not in good condition, if the wire rope is knotted or broken, if the wire is worn beyond the limit, if the safety facilities and signal facilities are not complete, if the super trailer is not opened, if the signal is not clear, if the "four super" vehicles are not opened without transportation measures
Article 13 the hook workers must be "six not linked". That is: if the safety facilities are not complete and reliable, if the signal is not connected properly, if the "four super" vehicles are not connected without transportation measures, if the heavy vehicle loading is not standard, if the connecting device is not qualified, if there are pedestrians in the transportation lane. Before sending the signal, the hook head, bolt, three link chain, steel wire rope, vehicle connection and safety rope must be checked comprehensively. After confirming that the connection is normal and the winch has no remaining rope, the signal can be sent to start
Article 14 the signalman must achieve "five don't send out": there are pedestrians on winch road don't send out; The Super Trailer will not be launched; No delivery without the consent of the hook operator; If the loading does not meet the requirements, it will not be delivered; No hair without a safety rope
Article 15 when the winch is in operation, the transportation lane must implement the system of "no driving, no pedestrians, no driving". It is forbidden to push the hook in the transportation lane. When the personnel need to be transported up and down the line by the small winch, it must be allowed by the hooker. The signalman sends the signal to inform the driver. After the personnel pass, they must return to the signal before they can work. When the red light is on, it is strictly forbidden to get on and off
Article 16 it is strictly forbidden to push the hook in auxiliary transportation, and pedestrians are strictly prohibited when driving. When personnel go up and down, they can only go up and down with the consent of the hook operator and send a stop signal, and the winch stops running; The sound and light alarm device linked with winch must be installed at the loading and unloading yard of transportation lane and each mping crossing
Article 17 it is forbidden to rest and work in the winch chamber when the winch is running the hook. When working in the transportation lane, safety measures must be prepared, submitted to the relevant leaders for approval, and can only work after contacting with the relevant personnel
Article 18 when transporting the "four super" vehicles in the transportation lane, they must be tied firmly, lifted and transported separately, the center of gravity is not biased, and they must be connected with special multi link connectors. If other items are used instead, measures must be taken and approved by the leader in charge
Article 19 special binding measures must be formulated for large-scale materials, and special personnel shall be responsible for it. Large equipment into the well must be fixed with anchor bolts, and the upper and lower ends are protected by protective chains
Article 20 each mine must establish a management account for the transport lane and register the technical parameters of the transport lane equipment and facilities; The calculation basis and process of the selected equipment and facilities; The equipment and facilities are in good condition, and the charter party is responsible for it; Management unit changes and inspection problems. Record the original design and construction of equipment and facilities
Chapter IV transportation roadway, yard and chamber
Article 21 winch chamber, each yard, swing lane and chamber must be designed, and its roadway section, sidewalk width, safety distance between equipment and facilities and vehicles, safety distance between double track yard, etc. must comply with the provisions of Article 21, 22 and 23 of "coal mine safety regulations". Refuge adits must be set up at the car yard and each crossing in the transportation lane< Article 22 specific requirements for each depot:
I. the length of each depot in the small transportation lane of mining and transportation is 1.5 times of the length of one lifting train
2. The length of each yard in the main transportation lane is more than 3 times of the length of one-time lifting train
3. No negative slope shall be formed in the car park to prevent the vehicles from sliding down< The width of the yard meets the requirements of Article 23 of the coal mine safety regulations
Article 23 the number of hoisting cars for inclined roadway dispatching and return winch transportation must meet the following requirements: single rope winding hoisting winch, the number of hoisting cars must be calculated and marked on the site management board. The number of lifting cars must be calculated and marked on the site management plate. Qualified chains should be used to connect the cars. Transportation without connection between vehicles is strictly prohibited
Article 24 the track radius of the middle and lower yards of the transportation lane must be designed to meet the needs of installing standard turnouts
Article 25 the winch and equipment chamber must be excavated for the construction of the reverse drawworks and the opposite drawworks in the haulage lane
Article 26 the front of the back-up winch must be supported with body protection pillars (no less than 2) or stone stacks
Article 27 when there are rail and belt or chute transportation in the same roadway, the safety distance between them must comply with the provisions of Article 22 of "coal mine safety regulations". The driver's operating room must be excavated at the head of the chute and belt conveyor, and it is forbidden to operate the chute and belt on the rail side
Article 28 the main transportation lane must be designed and constructed with regular ditch, complete cover plate, and the running water shall not scour the road center
Article 29 the chamber of small winch shall meet the design requirements, and the distance between the most prominent part of winch and one side of roadway or shed shall not be less than the specified distance. The chamber support is qualified
Article 30 the drum center of lifting winch shall coincide with the track center line, and the lateral arrangement can be adopted in the near horizontal machine lane and air lane. The angle between the drum center line of the winch and the track center line shall be appropriate, so as to make the wire ropes arranged orderly, installed firmly and operated conveniently. No rope biting, rope climbing, rope skipping and orderly arrangement. The tail rope head of the steel wire rope must be pressed on the winch drum, the rope pressing plate shall not be less than two pairs, and the rope head shall not grind the winch motor end cover screw
Article 31 the backhauling winch for driving uphill construction shall be installed on the outside of the track, and the flat guide wheel shall be installed at the head, and its diameter selection shall comply with the provisions of article 416 of "coal mine safety regulations", and it is forbidden to replace it with small sliding plate. The fixing method of the guide wheel shall be clearly specified in the construction measures, all of which shall be exposed to facilitate inspection, and the person in charge of the inspection shall be assigned. The fixing of the guide wheel of the backward drawworks must be designed
Chapter V installation of dispatching, double speed and return winch
Article 32 the installation of dispatching, double speed and return winch must meet the following standards:
1. When using jd-25 and above winch, it must be fixed with concrete foundation or ground anchor. The foundation design shall meet the design requirements of winch manufacturer, and the foundation size and anchor screw shall be constructed according to the specification
2. The installation of jd-11.4 small winch should be determined according to the lithology of roadway floor:
(1) for the roadway with hard sandstone floor, the winch can be fixed by bolting
(2) for the roadway with medium hard sandy shale floor, the method of bolting can also be used to fix the winch, but the ground anchor can only be used after the anchoring force test
(3) for long-term permanent winch and roadway with soft rock and coal floor, concrete foundation can be used to fix the winch
(4) the column pressing winch can only be used when it moves along with the advancing of the mining face, and its number should be increased
5. Electromechanical Safety Quality Standardization standard and assessment score table
total score of mine:
serial number Inspection items Assessment and scoring method Standard
score Actual score The reasons for dection
total one hundred
one Equipment and index thirty < br />1 The mechanical and electrical equipment must have the proct certificate, the coal mine proct safety mark, and the explosion-proof equipment must have the explosion-proof certificate On site inspection, if one is found unqualified, no score will be given five < br />2 The intact rate of mechanical and electrical equipment in the whole mine is 90% For on-site inspection, 0.5 points will be dected for every 1% rection five < br />3 The large fixed equipment in use is in good condition 1.5 points will be dected if one is not in good condition ring on-site inspection three < br />4 Explosion proof rate of explosion-proof electrical equipment and small electrical appliances is 100% No score will be given if one set (piece) is found to be lost ring on-site inspection five < br />5 The qualified rate of small electrical appliances is 95% For on-site inspection, 0.5 points will be dected for every 1% rection two < br />6 The qualified rate of cable hanging is 95% For on-site inspection, 0.5 points will be dected for every 1% rection two < br />7 The intact rate of miner's lamp is 95%, and there is no red light or off light for miner's lamp in use underground On site inspection, no score below 95%, spot check no less than 50, 0.5 points dected if a red light is found underground; One point will be dected if the lights are off two < br />8 5% of equipment to be repaired For on-site inspection, 1 point will be dected for every 1% increase two < br />9 Electromechanical accident rate 1% Check the report and record, accumulate by month, no score if it is more than 2%, no score if it is inconsistent with the record two < br />10 No non-standard and obsolete equipment 0.5 points will be dected if one is found one < br />11 Have the equipment overhaul plan issued by the company (bureau), and can complete 90% or more If there is no overhaul plan or the completion rate of the plan is less than 90%, if it is less than 25% in the first half of the year, no score will be given one
two Electromechanical Safety thirty < br /> The safety protection device is complete and reliable, and the qualified rate is 100% < br />1 Main lifting system five < br /> The vertical shaft (inclined shaft) hoisting system should be equipped with: (1) under voltage protection 2) Over current protection 3) Over winding protection 4) Gate gap protection 5) Over speed protection 6) Speed limit protection 7) Loose rope protection 8) The signal and control circuit are locked 9) Single rope cage lifting with anti falling device 10) The communication signals are perfect and meet the requirements 11) Depth indicator failure protection 12) Full bin protection device 13) Deceleration function protection 14) The function protection against over winding, over speed, speed limit and deceleration is set as independent double line type 15) Auxiliary shaft and negative lifting system are equipped with electric braking 16) If the braking deceleration degree of inclined shaft lifting can not meet the requirements, secondary braking device shall be set 17) Lifting winch height One point will be dected if one site inspection fails. three
inspector: professional team leader: inspection time:
Electromechanical Safety Quality Standardization standard and assessment score table (continued Table 1)
total score of mine:
serial number Inspection items Assessment and scoring method Standard
score Actual score The reasons for dection
Low voltage double circuit 18) Shaft wellhead facilities interlocking 19) Anti collision beam and can supporting device of shaft hoisting system 20) The overwinding height and overwinding distance of shaft hoisting system meet the requirements 21) the skip of main shaft is loaded with fixed weight 22) install instrial TV monitor at upper and lower wellhead < br /> Main lifting belt conveyor
installation of wire rope traction belt: ① under voltage protection; ②; Over current protection; ③ De grooving protection; ④ Over speed protection; ⑤ Local overload protection of conveyor belt; ⑥ When the wire rope tensioning car reaches the terminal point and the tensioning heavy hammer falls to the ground for protection; ⑦ There should be an emergency stop device that can be operated by passengers or other personnel at any place of the whole length of the conveyor; ⑧ Sound and light signal and automatic stop device for dismounting place; ⑨ Installation of steel cord belt: ① under voltage protection; 2; ② Over current protection; ③ Coal storage protection; ④ Anti skid protection; ⑤ Anti deviation device; ⑥ Temperature protection; ⑦ Smoke protection; ⑧ Automatic sprinkler; ⑨ Belt tension drop protection; ⑩ Tear protection; (11) anti reversing device and braking device shall be set up ring up running, and braking device shall be set up ring down running; (12) belt break protection device. One disqualification is not scored two < br />2 Mine ventilation system has:
(1) 2) . anti wind facilities 3) Explosion proof door 4) The motor has over-current protection and no voltage release device 5) Bearing has over temperature indication and alarm signal 6) . there is a private phone If one item is missing or one place is unqualified, no score will be given one < br />3 The compressed air system has over temperature protection, water and oil cut-off protection or signal, motor over-current protection, safety valve and pressure relief valve reliable action If one item is missing or one place is unqualified, no score will be given. one < br />4 The main drainage system includes: closed door; The distribution gate is complete and flexible; Reliable water diversion device; Short circuit protection; The motor protection is complete; The safe passage is unblocked; Under voltage protection If one item is missing or one place is unqualified, no score will be given one < br />5 The steam boiler of heating system (instrial boiler system with evaporation capacity of 2T / h and above) is equipped with two-color water level gauge or two independent water level gauges, with high and low water level alarm device, and the action of safety valve and blowdown valve is reliable. The hot water boiler shall be equipped with thermometer, safety valve, overtemperature protection and automatic water supply device, with reliable action, pressure recing valve, overpressure alarm and interlock protection in the system. If one item is missing or one place is unqualified, no score will be given one
inspector: professional team leader: inspection time:
Electromechanical Safety Quality Standardization standard and assessment score table (continued Table 2)
total score of mine:
serial number Inspection items Assessment and scoring method Standard
score Actual score Reasons for dection
6 The ground power supply system has: (1) special double circuits for main equipment 2) Direct supply motor or switch with capacitor has under voltage protection 3) Over current protection 4) Switch cabinet "five prevention" function 5) The switch cabinet with reverse power transmission shall be locked and clearly marked 6) The substation shall have reliable tripping power supply 7) The high voltage distribution board is equipped with selective grounding protection 8) The single-phase grounding capacitive current meets the requirements 9) The main operation mode meets the requirements 10) Electrical work order and operation order meet the requirements 11) There is a private phone On site inspection, one less item or one unqualified item: (1) no score; (2) ~ (11) dect 1 point three < br />7 Underground power supply system twelve < br />1 Qualified power supply system design and protection setting verification 0.5 points will be dected if one of them fails to pass the on-site inspection and data checking two < br />2 High voltage flameproof switch should be installed: (1) under voltage release protection 2) Short circuit protection 3) Overload protection 4) Selective grounding protection device 5) The vacuum high voltage explosion-proof switch should also be equipped with overvoltage protection
the general high voltage switch for mining should be installed with: (1) under voltage protection 2) Short circuit protection 0.5 points will be dected if one part is not installed or unqualified (1) ~ (2) ring on-site inspection or data checking 3) Dect 0.2 point for (5) one point five < br />3 Low voltage motors are equipped with short circuit, overload, single-phase disconnection, leakage blocking protection and remote control devices. If one part is not installed or unqualified, no score will be given one < br />4 The motor of 40kW and above shall be controlled by vacuum electromagnetic force starter, and the motor shall be protected comprehensively If one part is not installed or unqualified, no score will be given. one < br />5 Comprehensive protection for 127V power supply system (including signal lighting, electric coal drill, etc.) 0.5 points will be dected if one part is not installed or unqualified ring on-site inspection or data checking one < br />6 Local fans and electrical equipment in heading face must be equipped with wind power locking device If one part is not installed or unqualified, no score will be given. one < br />7 Wind power locking device and gas power locking device must be installed in coal roadway driving face If one part is not installed or unqualified, no score will be given. one point five < br />8 Four small wires and power cables use flame retardant cables 0.5 points will be dected if one cable is unqualified, 0.5 points will be dected if one cable joint of intrinsically safe system is unqualified, and the unqualified cable joint of non intrinsically safe system will be punished as loss of explosion one < br />9 Low voltage power supply system must be equipped with leakage detection protection or selective leakage protection device. 0.5 points will be dected if one non conformity is found ring on-site inspection or data checking one < br />10 The grounding protection meets the requirements of "detailed rules for installation, inspection and measurement of underground protective grounding devices in coal mines" If one disqualification is found ring on-site inspection, no score will be given one
inspector: professional team leader: inspection time:
Electromechanical Safety Quality Standardization standard and assessment score table (continued Table 3)
total score of mine:
serial number Inspection items Assessment and scoring method Standard
score Actual score Reasons for dection
8 Mining and transportation equipment six < br />1 The shearer is equipped with locking device for emergency stop scraper conveyor, and the fully mechanized working face is equipped with communication and lighting. The working face with inclination of 15 degrees and above must be equipped with anti-skid device. The working face of coal plough shall be equipped with devices that can stop the plough head and scraper conveyor at any time or send signals to the driver of coal plough at least every 30 m. The plough head position indicator shall be provided. When the inclination angle of working face is more than 12 degrees, the scraper conveyor must be equipped with anti-skid and anchoring devices. The loader shall be equipped with rail clamping device, brake, protective railings and lighting. The buzzer, lighting and emergency stop switch of roadheader are complete. 0.5 points will be dected if one item is missing or one place is unqualified in on-site inspection or inspection data three < br />2 Scraper conveyor, belt conveyor
hydraulic coupling of scraper conveyor, using water (or fire-resistant liquid) medium, using qualified fusible plug and explosion-proof sheet
flame retardant belt is used for belt conveyor, with anti-skid, coal stacking, anti deviation, temperature and smoke protection, automatic sprinkling device, protective barrier at the head, shield at the tail, and crossing bridge at pedestrian crossing The head and tail of the conveyor are fixed firmly 0.5 points will be dected if one non conformity is found ring on-site inspection or data checking two < br />3 The hydraulic system
has complete parts and components, the pipeline and valve group are not connected and leaking, and the pump station pressure meets the requirements 0.1 point will be dected for one disqualification ring on-site inspection one
three Mechanical and electrical management, civilized proction forty < br />1 There are mechanical and electrical departments and electrical, cable, small electrical appliances, explosion-proof inspection, equipment, accessories, grease, tape professional management team five < br />1 Mechanical and electrical department in charge and play a leading role in charge of business There is no department in charge or it doesn't work, no score one < br />2 Business flow chart suitable for integrated management No, no, No one < br />3 ( 1) Electrical management 2) Cable management 3) Small electrical equipment management 4) Explosion proof inspection 5) Equipment management 6) Spare parts management 7) Oil management (including emulsion Management) If one item is found to be unmanaged or mismanaged, 1 point will be dected three < br />2 Carry out comprehensive management of equipment eight < br />1 Participate in the overall planning of major equipment Check information, no planning or implementation is not good score one < br />2 Reasonable selection Check the equipment, find one does not meet the requirements, no score one < br />3 Timely installation 0.5 points will be dected if one of the equipment is found not to meet the requirements one
inspector: professional team leader: inspection time:
Electromechanical Safety and quality standardization standards and assessment
total score of mine:
serial number Inspection items Assessment and scoring method Standard
score Actual score The reasons for dection
total one hundred
one Equipment and index thirty < br />1 The mechanical and electrical equipment must have the proct certificate, the coal mine proct safety mark, and the explosion-proof equipment must have the explosion-proof certificate On site inspection, if one is found unqualified, no score will be given five < br />2 The intact rate of mechanical and electrical equipment in the whole mine is 90% For on-site inspection, 0.5 points will be dected for every 1% rection five < br />3 The large fixed equipment in use is in good condition 1.5 points will be dected if one is not in good condition ring on-site inspection three < br />4 Explosion proof rate of explosion-proof electrical equipment and small electrical appliances is 100% No score will be given if one set (piece) is found to be lost ring on-site inspection five < br />5 The qualified rate of small electrical appliances is 95% For on-site inspection, 0.5 points will be dected for every 1% rection two < br />6 The qualified rate of cable hanging is 95% For on-site inspection, 0.5 points will be dected for every 1% rection two < br />7 The intact rate of miner's lamp is 95%, and there is no red light or off light for miner's lamp in use underground On site inspection, no score below 95%, spot check no less than 50, 0.5 points dected if a red light is found underground; One point will be dected if the lights are off two < br />8 5% of equipment to be repaired For on-site inspection, 1 point will be dected for every 1% increase two < br />9 Electromechanical accident rate 1% Check the report and record, accumulate by month, no score if it is more than 2%, no score if it is inconsistent with the record two < br />10 No non-standard and obsolete equipment 0.5 points will be dected if one is found one < br />11 Have the equipment overhaul plan issued by the company (bureau), and can complete 90% or more If there is no overhaul plan or the completion rate of the plan is less than 90%, if it is less than 25% in the first half of the year, no score will be given one
two Electromechanical Safety thirty < br /> The safety protection device is complete and reliable, and the qualified rate is 100% < br />1 Main lifting system five < br /> The vertical shaft (inclined shaft) hoisting system should be equipped with: (1) under voltage protection 2) Over current protection 3) Over winding protection 4) Gate gap protection 5) Over speed protection 6) Speed limit protection 7) Loose rope protection 8) The signal and control circuit are locked 9) Single rope cage lifting with anti falling device 10) The communication signals are perfect and meet the requirements 11) Depth indicator failure protection 12) Full bin protection device 13) Deceleration function protection 14) The function protection against over winding, over speed, speed limit and deceleration is set as independent double line type 15) Auxiliary shaft and negative lifting system are equipped with electric braking 16) If the braking deceleration degree of inclined shaft lifting can not meet the requirements, secondary braking device shall be set 17) Lifting winch height One point will be dected if one site inspection fails. three
inspector: professional team leader: inspection time:
Electromechanical Safety Quality Standardization standard and assessment score table (continued Table 1)
total score of mine:
serial number Inspection items Assessment and scoring method Standard
score Actual score The reasons for dection
Low voltage double circuit 18) Shaft wellhead facilities interlocking 19) Anti collision beam and can supporting device of shaft hoisting system 20) The overwinding height and overwinding distance of shaft hoisting system meet the requirements 21) the skip of main shaft is loaded with fixed weight 22) install instrial TV monitor at upper and lower wellhead < br /> Main lifting belt conveyor
installation of wire rope traction belt: ① under voltage protection; ②; Over current protection; ③ De grooving protection; ④ Over speed protection; ⑤ Local overload protection of conveyor belt; ⑥ When the wire rope tensioning car reaches the terminal point and the tensioning heavy hammer falls to the ground for protection; ⑦ There should be an emergency stop device that can be operated by passengers or other personnel at any place of the whole length of the conveyor; ⑧ Sound and light signal and automatic stop device for dismounting place; ⑨ Installation of steel cord belt: ① under voltage protection; 2; ② Over current protection; ③ Coal storage protection; ④ Anti skid protection; ⑤ Anti deviation device; ⑥ Temperature protection; ⑦ Smoke protection; ⑧ Automatic sprinkler; ⑨ Belt tension drop protection; ⑩ Tear protection; (11) anti reversing device and braking device shall be set up ring up running, and braking device shall be set up ring down running; (12) belt break protection device. One disqualification is not scored two < br />2 Mine ventilation system has:
(1) 2) . anti wind facilities 3) Explosion proof door 4) The motor has over-current protection and no voltage release device 5) Bearing has over temperature indication and alarm signal 6) . there is a private phone If one item is missing or one place is unqualified, no score will be given one < br />3 The compressed air system has over temperature protection, water and oil cut-off protection or signal, motor over-current protection, safety valve and pressure relief valve reliable action If one item is missing or one place is unqualified, no score will be given. one < br />4 The main drainage system includes: closed door; The distribution gate is complete and flexible; Reliable water diversion device; Short circuit protection; The motor protection is complete; The safe passage is unblocked; Under voltage protection If one item is missing or one place is unqualified, no score will be given one < br />5 The steam boiler of heating system (instrial boiler system with evaporation capacity of 2T / h and above) is equipped with two-color water level gauge or two independent water level gauges, with high and low water level alarm device, and the action of safety valve and blowdown valve is reliable. The hot water boiler shall be equipped with thermometer, safety valve, overtemperature protection and automatic water supply device, with reliable action, pressure recing valve, overpressure alarm and interlock protection in the system. If one item is missing or one place is unqualified, no score will be given one
inspector: professional team leader: inspection time:
Electromechanical Safety Quality Standardization standard and assessment score table (continued Table 2)
total score of mine:
serial number Inspection items Assessment and scoring method Standard
score Actual score Reasons for dection
6 The ground power supply system has: (1) special double circuits for main equipment 2) Direct supply motor or switch with capacitor has under voltage protection 3) Over current protection 4) Switch cabinet "five prevention" function 5) The switch cabinet with reverse power transmission shall be locked and clearly marked 6) The substation shall have reliable tripping power supply 7) The high voltage distribution board is equipped with selective grounding protection 8) The single-phase grounding capacitive current meets the requirements 9) The main operation mode meets the requirements 10) Electrical work order and operation order meet the requirements 11) There is a private phone On site inspection, one less item or one unqualified item: (1) no score; (2) ~ (11) dect 1 point three < br />7 Underground power supply system twelve < br />1 Qualified power supply system design and protection setting verification 0.5 points will be dected if one of them fails to pass the on-site inspection and data checking two < br />2 High voltage flameproof switch should be installed: (1) under voltage release protection 2) Short circuit protection 3) Overload protection 4) Selective grounding protection device 5) The vacuum high voltage explosion-proof switch should also be equipped with overvoltage protection
the general high voltage switch for mining should be installed with: (1) under voltage protection 2) Short circuit protection 0.5 points will be dected if one part is not installed or unqualified (1) ~ (2) ring on-site inspection or data checking 3) Dect 0.2 point for (5) one point five < br />3 Low voltage motors are equipped with short circuit, overload, single-phase disconnection, leakage blocking protection and remote control devices. If one part is not installed or unqualified, no score will be given one < br />4 The motor of 40kW and above shall be controlled by vacuum electromagnetic force starter, and the motor shall be protected comprehensively If one part is not installed or unqualified, no score will be given. one < br />5 Comprehensive protection for 127V power supply system (including signal lighting, electric coal drill, etc.) 0.5 points will be dected if one part is not installed or unqualified ring on-site inspection or data checking one < br />6 Local fans and electrical equipment in heading face must be equipped with wind power locking device If one part is not installed or unqualified, no score will be given. one < br />7 Wind power locking device and gas power locking device must be installed in coal roadway driving face If one part is not installed or unqualified, no score will be given. one point five < br />8 Four small wires and power cables use flame retardant cables 0.5 points will be dected if one cable is unqualified, 0.5 points will be dected if one cable joint of intrinsically safe system is unqualified, and the unqualified cable joint of non intrinsically safe system will be punished as loss of explosion one < br />9 Low voltage power supply system must be equipped with leakage detection protection or selective leakage protection device. 0.5 points will be dected if one non conformity is found ring on-site inspection or data checking one < br />10 The grounding protection meets the requirements of "detailed rules for installation, inspection and measurement of underground protective grounding devices in coal mines" If one disqualification is found ring on-site inspection, no score will be given one
inspector: professional team leader: inspection time:
Electromechanical Safety Quality Standardization standard and assessment score table (continued Table 3)
total score of mine:
serial number Inspection items Assessment and scoring method Standard
score Actual score Reasons for dection
8 Mining and transportation equipment six < br />1 The shearer is equipped with locking device for emergency stop scraper conveyor, and the fully mechanized working face is equipped with communication and lighting. The working face with inclination of 15 degrees and above must be equipped with anti-skid device. The working face of coal plough shall be equipped with devices that can stop the plough head and scraper conveyor at any time or send signals to the driver of coal plough at least every 30 m. The plough head position indicator shall be provided. When the inclination angle of working face is more than 12 degrees, the scraper conveyor must be equipped with anti-skid and anchoring devices. The loader shall be equipped with rail clamping device, brake, protective railings and lighting. The buzzer, lighting and emergency stop switch of roadheader are complete. 0.5 points will be dected if one item is missing or one place is unqualified in on-site inspection or inspection data three < br />2 Scraper conveyor, belt conveyor
hydraulic coupling of scraper conveyor, using water (or fire-resistant liquid) medium, using qualified fusible plug and explosion-proof sheet
flame retardant belt is used for belt conveyor, with anti-skid, coal stacking, anti deviation, temperature and smoke protection, automatic sprinkling device, protective barrier at the head, shield at the tail, and crossing bridge at pedestrian crossing The head and tail of the conveyor are fixed firmly 0.5 points will be dected if one non conformity is found ring on-site inspection or data checking two < br />3 The hydraulic system
has complete parts and components, the pipeline and valve group are not connected and leaking, and the pump station pressure meets the requirements 0.1 point will be dected for one disqualification ring on-site inspection one
three Mechanical and electrical management, civilized proction forty < br />1 There are mechanical and electrical departments and electrical, cable, small electrical appliances, explosion-proof inspection, equipment, accessories, grease, tape professional management team five < br />1 Mechanical and electrical department in charge and play a leading role in charge of business There is no department in charge or it doesn't work, no score one < br />2 Business flow chart suitable for integrated management No, no, No one < br />3 ( 1) Electrical management 2) Cable management 3) Small electrical equipment management 4) Explosion proof inspection 5) Equipment management 6) Spare parts management 7) Oil management (including emulsion Management) If one item is found to be unmanaged or mismanaged, 1 point will be dected three < br />2 Carry out comprehensive management of equipment eight < br />1 Participate in the overall planning of major equipment Check information, no planning or implementation is not good score one < br />2 Reasonable selection Check the equipment, find one does not meet the requirements, no score one < br />3 Timely installation 0.5 points will be dected if one of the equipment is found not to meet the requirements one
inspector: professional team leader: inspection time:
Electromechanical Safety and quality standardization standards and assessment