270x and 280x mining
1; 2. Electricity address property ownership certificate (real estate certificate, house property certificate, house purchase contract, collective land use certificate, etc.); 3. If the agent is entrusted, the identity certificate and power of attorney of the agent shall be provided. 4. Relevant payment information shall be submitted if the electricity charge is dected by the bank. If the capacity is increased within the original power consumption range, there is no need to provide the power consumption address, property ownership certification materials and payment information. The specific information is subject to the requirements of each city Note: the required information shall be provided with the original, and one of the verified and signed copies which are consistent with the original.)
after preparing the above materials, you can pay attention to "China Southern Power Grid 95598" public service platform "my electricity consumption" > "business processing" > "Electricity Application & gt; Select the corresponding business type, view the business description and processing process > click "processing" > fill in the basic information and then submit to self-service power application.
if you are in Guangdong Province (excluding Guangzhou and Shenzhen), you need to install a new meter. Specific information and operation methods are as follows:
residents need to provide: 1. The identity certificate of the head of household (ID card, household register, etc.); 2. Electricity address property ownership certificate (real estate certificate, house property certificate, house purchase contract, collective land use certificate, etc.); 3. If the agent is entrusted, the identity certificate and power of attorney of the agent shall be provided. 4. Relevant payment information shall be submitted if the electricity charge is dected by the bank
non residents need to provide: 1. Customer identity certificate (business license, corporate identity certificate, etc.); 2. Electricity address property ownership certificate (real estate certificate, real estate certificate, state-owned land use certificate, collective land use certificate, etc.); 3. If the agent is entrusted, the identity certificate and power of attorney of the agent shall be provided. 4. Relevant payment information shall be submitted if the electricity charge is dected by the bank
the specific information is subject to the requirements of each city. After preparing the above information, follow the "China Southern Power Grid 95598" public platform through mobile phone, and use "my electricity & gt; Business processing & gt; Or log in to the unified service platform of China Southern Power Grid and click "online business > My Business > business processing" to submit the business application.
The village committee will write a power electricity application meeting (the electricity fee is cheap), take the ID card and to the local state grid to apply for opening an account, and then go home to buy the wire and wait, the electrician will go to install it, the cost is 1000 yuan (including the meter and the meter box)
1. User's electricity application report or application form
2. The power supply intention agreement signed by both parties before the establishment of the new project
3. Power supply scheme approved by power supply enterprises
4
5
6
Other relevant documents agreed by both parties in advance{rrrrrrr}
extended data:
Any unit or indivial who needs to install new electricity or increase electricity consumption capacity or change electricity consumption must, in accordance with the provisions of these rules, apply to the electricity business site of the power supply enterprise in advance and go through the formalities. The power supply enterprise shall announce the proceres, systems and charging standards for handling various electricity business in the electricity business place
when applying for new installation or additional power consumption, the user shall provide the power supply enterprise with the approval documents of power consumption project and relevant power consumption data, including the power consumption location, power use, power consumption nature, list of power consumption equipment, power load, security power, power consumption planning, etc., and truthfully fill in the power consumption application form and go through the required proceres according to the format specified by the power supply enterprise
in the project approval stage of a new power receiving project, the user should contact the power supply enterprise to reach an intentional agreement on the possibility of power supply, power consumption capacity and power supply conditions of the project before locating and determining the project
According to the power supply business rules, the necessary proceres are as follows:
Article 16 Any unit or indivial who needs to install new electricity or increase electricity consumption capacity or change electricity consumption must, in accordance with the provisions of these rules, apply to the power supply enterprise's electricity business place in advance and go through the proceres
power supply enterprises should announce the proceres, systems and charging standards for various electricity business in the electricity business places
Article 17 the electricity using business organizations of power supply enterprises are responsible for the centralized handling of the electricity application and installation and connection work of users, including the issuance and examination of electricity application, the investigation of power supply conditions, the determination and reply of power supply scheme, the collection of relevant fees, the examination of power receiving engineering design, the intermediate inspection of construction, the completion inspection, the signing of power supply and consumption contract (agreement), and the acceptance of power supply and consumption contract (agreement) Installation of meters and power supply
Article 18 when applying for new installation or additional power consumption, the user shall provide the power supply enterprise with the approval documents of power consumption project and relevant power consumption data, including the power consumption location, power use, power consumption nature, list of power consumption equipment, power load, security power, power consumption planning, etc., and truthfully fill in the power consumption application form and go through the required proceres according to the format specified by the power supply enterprise
Article 92 before formal power supply, the power supply enterprise and the user shall sign a power supply contract according to the power demand of the user, the power supply capacity of the power supply enterprise and the following documents that have been recognized or agreed upon by both parties when handling the power application:
1
2. The power supply intention agreement signed by both parties before the establishment of the new project
3. Power supply scheme approved by power supply enterprises
4
5
6
Other relevant documents agreed by both parties in advancefor users with large power consumption or special requirements for power supply, when signing the power supply contract, they can sign the electricity fee settlement agreement and power dispatching agreement separately
1. Take the ID card, house property card and other relevant documents of the residents to the business hall of the power station
2. For details, please consult the relevant personnel in the business hall
3. After the power supply company accepts the application for electricity, it will send personnel to inspect the site. If the installation conditions are met, it will specify the installation location and inform the user to pay the fee. After the user has paid all the expenses to the power supply department, the staff of the power supply company will install the meter and connect the power on the door, and the reply period and installation period of the power supply scheme shall not exceed the promised time limit
the three-phase line voltage of low-voltage power supply lines in China is 380V, while the phase voltage to ground (neutral line, also known as zero line) is 220V. When using phase voltage power supply, if the zero line is missing, the grounding wire of the equipment can be used as the zero line, but the good grounding should be ensured (generally, except for three-phase four wire power supply, the equipment is equipped with grounding wire)
no matter N line or PE line, repeat grounding should be adopted at the user side to improve the reliability. However, repeated grounding is only repeated grounding. It can only be connected at or near the grounding point, but it can never be connected at any position, especially indoors