Position: Home page » Pool » Stoppers for mining machines

Stoppers for mining machines

Publish: 2021-04-22 21:43:04
1. What is GEC model? Cloud mining machine

as a platform with the highest currency price in cloud mining machine project, GEC has been imitated all the time<

10 RMB miner digs 11 RMB in 30 days

100 RMB miner digs 120 RMB in 30 days

1000 RMB miner digs 1300 RMB in 30 days

10000 RMB miner digs 14000 RMB in 30 days

in fact, this is a static income. With the currency price unchanged, your interest rate in one month is between 10% and 40%, which can be increased dozens of times in one year after re investment. In addition, the currency price promised by the platform will always increase steadily, One year's income is estimated to be hundreds of times, who is not interested

in order to quickly develop to members, all cloud mining machine projects are registered to proce 11 yuan per month. Because there is no money in the early opening market, people who want to invest can not receive money, so they can only continuously raise the price of money. One month later, a large number of sheep and wool parties began to sell goods, and investors wanted to buy at a low price, resulting in the continuous decline of money price,, The more severe the drop, the more people sell. Until all platforms sell at a low price, no one dares to continue to close. This is why most platforms die within two months. Even after barely spending the first two months, there are still a large number of new users registering every day. Every new user means 11 more free coins. The increase of wool coins will make it difficult for the price of coins to rise

GEC and eco have lived a long time since last year. I'm not advertising for them here, but I don't recommend you to play, because they are basically taking orders

in March this year, a lot of crowdfunding cloud mining machine projects were launched. It can be said that all of them were dead, and they couldn't survive for a week. It was a complete scam. They are all under the guise of crowdfunding 3 points and opening 1 yuan. After all, it costs a lot to buy coins from other users, and the proceres are complicated. If you buy tens of thousands of coins directly from the platform, the cost is low and the profit is large. In the case of too few user groups, a large number of coins appear, which will only break and will not grow. In addition, platform crowdfunding makes a lot of money, and they don't pay attention to the development of the platform. They just think about how to get away from it. Many crowdfunding platforms close their websites and disband their groups after crowdfunding

everyone can build such a website. If you can program, you may only need to spend less than 1000 yuan to buy a set of source code on Taobao. Revise it yourself

if the programming is blank, you need to spend about 2W RMB to buy a full set of templates and services< As like as two peas as like as two peas as like as two peas, Br />
this is why all cloud mine machine models are exactly the same, the frames are exactly the same, what the contents are exactly the same, even the mine machine icons have their own logo. Such a platform is not a blockchain project at all. The amount of money is controlled by the platform itself. To make money on the platform, it is to sell money to investors secretly. Many people have changed from investors to fleecers just because they know the trick

the so-called trading platform is just a joke. A currency that doesn't even have a digital wallet, and a currency that can change the quantity at will, which exchange will accept it

what is your personal thinking? Making a sum is a sum. You can't think for a long time, and you can't add new functions to the platform. Therefore, I personally suggest that you should be careful when investing in this cloud mining platform, especially if it doesn't run smoothly. Even a better server is reluctant to invest. How can we develop this platform with our heart

If a platform wants to develop for a long time, it is not the same layer. It needs to be adjusted according to the development situation in different periods. The most important thing is to have actual application scenarios. No matter bitcoin or these air coins are supported by actual application scenarios, they will graally disappear with the passage of time.
2.

1. First of all, connect the network cable, plug the network cable into the network cable interface of the mining machine, and remember to plug it tightly. Only when the miner is connected to the Internet, there is no limit to the broadband

extended data

users can buy bitcoin, at the same time, they can also use computers to "mine" bitcoin according to a large number of calculations. When users "mine" bitcoin, they need to use the computer to search for 64 bit numbers, and then compete with other gold miners by repeatedly solving puzzles to provide the required numbers for the bitcoin network. If the user's computer successfully creates a set of numbers, then they will get 25 bitcoins

e to the decentralized programming adopted by the bitcoin system, only 25 bitcoins can be obtained every 10 minutes, and by 2140, the maximum number of bitcoins in circulation will reach 21 million. In other words, bitcoin system is able to achieve self-sufficiency, resist inflation through coding, and prevent others from destroying these codes

3. If you want to dig a mine, you should understand these first, and then decide whether to join the army of miners or not
as a miner, I used graphics card very early and then butterfly machine. At present, I use Avalon's 220 miner and just received a new 180 ant miner. To tell you the truth, mining is not as simple as you think. Here I will list some practical difficulties you need to face in mining. If you find that some of these items can't be solved and overcome for the time being, don't rush to buy a miner, because from the moment you buy, if you can't mine, Then you will face a real loss

first, list the problems to face
1, be able to accept the noise - the noise of the mining machine is very loud, which is equivalent to that you put the air conditioner outside the room
1-1, strong hands-on ability - the noise can be controlled to a certain extent by adding water cooling, but it needs to be done by yourself. The installation process of water cooling is not as simple as the online tutorial. It needs to be extremely careful. The capacitor on the logic board is easy to touch, and it must be successful at one time. Once the refrigerant is added, the machine will have problems again, It would be disastrous to dismantle the water cooling system
1-2, conditional repair of the chip capacitor - in the process of water cooling installation, the capacitor is easy to fall off, these chip capacitors are very difficult to weld
2, you can set up the network - you can't just plug in the Internet cable! Need to understand the routing, know how to change the IP of the router, mining IP is fixed, according to mining IP to do settings
2-1, you can get a fixed IP address - if you are mining in a company, you can't set up a route, so you must have the condition to get a fixed IP, and then set up your own network through this IP
3. The environment of continuous power supply and continuous network - mining is a 24-hour business. Don't take it for granted that a meeting is OK in one day. Many companies will cut off power at midnight. This must be made clear
3-1. In low temperature environment, in addition to 24-hour continuous power supply, there should also be a relatively cold environment. In actual mining, we can clearly feel the importance of temperature for mining<

let's assume two scenarios,
in the company:
if your working environment is very quiet, it is not suitable, even if water cooling is installed. If you are a senior blue collar, in the workshop, do you have the conditions to set up the network and get a fixed IP? If you can't, give up
at home:
can you stand noise? Can tolerate to a certain extent
is it possible to install water cooling? It can be installed conditionally
is it possible to set up a network? There are also conditions to set up the network
is it warm in that room? Yes, but you can open windows on the second bedroom or balcony
is it possible to pull the wire and the wiring board in the balcony? No problem
congratulations, you can buy a miner to dig it up, but if one of them doesn't work, you need to think carefully before making a decision
the above-mentioned points should not be taken as unimportant or major problems. For example, it is necessary to have the conditions to install water cooling, for example, in a lower temperature environment, for example, to have a fixed IP
when the miner starts to operate and makes a rumbling sound, if you are in the company, you have to turn it off awkwardly. If you are at home, you need to figure out how to explain to your family or girlfriend that the noise will exist for 24 hours, and hope they don't mind

if your home is warm, your miner will never be able to achieve the highest computing power it can. You must accept it calmly, don't be depressed, it's useless to find the seller. Unless you open the window to let in the cold air, you will find that you and the miner are so out of place. That's why laomaozi is very fond of mining< Make complaints about mobile phone, br / > and if you work hard to move the mine to the company, you may think that the electricity charge is in the whole province. You can't get the mine to connect. Then you can only move the mine to home or sell it as a second-hand machine...

these words are typed word by word by me. I hope it can help you. You must find out whether you are qualified to do this at present. As for how to dig, it's a very simple thing: buy a miner, register an account on a mining website, Download a multibit to store the bitcoin you get, and link the miner to the network for power on, Set up the network, give it the fixed IP specified on the chassis, use the computer to access the IP, make some simple settings, and then wait for the receipt
what else can I ask you
4. It is recommended that you take a look at the Z3 matrix mining machine of Diancun technology. It has high configuration, high performance and low energy consumption. When the main network of filecoin goes online, it must be the first choice for home mining machine.
5. Chapter 1 Definitions Article 1 the provisions are based on the relevant provisions of proction safety law, mine safety law, regulations on coal mine safety supervision and regulations on coal mine safety. This regulation is applicable to the rail transportation of the transportation roadway, including the rail transportation of the main transportation roadway of the mine, the rail transportation of the transportation roadway between different levels, the rail transportation of the transportation roadway in the mining area, the rail transportation of the two transportation roadways of the working face, and the rail transportation of various temporary transportation roadways< Chapter 2 organization and management article 3 each unit shall establish a "safety responsibility system for leaders in charge of auxiliary transportation" at all levels to clarify the management responsibility, scope and key work
Article 4 each unit shall specify a leader to be responsible for the auxiliary transportation of the whole mine and take the leadership responsibility for the transportation safety of the mine
Article 5 each unit shall have a transport functional management organization with a clear person in charge, who is specially responsible for the auxiliary transport management of the unit and directly responsible for the transport safety of the unit
Article 6 specifies that the full-time transport team leader and a person in charge of the non full-time transport unit shall take direct leadership responsibility for the auxiliary transport safety within the management scope of the unit< Article 7 defines the scope of responsibilities of the transport functional management organization:
1. The mechanical and electrical department is the functional department managed by the transport functional management organization of each unit, which is responsible for organizing and coordinating the design review, comprehensive deployment, installation acceptance, supervision and inspection of the auxiliary transport equipment of each unit, and taking the responsibility of business guidance. The mine safety supervision department is responsible for the inspection and supervision of the auxiliary transportation of the whole mine< Second, adhere to the principle of "who uses, who manages, who bears direct safety responsibility". The person in charge of the relevant business unit is responsible for the management, and the specific leader is mainly responsible
thirdly, according to the actual situation of the mine, formulate the implementation rules of auxiliary transportation management, clarify the responsibilities of all levels, timely find and deal with the problems of auxiliary transportation system, and establish relevant reward and punishment methods< Fourth, the training plan, training, examination and annual review of the Department in charge of training for winch driver, hook operator, signalman, battery truck driver and other key jobs< 5. Be responsible for the inspection, recording and assessment of whether the winch driver, Hooker, signalman and battery truck driver are qualified before the shift and whether they work in compliance with regulations ring the shift< Sixth, check the track, turnout quality, equipment and facilities, good condition of mining vehicles, measures
fulfillment, operation in compliance with regulations, site environment and system establishment of the auxiliary transportation line of the whole mine, deal with the problems found in time, and rectify within a time limit
VII. Organize the acceptance of transportation roadway facilities and hoisting winch before operation< 8. Be responsible for the selection, design and installation of anti sports car and anti sports car protection device in transportation lane. Responsible for the preparation and summary of annual, quarterly and monthly work plans of mine auxiliary transportation. All units applying for the use of dispatching, double speed and column return winches must calculate according to the slope, transportation distance, maximum lifting load, traction mode and other data of the construction roadway, correctly select the winch model and steel wire rope, and then assemble and install the winch, sound and light signal, electrical small parts and cables after being reviewed and approved by the mine mechanical and electrical department< Chapter III General Provisions Article 8 special measures must be formulated to transport four super (super long, super wide, super high and overweight) vehicles
Article 9 any transportation unit using transportation lane dispatching, double speed and return winch must fill in the following records: inspection,
overhaul and maintenance records. Inspection and replacement record of steel wire rope. Electrical and mechanical fault records
Article 10 any transportation unit that uses transportation lane dispatching, double speed and return winch must formulate the following system: post responsibility system for the driver, hook operator and signal operator. Operation proceres for driver, coupler and signalman. Driver, hook operator and signal
shift system. Patrol inspection, maintenance and repair system
Article 11 "three good, four have, three implement" and "three fixed, four insurance" must be achieved for small winch transportation
three good: the winch equipment is in good condition, the roadway specification and support are good, and the track quality is good
four have: reliable anti sports car and sports car protection device, rope roller, signal and refuge chamber, sound and light signal
three implementation: implementation of post responsibility system, implementation of inspection and maintenance responsibility, and implementation of shift handover system. Three fixed: fixed driver, fixed signal worker, fixed hook worker
four insurances: safety gate, safety rope, safety pin and safety chamber
Article 12 the driver of small winch must be "six don't open". That is to say, if the winch is not in good condition, if the wire rope is knotted or broken, if the wire is worn beyond the limit, if the safety facilities and signal facilities are not complete, if the super trailer is not opened, if the signal is not clear, if the "four super" vehicles are not opened without transportation measures
Article 13 the hook workers must be "six not linked". That is: if the safety facilities are not complete and reliable, if the signal is not connected properly, if the "four super" vehicles are not connected without transportation measures, if the heavy vehicle loading is not standard, if the connecting device is not qualified, if there are pedestrians in the transportation lane. Before sending the signal, the hook head, bolt, three link chain, steel wire rope, vehicle connection and safety rope must be checked comprehensively. After confirming that the connection is normal and the winch has no remaining rope, the signal can be sent to start
Article 14 the signalman must achieve "five don't send out": there are pedestrians on winch road don't send out; The Super Trailer will not be launched; No delivery without the consent of the hook operator; If the loading does not meet the requirements, it will not be delivered; No hair without a safety rope
Article 15 when the winch is in operation, the transportation lane must implement the system of "no driving, no pedestrians, no driving". It is forbidden to push the hook in the transportation lane. When the personnel need to be transported up and down the line by the small winch, it must be allowed by the hooker. The signalman sends the signal to inform the driver. After the personnel pass, they must return to the signal before they can work. When the red light is on, it is strictly forbidden to get on and off
Article 16 it is strictly forbidden to push the hook in auxiliary transportation, and pedestrians are strictly prohibited when driving. When personnel go up and down, they can only go up and down with the consent of the hook operator and send a stop signal, and the winch stops running; The sound and light alarm device linked with winch must be installed at the loading and unloading yard of transportation lane and each mping crossing
Article 17 it is forbidden to rest and work in the winch chamber when the winch is running the hook. When working in the transportation lane, safety measures must be prepared, submitted to the relevant leaders for approval, and can only work after contacting with the relevant personnel
Article 18 when transporting the "four super" vehicles in the transportation lane, they must be tied firmly, lifted and transported separately, the center of gravity is not biased, and they must be connected with special multi link connectors. If other items are used instead, measures must be taken and approved by the leader in charge
Article 19 special binding measures must be formulated for large-scale materials, and special personnel shall be responsible for it. Large equipment into the well must be fixed with anchor bolts, and the upper and lower ends are protected by protective chains
Article 20 each mine must establish a management account for the transport lane and register the technical parameters of the transport lane equipment and facilities; The calculation basis and process of the selected equipment and facilities; The equipment and facilities are in good condition, and the charter party is responsible for it; Management unit changes and inspection problems. Record the original design and construction of equipment and facilities
Chapter IV transportation roadway, yard and chamber
Article 21 winch chamber, each yard, swing lane and chamber must be designed, and its roadway section, sidewalk width, safety distance between equipment and facilities and vehicles, safety distance between double track yard, etc. must comply with the provisions of Article 21, 22 and 23 of "coal mine safety regulations". Refuge adits must be set up at the car yard and each crossing in the transportation lane< Article 22 specific requirements for each depot:
I. the length of each depot in the small transportation lane of mining and transportation is 1.5 times of the length of one lifting train
2. The length of each yard in the main transportation lane is more than 3 times of the length of one-time lifting train
3. No negative slope shall be formed in the car park to prevent the vehicles from sliding down< The width of the yard meets the requirements of Article 23 of the coal mine safety regulations
Article 23 the number of hoisting cars for inclined roadway dispatching and return winch transportation must meet the following requirements: single rope winding hoisting winch, the number of hoisting cars must be calculated and marked on the site management board. The number of lifting cars must be calculated and marked on the site management plate. Qualified chains should be used to connect the cars. Transportation without connection between vehicles is strictly prohibited
Article 24 the track radius of the middle and lower yards of the transportation lane must be designed to meet the needs of installing standard turnouts
Article 25 the winch and equipment chamber must be excavated for the construction of the reverse drawworks and the opposite drawworks in the haulage lane
Article 26 the front of the back-up winch must be supported with body protection pillars (no less than 2) or stone stacks
Article 27 when there are rail and belt or chute transportation in the same roadway, the safety distance between them must comply with the provisions of Article 22 of "coal mine safety regulations". The driver's operating room must be excavated at the head of the chute and belt conveyor, and it is forbidden to operate the chute and belt on the rail side
Article 28 the main transportation lane must be designed and constructed with regular ditch, complete cover plate, and the running water shall not scour the road center
Article 29 the chamber of small winch shall meet the design requirements, and the distance between the most prominent part of winch and one side of roadway or shed shall not be less than the specified distance. The chamber support is qualified
Article 30 the drum center of lifting winch shall coincide with the track center line, and the lateral arrangement can be adopted in the near horizontal machine lane and air lane. The angle between the drum center line of the winch and the track center line shall be appropriate, so as to make the wire ropes arranged orderly, installed firmly and operated conveniently. No rope biting, rope climbing, rope skipping and orderly arrangement. The tail rope head of the steel wire rope must be pressed on the winch drum, the rope pressing plate shall not be less than two pairs, and the rope head shall not grind the winch motor end cover screw
Article 31 the backhauling winch for driving uphill construction shall be installed on the outside of the track, and the flat guide wheel shall be installed at the head, and its diameter selection shall comply with the provisions of article 416 of "coal mine safety regulations", and it is forbidden to replace it with small sliding plate. The fixing method of the guide wheel shall be clearly specified in the construction measures, all of which shall be exposed to facilitate inspection, and the person in charge of the inspection shall be assigned. The fixing of the guide wheel of the backward drawworks must be designed
Chapter V installation of dispatching, double speed and return winch
Article 32 the installation of dispatching, double speed and return winch must meet the following standards:
1. When using jd-25 and above winch, it must be fixed with concrete foundation or ground anchor. The foundation design shall meet the design requirements of winch manufacturer, and the foundation size and anchor screw shall be constructed according to the specification
2. The installation of jd-11.4 small winch should be determined according to the lithology of roadway floor:
(1) for the roadway with hard sandstone floor, the winch can be fixed by bolting
(2) for the roadway with medium hard sandy shale floor, the method of bolting can also be used to fix the winch, but the ground anchor can only be used after the anchoring force test
(3) for long-term permanent winch and roadway with soft rock and coal floor, concrete foundation can be used to fix the winch
(4) the column pressing winch can only be used when it moves along with the advancing of the mining face, and its number should be increased
6. Blizzard mining machine, we all know, high configuration, node computing power, strong.
7.

Guizhou anda mining machinery manufacturing Instrial Park Co., Ltd. is a limited liability company (invested or controlled by natural person) registered on April 10, 2014. Its registered address is located in Changtian village, Mengjiang street, Huishui County, Qiannan Buyi and Miao Autonomous Prefecture, Guizhou Province (Shuanghe new area, economic development zone)

the unified social credit code / registration number of Guizhou anda mining machinery manufacturing Instrial Park Co., Ltd. is 9152273109730507x2, and the enterprise legal person is Li Jiasheng. At present, the enterprise is in business

the business scope of Guizhou anda mining machinery manufacturing Instrial Park Co., Ltd. is: planning, construction and investment services in the instrial park; Manufacturing of electrical equipment, lighting equipment, initiating explosive procts, communication signal equipment, drilling machines and tools, lifting and transportation equipment, power locomotive, ventilation and st prevention facilities, flame retardant and antistatic procts, environmental safety equipment, support equipment and underground power equipment; Steel and procts, wujiaohua procts, hardware tools, labor insurance sales Projects that need to be approved according to law can be operated only after being approved by relevant departments)

check more information of Guizhou anda mining machinery manufacturing Instrial Park Co., Ltd

8. The suspension device includes main lifting frame, bearing plate, main pull rod, buffer spring and safety chain; Suspension device
suspension device is the connecting mechanism between cage and wire rope, which is a safety device. At present, most of the domestic mines adopt hydraulic screw, hydraulic cushion block type suspension device and multi rope lifting wire rope tension automatic balance suspension device
the multi rope lifting wire rope tension automatic balance suspension device is aimed at the problem that the hydraulic screw type and hydraulic cushion block type rope adjusters commonly used at home and abroad can not automatically adjust the wire rope tension. The device adopts an automatic balance system with closed connection and pull-out clasp structure, which is safe, reliable, compact and beautiful, and can realize the wire rope tension in motion with high precision Automatic balance under static state improves the operation, safety, reliability and operation efficiency of the hoist, reces the uneven wear of the liner and the times of turning the rope groove, prolongs the service life of the liner and wire rope, and greatly reces the maintenance workload
guide device
the roller can ear is a guide device which is installed on the cage and runs up and down along the rigid combined tank channel. It can not only be used as a guide wheel for cage to run along the channel, but also connect the cage with the channel, and transfer the force between the cage and the channel. It is not only an important device for safe and stable operation of cage, but also a key part affecting the working stability of shaft equipment. Roller cage ear is the medium of interaction between cage and shaft equipment, and its working performance plays a very important role in the working quality of shaft rigid equipment. The cage must be equipped with roller ears which are suitable for the cage and the conditions of the well channel
at present, there are many kinds of roller materials, such as wear-resistant rubber, ordinary rubber, polymer materials and so on. Buffer device is more, such as ordinary spring buffer device, hydraulic buffer device, torsion rubber spring buffer device, disc spring and so on. The buffer spring is a composite structure, which is equipped with spring, spring preload and roller position adjustment device. The spring is disc spring with sealing device. A spring preload adjusting device and a spring suspension length adjusting device are simultaneously arranged on the sealing shell, and the spring suspension length adjusting device is used to adjust the position of the roller. The utility model has the advantages that the position adjustment of the worn roller is simple and convenient. The spring pre tightening force is easy to adjust, the spring is sealed in the shell, the work is reliable, and the service life is long
body
body is composed of upper, middle and lower plates, car stopper and column. The suspension device is directly connected with the main body, that is, the main and auxiliary suspenders and the four corner plates are canceled, and the suspension device is directly connected with the main beam, which not only reces the height of the cage and the height of the well tower, but also greatly reces the weight of the main body, with simple structure and convenient installation
the hanging plate is the main force bearing part of the cage, which bears all the load of the cage, the dead weight of the equipment, the weight of the tail rope and the friction resistance between the roller and the channel ring operation. Therefore, the material selection and process requirements are very strict. The main girder is the main stressed part of the cage, so great attention should be paid to the calculation, material selection and manufacturing. During manufacturing, it must be noted that the rolling direction of the steel plate should be consistent with the stress direction, the machining allowance of 10 ~ 20 mm should be reserved around, and the flaw detection should be carried out in strict accordance with the relevant standards, and the steel plate can be assembled and formed only after it is qualified
the car stopper adopts rail surface bump and sliding car stopper, which is used together with pin gear operation equipment
to sum up, the design and manufacturing process of large cage has been graally improved, and it is widely used at home and abroad, so it is the preferred equipment for large mines. For example, the cage of Yantai Xinhai mine adopts multi rope friction hoist, steel rope tension automatic balance suspension device and liquid immersion disc spring roller cage ear, plus the use of advanced anti-corrosion measures, integrating various advantages, the equipment will play a maximum efficiency in the process of transportation and lifting< br />
Hot content
Inn digger Publish: 2021-05-29 20:04:36 Views: 341
Purchase of virtual currency in trust contract dispute Publish: 2021-05-29 20:04:33 Views: 942
Blockchain trust machine Publish: 2021-05-29 20:04:26 Views: 720
Brief introduction of ant mine Publish: 2021-05-29 20:04:25 Views: 848
Will digital currency open in November Publish: 2021-05-29 19:56:16 Views: 861
Global digital currency asset exchange Publish: 2021-05-29 19:54:29 Views: 603
Mining chip machine S11 Publish: 2021-05-29 19:54:26 Views: 945
Ethereum algorithm Sha3 Publish: 2021-05-29 19:52:40 Views: 643
Talking about blockchain is not reliable Publish: 2021-05-29 19:52:26 Views: 754
Mining machine node query Publish: 2021-05-29 19:36:37 Views: 750