Self built hydropower station mining
You can't dig in a day. It takes 2000 years
the global unified computing difficulty of bitcoin is 2621404453 (expected to change in two days). It takes more than 2000 years for a 2.5GHz CPU to work out a bitcoin
in order to make the graphics card fully loaded for a long time, the power consumption will be quite high, and the electricity bill will be higher and higher. Many professional mines at home and abroad are operated in areas with extremely low electricity charges, such as hydropower stations, while more users can only mine at home or in ordinary mines, so the electricity charges are not cheap. Even in a certain residential area in Yunnan, there was a case of crazy mining, which led to a large area trip of the residential area, and the transformer was burned
extended data:
bitcoin network generates new bitcoin through "mining". In essence, the so-called "mining" is to use computers to solve a complex mathematical problem to ensure the consistency of bitcoin network distributed accounting system
bitcoin network will automatically adjust the difficulty of mathematical problems, so that the whole network can get a qualified answer about every 10 minutes. Then bitcoin network will generate a certain amount of bitcoin as block reward to reward the person who gets the answer
when bitcoin was born in 2009, block rewards were 50 bitcoins. Ten minutes after its birth, the first 50 bitcoins were generated, and the total amount of money at this time is 50. Then bitcoin grew at a rate of about 50 every 10 minutes. When the total amount reaches 10.5 million (50% of 21 million), the block reward will be halved to 25
when the total amount reaches 15.75 million (5.25 million new output, i.e. 50% of 1050), the block reward will be further halved to 12.5. The monetary system used to have no more than 10.5 million in four years, after which the total number will be permanently limited to about 21 million
Just into the mining area, it is recommended not to look for mining software, because most of the mining software, after all, is still more pit, such as pumping problems or more. Ordinary mining software is mainly to configure some of the pool and wallet address, once the configuration error on the white mining, a great risk
I tried all the mining software on the market, and then I chose the mining mode of ha Yu miner + video card miner to mine, and the effect was good! The cost of learning is also very low
AC can be easily increased or decreased by transformer, so as to realize long-distance transmission, and the rated voltage of electrical equipment with different power can be adjusted. This is an advantage of AC. power line can be connected with electrical equipment to realize power transmission. But wire resistance, current through heating, this heat is useless, nothing is wasted. In the transmission of electric energy, how to rece the energy loss is studied, so as to effectively use the power resistance
line, now it's me, so the power line loss is p = the total length of I2R line. Design L, the cross-sectional area s of the conctor, knowing that the starting resistance R = P L / s
the actual transmission power method, considering various factors, selects cross transmission voltage and conctor cross-sectional area according to different situations. Large generators proce voltages of 1500 V, 13800 V, 15750 V and 18000 V, which cannot be transmitted directly. In the power station, step-up transformer is needed to boost the power supply, and then it is transmitted to the remote. China's long-distance transmission uses voltage of 110000V, 220000v and 33000v, and voltage supply of 500000 V has been adopted in some areas. The highest test transmission voltage in the world is now 1.15 million volts. Voltage
long distance transmission is very high, and the direct application of electrical equipment, so the power area, as you said, according to different users, establish county-level substation, such as 220kV, 110KV, 35kV, 10kV substation, rece the voltage step by step, and the voltage drops to 10000 V, and send it to the power station that needs high voltage, and the voltage drops to low voltage of 220 / 380 V, for general users, such as families Schools, shops, organs, enterprises and institutions
with the construction and development of urban and rural areas, the distribution network for China's power consumption is increasing rapidly, and the task of 10kV power supply is becoming more and more important. In order to ensure 10kV power supply and distribution network with increased safety, economic and reliable operation, China has launched a matching power planning and practical design experience, For example, the design code of power supply system and technical specification for design of 10kV substation and 66kV and below overhead power lines, design specification for overhead distribution lines, design specification for insulation on overhead distribution lines, design specification for power engineering, 3 ~ 110kV High voltage cables, are included in the design code for rural power network planning and design as urban power grid planning and design guide and urban planning standard Code for design of power distribution devices "code for design of relay protection and automatic devices", "code for design of electrical measurement and energy metering devices" and "Atlas 10kV and below power distribution line project" Atlas 10kV and below power distribution equipment project "of" 10kV and below atlas ". Friends who are interested in consulting county power professionals can also borrow books from them.
With the development of society, our life is getting better and better, and our way of life has changed a lot. Now we have digital RMB. What is the significance of accelerating digital RMB? In my opinion, first, it can facilitate people's lives. Second, it can rece some unnecessary economic losses. In addition, it can track the flow of funds and prevent some crimes. Next, I'll give you a specific explanation
Digital RMB can also stop crime. Although our society is very harmonious now, there are some criminal acts behind it, such as swindlers or other criminal acts. However, with digital RMB, we can track the whereabouts of the money, so as to catch these criminals and compensate for our money losses. In addition, in the era of digital RMB, some economic crimes, such as manipulating a large number of currencies and manipulating the market, can be found and stopped quickly. To sum up, with the development of society, our life is more and more convenient. By implementing digital RMB, we can make our life more convenient, make our travel more convenient and avoid some losses. In addition, we can also rece unnecessary economic losses, such as some economic crimes, and find and stop them in time through digital RMB, so as to maintain social harmony and avoid major economic lossesGuanlin scenic spot
walk about 1.1 km to Guanlin intersection station of Longmen Avenue
the scenic spot is located in the middle of the mountain
take bus No.81 / K81, pass 17 stops, and reach Luoyang station
walk about 200 meters to Luoyang station
Luoyang station
Private and private nature can only build small power stations. And meet the conditions
small hydropower stations are under the centralized management of rural hydropower and Electrification Development Bureau under the Water Conservancy Bureau
2. Materials to be provided:
① application form
② submit the project proposal prepared by the corresponding qualified unit. As the basis for the examination and approval of hydropower development and construction projects, according to Article 19 of the water law that "the construction of water projects must comply with the comprehensive river basin planning", the water administrative department or the river basin management organization shall review the reported data according to the approved comprehensive river basin planning, and issue the "consent for comprehensive river basin planning" if it meets the planning requirements And if the water administrative department considers it necessary to modify the plan, it must submit it to the original approval authority for approval according to the prescribed compilation proceres before it can give the "consent for comprehensive river basin planning". After passing the examination, in order to facilitate the preliminary work of hydropower development project, the approval of hydropower resources development license or hydropower resources development use certificate will be given< (2) application for flood control planning consent of hydropower station construction project
after obtaining the approval of water resources development permission, the owner of hydropower station construction should apply for "flood control planning consent" at the local water administrative department's comprehensive basin planning or basin management organization< (3) water intake permit processing
1. Materials submitted for approval of water resources demonstration report of construction project:
1. Application conditions for approval of water resources demonstration report of construction project< (2) commission contract for water resources demonstration of construction project
③ 15 copies of "water resources demonstration report of construction project" prepared by qualified units entrusted by the owner of construction project
2. Approval of water intake permit
1. Application for water intake permit
2. Relevant explanation of the interest relationship with the third party, as well as the letter of commitment and relevant documents of the third party
③ water resources demonstration report of construction project and review opinions
4. If it is a record item, relevant record materials shall be provided< (5) other materials required by the water administration department of the State Council< (4) approval of hydropower construction project approval
after completing the above relevant proceres, the owner of hydropower construction should entrust a qualified unit to prepare the feasibility study report, and submit the prepared feasibility study report and the approval materials of other relevant departments to the national development and Reform Commission for approval< (5) approval of preliminary design documents for hydropower construction projects
after the completion of the project approval, the hydropower construction instry mainly entrusts the units with corresponding qualifications to prepare the preliminary design documents for hydropower construction projects, and submit them to the corresponding water administrative departments for approval according to the prescribed authority. When preparing the preliminary design documents for hydropower construction projects, the corresponding qualified units shall reflect the relevant contents of the approved consent for comprehensive river basin planning, consent for flood control planning and water resources demonstration report, and prepare the chapters of environmental protection (including the contents of water and soil conservation) in accordance with the requirements of environmental protection design specifications and technical standards for water and soil conservation, According to the approved environmental impact report and water and soil conservation plan of the construction project, the investment budget of prevention and control of environmental pollution and soil erosion, ecological damage measures and environmental protection facilities shall be implemented in the chapter of environmental protection
prior to approval, the preliminary design documents of hydropower construction projects generally require the construction owner to entrust a qualified engineering consulting organization or organize experts from all aspects of the instry (including management, preparation, consultation, etc.) to conct consultation and demonstration on major issues in the preliminary design documents. The compilation unit shall supplement, modify and optimize the preliminary design documents according to the consultation and demonstration opinions. After the review organized by the owner, it shall be submitted to the corresponding water administrative department for approval according to the prescribed authority
the design unit must strictly guarantee the design quality and bear the contract responsibility for the preliminary design. After the approval of the preliminary design documents, the main contents shall not be modified or changed at will, and shall be used as the basis of the technical documents for the construction and implementation of the project. In case of any important modification or alteration, it shall be reviewed and approved by the original examination and approval authority< (6) approval for commencement of hydropower station construction project
after the completion of preliminary design approval, the construction project enters the construction preparation stage. The hydropower construction instry should pay close attention to the preparatory work before the commencement of the project. Before the commencement of the main project, the construction preparation work must be completed. The main contents include: 1. Land acquisition and demolition of the construction site; 2
2. Complete construction water, electricity, communication, road and site leveling, etc
3. Necessary temporary construction projects for proction and living
4. Organize bidding design, consultation, equipment and material procurement and other services
5. Organize the construction supervision and the bidding of the main project, and select the construction supervision unit and the construction contract team
6. Go through the project quality supervision proceres according to the relevant national regulations
7. Coordinate with relevant units and indivials, and sign a coordination agreement
after completing the above work, in accordance with item 173 of the decision of the State Council on the establishment of administrative license for administrative examination and approval projects that really need to be retained (Order No. 412 of the State Council), the Interim Provisions on the management of water conservancy project construction proceres (Document No. 16 [1998] of the Ministry of water resources) and the relevant provisions of the regulations on the quality management of construction projects, Before the commencement of the main project, the construction owner shall apply to the water administration department for commencement (the approval documents of the construction project must be submitted for approval before the commencement of the project). The main project can be officially started only after it is approved and listed in the construction investment plan< (7) construction and implementation stage of hydropower station project
after the approval of commencement, the construction and implementation stage refers to the construction and implementation of the main project, and the project legal person organizes the project construction according to the approved construction documents to ensure the realization of the project construction objectives
according to Article 6 of regulations on quality management of water conservancy projects, the quality management system of combining project legal person (construction unit) responsibility, supervision unit control, construction unit guarantee and government supervision is implemented for water conservancy project quality. Therefore, in the implementation stage of hydropower construction project, the following work should be supervised and done well:
1. Construction project division of hydropower station, construction project division, construction project division of hydropower station Stage acceptance
according to the relevant provisions of the regulations on quality management of construction projects, the regulations on acceptance of water conservancy and hydropower construction projects and the regulations on acceptance of small hydropower station construction projects, the acceptance work belongs to the scope of government management, and the water administrative departments at all levels and the owner's departments of small hydropower projects are the departments that manage the acceptance work on behalf of the government, And according to the hierarchical management authority, respectively manage the acceptance work. The owner, construction, design, construction, construction supervision, quality supervision, scientific research, equipment manufacturing, operation management and other units are responsible for providing acceptance data and relevant reports. The owner may entrust the construction unit or the construction supervision unit to collect and print the acceptance data and reports
the data of divisional and stage acceptance are related to whether the project has passed the completion acceptance, so valid visa materials are needed. These original documents should be kept by the project legal person at least 5 copies, and sent to relevant units after the completion acceptance
(1) acceptance of divisional works of hydropower station:
divisional works inspection means that all unit works of the divisional works have been completed and the quality is all qualified, and can be accepted
the acceptance of divisional works is in the charge of the acceptance working group, which is presided over by the project legal person or the supervisor, organizes relevant professional and technical personnel of the design, construction and operation management units to carry out the acceptance, and the water administration department sends personnel to participate
the main tasks of acceptance of divisional projects are: 1) to identify whether the project meets the design standards; ② According to the current national or instrial technical standards, evaluate the engineering quality level; ③ Put forward handling suggestions for the remaining problems in the acceptance; ④ The drawings, data and results of the acceptance of divisional works are part of the completion acceptance data, which must be prepared according to the completion acceptance standards; ⑤ The result of acceptance of divisional works is "acceptance visa of divisional works"
(2) stage acceptance of hydropower station construction project:
according to the needs of project construction, stage acceptance shall be carried out when the project construction reaches a certain critical stage (such as foundation treatment, important concealed works, river closure, reservoir storage, unit start-up, water supply project, etc.)
the main tasks of stage acceptance are: (1) check the quality and image of the completed project; ② Check the construction of projects under construction; ③ Check the planning and arrangement of the project to be built, the implementation of the main technical measures, and whether the construction conditions are met; ④ Check whether the project to be put into use has the operation conditions; ⑤ Put forward the handling requirements for the remaining problems in the acceptance
the result of stage acceptance is "stage acceptance appraisal certificate". After the appraisal certificate is passed, the acceptance host unit will send the document to the relevant units
① acceptance before river closure of hydropower station construction project
acceptance before river closure shall be concted before river closure. The main work of acceptance before river closure is to inspect the construction of completed underwater works, concealed works and diversion and river closure works, and to identify the quality of the works; Review the closure scheme, check the implementation of closure measures and preparations; Check the situation of land acquisition, resettlement and bottom clearance, as well as the implementation of temporary measures taken to solve problems such as navigation obstruction; Study the other problems found in the acceptance and put forward the treatment requirements
the acceptance before river closure is presided over by the project legal person and attended by personnel from the departments in charge of design, construction, supervision, quality supervision, operation management and water administration
② water storage acceptance of hydropower station construction project:
water storage acceptance must be carried out before water storage of hydropower station project. Before acceptance, the water storage safety of the project shall be appraised in accordance with relevant regulations
according to the relevant provisions of the regulations on the safety management of reservoir dams and the measures for the safety appraisal of reservoir dams, for a reservoir dam with a dam height of more than 15 meters or a reservoir capacity of more than 1 million cubic meters (including permanent water retaining structures and flood discharge, water conveyance and ship passing structures that are used with them), or a dam height of less than 15 meters, more than 10 meters or a reservoir capacity of less than 1 million cubic meters For dams with more than 100000 cubic meters, which are potentially dangerous to the safety of important towns, traffic trunk lines, important military facilities, instrial and mining areas, the safety assessment of water storage should be carried out before water storage
the main work of impoundment acceptance is to check the construction of completed projects and identify the project quality; Review the water storage plan, check the implementation of water storage measures and preparations; Check the clearance of the reservoir area, land acquisition for construction and resettlement of immigrants; Study the problems found in the acceptance, especially the problems affecting the safety of the water storage project, and put forward the treatment requirements; Determine the project that can be handed over
the acceptance of water storage is jointly presided over by the project legal person and the water administration department, and the design, construction, supervision, quality supervision and operation management units send personnel to participate
before the construction project of hydropower station has passed the water storage acceptance, it is absolutely not allowed to store water without authorization
③ unit start-up acceptance of hydropower station construction project
before each unit of hydropower station is put into operation, unit start-up acceptance should be carried out
unit startup acceptance