Procedures for mining and excavation of mine sand and stone

Publish: 2021-04-17 20:49:50
1. Hello,
for sand mining in inland river, it is necessary to obtain the "permit for sand mining in inland river", and the data to be submitted generally include the following contents:
1. Application form for river excavation permit (attached with topographic map of current river course within the scope of application operation)< 2. Copy of ID card or business license
3. Construction scheme of mining and excavation operation (mining and excavation operation scope, mode, planned total amount of mining and excavation, sand stacking site, transportation scheme, river section control measures, etc.)
4. Relevant information of sand mining tools (inspection certificate of sand mining vessel and sand transport vessel, etc.)
the charging standard is determined according to the local conditions and is generally not charged.
2. Sand and stone mining needs to go through the mining proceres in the mineral branch of the Bureau of land and resources. The cost varies greatly in different regions, and some regions are not allowed to mine no matter how much money they spend. You can ask the local department
3.

Mining requires the following certificates:

1. Mine proction license (original and plicate)

2. Mine safety proction license (original and plicate)

3. Mining license of the people's Republic of China (original and plicate)

4. Mine manager's safety proction license

5. Mine manager's qualification certificate

6. Business license (original and plicate)

4 Copy)

7. Environmental protection certificate

is based on the following laws and regulations:

proction safety law, mine safety law, XX (your province) province implementation (mine safety law of the people's Republic of China) measures

{rrrrrrr}


extended data

mining methods and classification

mining methods are mainly divided into two modes, one is open-pit mining, the other is underground mining

There are two modes:

full boundary mining method, steep slope mining method, caving method, filling method, open stoping method, etc.

generally speaking, if the boundary stripping ratio is less than or equal to the economic and reasonable stripping ratio, open-pit mining can be adopted, otherwise underground mining method will be adopted

scale

mines include coal mine, metal mine, non-metal mine, building material mine, chemical mine and so on. Mine scale (also known as proction capacity) is usually expressed as annual output or daily output. Annual output is the amount of ore proced by the mine each year

According to the yield, it can be divided into three types: large, medium and small. The scale of the mine should be adapted to the economic and reasonable service life of the mine. Only in this way can the capital construction cost be saved and the cost be reced

in the process of mine proction, the mining operation not only consumes the most manpower and material resources, occupies the most funds, but also has the greatest potential to rece the mining cost. The main way to rece mining cost is to improve labor proctivity and proct quality and rece material consumption

You know what it is

mining needs certain technical content and methods

4. Like metal mines, sand and stone belong to mineral resources, which are owned by the state according to national laws. It is a complex process to set up a sand and gravel plant, but it is not that private mining can not be carried out. It needs to go through certain proceres:
1. It needs to be verified by the instrial and commercial department. As a gravel plant, gravel plant must have the business license and tax registration certificate of the state instrial and commercial department, which is also the certificate of any enterprise. It is necessary to submit the project name, operation period, total investment, registered capital, application form, etc
2. The Bureau of land and resources handles the mining license. Mineral resources belong to national assets. To set up a sand and gravel plant, it is necessary to apply to the state or local municipal land administration bureau for a mining right license, an official reply from the mining sector, a report on the examination and approval of reserves, and an official reply to the preliminary exploitation and utilization plan. Then, the corresponding inspectors carry out mineral resources examination, environmental impact assessment, and risk assessment, and can start operation after passing the examination and approval
3. For the quarry that seriously endangers people's life and seriously pollutes the environment, the Department of land and resources fails to pass the examination. For the quarry that passes the examination, the scope of operation such as quarry, quarry and gravel yard will be delimited, and the operation can only be carried out after a permit is issued, otherwise it is illegal mining
4. If it is personal mining, you also need to submit your personal ID card to the instry and Commerce Bureau to apply for pre-approval notice.
5.

It is the key point to set up sand and stone proction line to apply for the formalities and certificates of quarries. Only by ensuring the legal proction, it is possible to avoid the situation of forced closure or fines in the later period. As long as the relevant documents of the company or indivial are complete, it is not difficult to go through the sand making proceres, and the cost is not expensive.

< H2 > 1. The instrial and commercial department applies for the name and reviews it: < H2 >

the enterprise needs to bring the information form obtained by the instrial and commercial bureau, and the shareholder signs it, and the indivial can apply for it with the ID card

< H2 > 2. The Bureau of land and resources handles the mining license:

it is very important that the Bureau of land and resources handles the mining license to specify the mining scope and raw materials

< H2 > 3. Inspection by environmental supervision department:

before the stone processing and crushing proction, the environmental supervision department shall carry out the evaluation link and give relevant certificates

< H2 > 4. Approval of safety management department:

the sand proction line should ensure safe proction, and the security department should check the potential safety hazards according to the surrounding environment of the proction line

< H2 > 5. Business license of instry and Commerce Bureau:

first approve the name, then submit the name, geology, person in charge, amount of funds, business scope, business mode, number of employees, economic method and other related resources, and finally obtain the legal business license

< H2 > 6. Tax registration certificate:

both indivials and enterprises have tax liability. After the company completes the registration, it needs to provide accounting information. One month after its establishment, the accountant needs to keep accounts and declare tax

the above introces the proceres and certificates required for running a quarry. If the above answers are useful to you, please encourage me to praise me so that I can help more people. Thank you

6. To go to the forestry bureau to apply for mining license, but also to apply for an enterprise license.
7.

Random mining of river sand will affect the environment, but the demand for sand and stone is large, and the application range is wide. Making sand instead of natural sand is the general trend. The raw materials of machine-made sand are rich. Ores, tailings, construction waste, etc. can be processed into machine-made sand, and the sand making process is convenient

< H2 > I. legal proceres of sand and gravel plant:

1. Name verification by instrial and commercial department

2. Mining license issued by land and Resources Bureau

3. Approval by Safety Administration Bureau

< P > 4. Evaluation by Environmental Protection Bureau

5. Business license proceres handled by instrial and commercial department

6. Tax registration certificate issued by tax department

If ore resources are to be mined, relevant proceres must be handled. However, there are still many investors walking on thin ice, because they are worried that if the environmental assessment is not up to the standard, the proction proceres will not be completed if the environmental assessment is not passed, and many people are stuck in the environmental protection when they go through the proceres. Therefore, it is the key to invest in sand proction and pass the environmental assessment proceres

Second, the procere of environmental impact assessment for manufactured sand is as follows:

1. Project approval: firstly, prepare the sand making project documents and file them with the local economic development bureau

2. EIA: go to the local environmental protection bureau for environmental assessment after filing

3. The cost of signing the contract depends on the amount of investment

4. For the on-site assessment of environmental protection agencies, the EIA contents include materials, project equipment, materials and auxiliary materials, and the monitoring of surrounding environment (air, noise, odor concentration, etc.). Generally, the frequency of EIA testing is 4 times a day, a total of 7 days, and the enterprises also need to carry out household survey on surrounding residents or units

5. After getting the household questionnaire, the EIA agency will go to the surrounding residents and units to carry out household survey

6. After the investigation, the project was put into operation and applied for environmental protection acceptance

The conventional sand proction line process mainly includes: feeding, crushing, sand making, screening, sand washing, etc. the equipment includes vibrating feeder, crusher, sand making machine, circular vibrating screen, sand washing machine. The proction models of the equipment are different. The specific proction line equipment can be combined according to their own proction needs, site and other actual conditions, We must choose reliable manufacturers, design environmental protection, reasonable and efficient sand proction line by professionals, and reasonably match the full set of equipment

8.

1、 The first step is to go to the instrial and commercial department to check the name, which is the premise of subsequent business registration. The first step is to have a good name before opening a sand and stone factory, which can be officially put into use only after being approved by the instrial and commercial bureau, so as to avoid the same or similar names in the same instry

2. To apply for mining license in the Bureau of land and resources

sand and stone resources belong to non coal mine resources. To set up a sand and stone factory, it is necessary to apply for mining right license, mining sector approval, reserves verification approval report, preliminary mining and utilization plan approval from the local municipal bureau of land administration, and then the corresponding inspectors carry out mineral resources verification, environmental impact assessment and risk assessment, In the case of qualified audit can start to operate

3. Approval of safety administration and evaluation of Environmental Protection Bureau. If it passes the examination, it will delimit the operation scope of quarry, gravel plant, gravel yard, etc., and the operation can only be carried out after the license is issued, otherwise it will be illegal mining. The land and resources department has the right to examine and verify the quarries that seriously endanger people's lives and cause serious environmental pollution

4. To apply for a business license from the instrial and commercial department, it is necessary to have a business license and tax registration certificate issued by the local instrial and commercial department, which clearly shows the name, operation period, total investment, registered capital and business scope of the gravel plant; In addition, the legal person of the sand and gravel plant needs to have the "non coal mine safety technology business qualification certificate"

5. Other required certificates

according to the different processing materials, other certificates may also be involved in the operation of sand and gravel plant, such as mining river sand, which needs the approval of the river management department; The exploitation of rocks for the occupation of shelterbelts requires the approval of the forestry department. According to the reply of a county government to the public: the land area is less than 2 hectares, which shall be examined and approved by the county forestry administrative department. Other exceeding limits of authority shall be examined and approved by the forestry administrative departments of the state, province and prefecture

Second, the approval time of relevant certificates will be suspended or delayed unless affected by environmental protection and relevant policies. Under normal circumstances, as long as the application materials for certificates are complete, the time limit for the administrative examination and approval of each kind of certificate is usually within one month. If it is successful, all certificates will not be issued for more than one year

extended data:

special environmental treatment of sand and gravel yard promotes clean air action

organize environmental protection, land and resources and water conservancy departments to carry out special environmental comprehensive treatment of sand and gravel yard under their jurisdiction, formulate treatment plan and clarify treatment key points and measures by holding centralized treatment work arrangement and deployment meeting of sand and gravel yard, Enterprises are required to carry out bid raising and treatment projects in accordance with relevant requirements

all the materials in the stockyard should be fully covered, the sand and stone materials stacked in the green isolation belt should be cleared, the st removal and sprinkler devices should be installed in the loading, unloading and transmission processes and links, and the clean air action should be promoted in an all-round way to continuously improve the ecological environment quality

9.

The premise of procing machine-made sand is to establish a reasonable sand making plant. Sand and stone belong to mineral resources as well as metal mines, which are owned by the state according to national laws. Generally, there are certain proceres for mining ores, and the specific proceres are as follows:

< H2 > 1. The instrial and commercial department should verify and register the establishment of a regular sand making plant, which must go through the national instrial and commercial department to handle the business license and tax registration certificate, and provide the relevant information such as the certificate, registration cost, operation period, project name and application form for the establishment of a sand making plant

< H2 > 2. The Bureau of land and resources has approved and issued a mining license

because the mineral resources are owned by the state, if we want to mine ore, we need to apply for a mining license from the state or local land bureau

In recent years, the state attaches great importance to environmental protection, and the supervision of environmental protection is very strict all over the country. Therefore, the establishment of sand making plant must be approved by the State Administration of safety, and also through the environmental protection assessment of the Environmental Protection Bureau. Here, we suggest that when purchasing sand making equipment, we must consider the environmental protection of the equipment, whether to configure st removal equipment or sewage treatment equipment, etc

< H2 > 4. The tax department issues the tax registration certificate

10.

Random mining of river sand will affect the environment, but the demand for sand and stone is large, and the application range is wide. Making sand instead of natural sand is the general trend. The raw materials of machine-made sand are rich. Ores, tailings, construction waste, etc. can be processed into machine-made sand, and the sand making process is convenient. The following proceres are required to set up a sand and gravel plant: 1. Legal proceres for manufactured sand: 1. Name verification by instrial and commercial department; 2. Mining license issued by land and Resources Bureau; 3. Approval by Safety Administration Bureau; 4. Evaluation by Environmental Protection Bureau; 5. Business license processing by instrial and commercial department; 6. Tax registration certificate issued by tax department, Be sure to go through the relevant proceres. However, there are still many investors walking on thin ice, because they are worried that if the environmental assessment is not up to the standard, the proction proceres will not be completed if the environmental assessment is not passed, and many people are stuck in the environmental protection when they go through the proceres. Therefore, it is the key to invest in sand proction and pass the environmental assessment proceres

Second, the process of environmental impact assessment for manufactured sand is described as follows: 1. Project approval: firstly, the project documents of sand making are prepared and filed with the local economic development bureau

2. EIA: go to the local environmental protection bureau for environmental assessment after filing

3. The cost of signing the contract depends on the amount of investment

4. For the on-site assessment of environmental protection agencies, the EIA contents include materials, project equipment, materials and auxiliary materials, and the monitoring of surrounding environment (air, noise, odor concentration, etc.). Generally, the frequency of EIA testing is 4 times a day, a total of 7 days, and the enterprises also need to carry out household survey on surrounding residents or units

5. After getting the household questionnaire, the EIA agency will go to the surrounding residents and units to carry out household survey

6. After the investigation, the project was put into operation and applied for environmental protection acceptance

Hot content
Inn digger Publish: 2021-05-29 20:04:36 Views: 341
Purchase of virtual currency in trust contract dispute Publish: 2021-05-29 20:04:33 Views: 942
Blockchain trust machine Publish: 2021-05-29 20:04:26 Views: 720
Brief introduction of ant mine Publish: 2021-05-29 20:04:25 Views: 848
Will digital currency open in November Publish: 2021-05-29 19:56:16 Views: 861
Global digital currency asset exchange Publish: 2021-05-29 19:54:29 Views: 603
Mining chip machine S11 Publish: 2021-05-29 19:54:26 Views: 945
Ethereum algorithm Sha3 Publish: 2021-05-29 19:52:40 Views: 643
Talking about blockchain is not reliable Publish: 2021-05-29 19:52:26 Views: 754
Mining machine node query Publish: 2021-05-29 19:36:37 Views: 750