Position: Home page » Equipment » GDS photon chain mining cheated

GDS photon chain mining cheated

Publish: 2021-04-09 22:18:35
1. First of all, it is necessary to identify whether this is a money digging application, then understand its operation mode, and finally determine whether it can play.
2.

1 Division of mining units of ore deposits generally, ore deposits occupy a large area and have abundant reserves. In order to develop in a planned way, the ore deposits are often divided into several parts (mining units) from large to small according to the occurrence conditions of ore bodies, and are classified into corresponding mining enterprises (proction units) for mining

generally, the distribution range of ore deposits is called mining area, which is usually classified as a Mining Bureau (or company). All deposits in the same geological structure and of the same origin are called ore fields (coal mines are called coalfields). If the mine field is large in scale, it can be divided into several parts, each part is mined by a mine (pit mouth), which is called mine field (Figure 12-1). The boundary of mine field can be artificial boundary or natural boundary. During mining, the mine field must be divided into smaller parts. For inclined seam, the seam is usually divided into several long sections parallel to the strike according to a certain elevation along its inclined direction, which is called stage (or middle section), and the upper and lower interface is called horizontal, such as 0m level and - 50m level (Fig. 12-2). When the stage is small, the mining can be carried out at one time along the whole stage; If the stage area is large, it should be further divided into n mining areas, each mining area along the inclined layout of n mining faces, called section

Fig. 12-8 schematic diagram of roof failure zoning

(according to Beijing Academy of Coal Sciences, 1985)

a-irregular caving; B - rule falling; C-serious fracture; D-general cracking; E - tiny crack; F - caving zone; G-fracture zone; H-overall moving zone; I-fracture zone

1) caving zone: the area where the direct roof splits into pieces and collapses downward. It can be divided into irregular caving section and regular caving section. The rocks in this area are broken and expanded, accumulated and permeable, which can form a channel for the upper groundwater or surface water to pour downward, causing water inrush. Generally, this area is not allowed to develop into the upper strong aquifer or surface water

2) fracture zone: a large number of mining fractures with cut and separated layers appear above the caving zone. The zone can be divided into three sections: serious fracture section, general fracture section and micro fracture section. When the zone reaches the supply water source, the mine water inflow will increase sharply, even cause water inrush

3) overall movement zone of rock stratum: the zone is located above the fracture zone, which is generally characterized by the overall bending deformation or shear displacement of the stratum, or the overall bending and falling in the zone. Generally, there is no fracture and it does not form a water filling channel

3. The price of a small excavator is about tens of thousands of yuan per unit, and the cheaper one is 10000 yuan or 20000 yuan. Different types of small excavators have different prices. In terms of category, development design: apply mature design experience or feasible new technology to design new small excavator, mainly including function design and mechanism design. Upgrade design: according to the use experience and technical development of the existing small excavator design upgrade, in order to improve performance, rece manufacturing costs or rece operating costs. Derivative design: in order to meet the new needs, some modifications or additions or deletions are made to the existing small excavators, so as to develop derivative procts different from the standard ones. Series design: Based on a small excavator, a series of procts with the same function and similar appearance but different power, tonnage and size are designed. Want to know more about the small excavator information and price, can consult Suzhou Zhijia Construction Machinery Co., Ltd., thank you!
4. Movie moon
5. Give up
6. At present, the blockchain has not been recognized by everyone. I suggest you not to be so impulsive!
7. Mining needs the approval of land and resources authorities
it is illegal for you to go mining
so you must have been cheated.
8. Photon chain is a scam, many people lose everything
Hot content
Inn digger Publish: 2021-05-29 20:04:36 Views: 341
Purchase of virtual currency in trust contract dispute Publish: 2021-05-29 20:04:33 Views: 942
Blockchain trust machine Publish: 2021-05-29 20:04:26 Views: 720
Brief introduction of ant mine Publish: 2021-05-29 20:04:25 Views: 848
Will digital currency open in November Publish: 2021-05-29 19:56:16 Views: 861
Global digital currency asset exchange Publish: 2021-05-29 19:54:29 Views: 603
Mining chip machine S11 Publish: 2021-05-29 19:54:26 Views: 945
Ethereum algorithm Sha3 Publish: 2021-05-29 19:52:40 Views: 643
Talking about blockchain is not reliable Publish: 2021-05-29 19:52:26 Views: 754
Mining machine node query Publish: 2021-05-29 19:36:37 Views: 750