Position: Home page » Equipment » 270x and 280x mining

270x and 280x mining

Publish: 2021-05-05 19:49:31
1. Can buy to see the color, do not change color, the kind of yellow
2. At present, it belongs to high-end graphics card. If you play it for three years, it's still middle end graphics card. You can play mainstream games. Just like the previous hd6850, mainstream games have no pressure, and most stand-alone games can run smoothly
3. Change antivirus software! Jinshan dominates or reloads the system quickly, conveniently and thoroughly
4. Electricity consumption in agricultural proction refers to electricity consumption in rural areas, farms or agricultural proction bases, such as electric plow, well drilling, irrigation and pumping (excluding electricity for drainage and irrigation in paddy fields), fertilizer accumulation, seedling raising, insect catching, non-profit farmers' ration processing and livestock feed processing, planting or cultivating fruit trees, vegetables, afforestation, livestock breeding, aquaculture and fishing. If your electricity nature meets the above conditions, you can apply for electricity for agricultural proction. It is recommended that you prepare the following information:
1; 2. Electricity address property ownership certificate (real estate certificate, house property certificate, house purchase contract, collective land use certificate, etc.); 3. If the agent is entrusted, the identity certificate and power of attorney of the agent shall be provided. 4. Relevant payment information shall be submitted if the electricity charge is dected by the bank. If the capacity is increased within the original power consumption range, there is no need to provide the power consumption address, property ownership certification materials and payment information. The specific information is subject to the requirements of each city Note: the required information shall be provided with the original, and one of the verified and signed copies which are consistent with the original.)
after preparing the above materials, you can pay attention to "China Southern Power Grid 95598" public service platform "my electricity consumption" > "business processing" > "Electricity Application & gt; Select the corresponding business type, view the business description and processing process > click "processing" > fill in the basic information and then submit to self-service power application.
5. Go to the local electricity management office for examination and approval, issue a certificate in the brigade on behalf of the ID card, and then go to the electricity management office to fill in a form. The electricity meter is punched in, and you can pay for it with a card,
6. [about the cost] if you are consulting about the cost of installing a new meter, according to Article 23 of the regulations on power supply and use, you should go to the local power supply enterprise to apply for new electricity, temporary electricity, increase electricity capacity, change electricity and terminate electricity, and pay the cost according to the relevant national regulations; If the power supply enterprise has no reasonable reason for refusing to supply power, it shall supply power. The power supply enterprise shall announce the procere, system and charging standard of electricity utilization in its business place. Generally, the power supply department does not need to charge for new installation and capacity increase. In case of special circumstances, the on-site investigation of the staff shall prevail
if you are in Guangdong Province (excluding Guangzhou and Shenzhen), you need to install a new meter. Specific information and operation methods are as follows:
residents need to provide: 1. The identity certificate of the head of household (ID card, household register, etc.); 2. Electricity address property ownership certificate (real estate certificate, house property certificate, house purchase contract, collective land use certificate, etc.); 3. If the agent is entrusted, the identity certificate and power of attorney of the agent shall be provided. 4. Relevant payment information shall be submitted if the electricity charge is dected by the bank
non residents need to provide: 1. Customer identity certificate (business license, corporate identity certificate, etc.); 2. Electricity address property ownership certificate (real estate certificate, real estate certificate, state-owned land use certificate, collective land use certificate, etc.); 3. If the agent is entrusted, the identity certificate and power of attorney of the agent shall be provided. 4. Relevant payment information shall be submitted if the electricity charge is dected by the bank
the specific information is subject to the requirements of each city. After preparing the above information, follow the "China Southern Power Grid 95598" public platform through mobile phone, and use "my electricity & gt; Business processing & gt; Or log in to the unified service platform of China Southern Power Grid and click "online business > My Business > business processing" to submit the business application.
7.

The village committee will write a power electricity application meeting (the electricity fee is cheap), take the ID card and to the local state grid to apply for opening an account, and then go home to buy the wire and wait, the electrician will go to install it, the cost is 1000 yuan (including the meter and the meter box)

1. User's electricity application report or application form

2. The power supply intention agreement signed by both parties before the establishment of the new project

3. Power supply scheme approved by power supply enterprises

4

5

6

Other relevant documents agreed by both parties in advance

{rrrrrrr}

extended data:

Any unit or indivial who needs to install new electricity or increase electricity consumption capacity or change electricity consumption must, in accordance with the provisions of these rules, apply to the electricity business site of the power supply enterprise in advance and go through the formalities. The power supply enterprise shall announce the proceres, systems and charging standards for handling various electricity business in the electricity business place

when applying for new installation or additional power consumption, the user shall provide the power supply enterprise with the approval documents of power consumption project and relevant power consumption data, including the power consumption location, power use, power consumption nature, list of power consumption equipment, power load, security power, power consumption planning, etc., and truthfully fill in the power consumption application form and go through the required proceres according to the format specified by the power supply enterprise

in the project approval stage of a new power receiving project, the user should contact the power supply enterprise to reach an intentional agreement on the possibility of power supply, power consumption capacity and power supply conditions of the project before locating and determining the project

8.

According to the power supply business rules, the necessary proceres are as follows:

Article 16 Any unit or indivial who needs to install new electricity or increase electricity consumption capacity or change electricity consumption must, in accordance with the provisions of these rules, apply to the power supply enterprise's electricity business place in advance and go through the proceres

power supply enterprises should announce the proceres, systems and charging standards for various electricity business in the electricity business places

Article 17 the electricity using business organizations of power supply enterprises are responsible for the centralized handling of the electricity application and installation and connection work of users, including the issuance and examination of electricity application, the investigation of power supply conditions, the determination and reply of power supply scheme, the collection of relevant fees, the examination of power receiving engineering design, the intermediate inspection of construction, the completion inspection, the signing of power supply and consumption contract (agreement), and the acceptance of power supply and consumption contract (agreement) Installation of meters and power supply

Article 18 when applying for new installation or additional power consumption, the user shall provide the power supply enterprise with the approval documents of power consumption project and relevant power consumption data, including the power consumption location, power use, power consumption nature, list of power consumption equipment, power load, security power, power consumption planning, etc., and truthfully fill in the power consumption application form and go through the required proceres according to the format specified by the power supply enterprise

Article 92 before formal power supply, the power supply enterprise and the user shall sign a power supply contract according to the power demand of the user, the power supply capacity of the power supply enterprise and the following documents that have been recognized or agreed upon by both parties when handling the power application:

1

2. The power supply intention agreement signed by both parties before the establishment of the new project

3. Power supply scheme approved by power supply enterprises

4

5

6

Other relevant documents agreed by both parties in advance

for users with large power consumption or special requirements for power supply, when signing the power supply contract, they can sign the electricity fee settlement agreement and power dispatching agreement separately

9.

1. Take the ID card, house property card and other relevant documents of the residents to the business hall of the power station

2. For details, please consult the relevant personnel in the business hall

3. After the power supply company accepts the application for electricity, it will send personnel to inspect the site. If the installation conditions are met, it will specify the installation location and inform the user to pay the fee. After the user has paid all the expenses to the power supply department, the staff of the power supply company will install the meter and connect the power on the door, and the reply period and installation period of the power supply scheme shall not exceed the promised time limit

< H2 > extended data

the three-phase line voltage of low-voltage power supply lines in China is 380V, while the phase voltage to ground (neutral line, also known as zero line) is 220V. When using phase voltage power supply, if the zero line is missing, the grounding wire of the equipment can be used as the zero line, but the good grounding should be ensured (generally, except for three-phase four wire power supply, the equipment is equipped with grounding wire)

no matter N line or PE line, repeat grounding should be adopted at the user side to improve the reliability. However, repeated grounding is only repeated grounding. It can only be connected at or near the grounding point, but it can never be connected at any position, especially indoors

10. Local policy, generally can apply for agricultural electricity minimum standard charge. 1、 Electricity for agricultural irrigation and operation of water conservancy facilities: those who pump water or lift water for the purpose of irrigating crops or operating various agricultural water conservancy facilities, and have completed the water right registration, obtained the water right certificate, temporary water use license, or have been certified by the water conservancy authority to be exempted from water right registration according to law. 2、 Power consumption for crop cultivation and post harvest treatment: power consumption for machinery of crop sowing, seedling raising and cultivation management, or drying, threshing, washing, grading and packaging of various agricultural procts, or power consumption for light and temperature regulation for facility horticulture, which has been approved and issued by the competent authority of the Municipality directly under the central government or county (city) concerned, or the certificate for the use of agricultural machinery< (3) electricity consumption for agricultural procts refrigeration and grain storage: the electricity consumption for farmers' groups and wholesale markets for agricultural procts refrigeration, or for farmers' groups storage of public grain, rice and miscellaneous grain, or for rice milling machinery, and has been approved and issued by the municipal, county (city) competent authorities or the grain competent authorities< (4) electricity for aquaculture: the machinery for storage, freezing, mixing, feeding and net washing of feed raw materials on shore for marine aquaculture, and those with fishery right license or fishing right certificate. Water quality improvement equipment such as water pumping, drainage, pumping, greenhouse heating, circulating water, feed material storage, freezing, mixing and feeding machinery required for land-based aquaculture, and licensed for aquaculture. 5、 Livestock electricity: electricity for raising livestock, poultry, pollution prevention and control facilities, egg washing, grading packaging, or machinery in milk collection station, and with the certificate issued by the municipal or county (city) competent authority.
Hot content
Inn digger Publish: 2021-05-29 20:04:36 Views: 341
Purchase of virtual currency in trust contract dispute Publish: 2021-05-29 20:04:33 Views: 942
Blockchain trust machine Publish: 2021-05-29 20:04:26 Views: 720
Brief introduction of ant mine Publish: 2021-05-29 20:04:25 Views: 848
Will digital currency open in November Publish: 2021-05-29 19:56:16 Views: 861
Global digital currency asset exchange Publish: 2021-05-29 19:54:29 Views: 603
Mining chip machine S11 Publish: 2021-05-29 19:54:26 Views: 945
Ethereum algorithm Sha3 Publish: 2021-05-29 19:52:40 Views: 643
Talking about blockchain is not reliable Publish: 2021-05-29 19:52:26 Views: 754
Mining machine node query Publish: 2021-05-29 19:36:37 Views: 750