Position: Home page » Equipment » Mining plan 61

Mining plan 61

Publish: 2021-04-22 05:30:55
1. Crystal mine app is mainly used to view the mining situation, collect crystal, wechat embodiment and remote control of moneymaker. Although the function of this app is relatively simple, the experience is quite good. On the main interface, the information such as receiving crystal, entering the mine, making money treasure's output today, PC miner's output today, hired miner's output today, treasure box's income today can be seen at a glance. After clicking, you can enter different interfaces to view the corresponding information
here, I would like to re mention the "mining plan" function of moneymaker, in which users can set the working mode of 24 hours a day in different periods, such as "full mining" mode to get the maximum profit ring working hours; Choose the "intelligent mining" mode when you go home to avoid mining affecting the online experience; In addition, if you are not satisfied with the "intelligent mining" mode, you can also select "speed limit mining" from the row to set the bandwidth occupied by mining. In the author's actual test, the mining speed in the "full mining" mode can reach about 4Mbps, while in the "intelligent mining" mode, the speed will basically remain at 500kbps, so it will not affect the daily Internet.
2.

Although many investors know nothing about bitcoin mining, they still can't resist the temptation of bitcoin price and plan to invest in the mining army. So if you also want to mine, I believe you will have a question in your heart: "what is a bitcoin miner? What is the principle of bitcoin mining machine? " To solve this problem, let's remember some popular science today

origin of bitcoin

to fully understand the origin of bitcoin, we have to mention the existing financial system

bitcoin mining machine specially used for mining. The popular digital currencies in 2013 include bitcoin, Leyte coin, zeta coin, pennies (Internet), invisible gold bar, red coin, pole coin, BBQ coin and prime currency. At present, hundreds of digital currencies are issued all over the world

with the orderly implementation of cashless society, banknotes will inevitably disappear in the long river of history with the passage of time. The future digital currency is believed to be similar to bitcoin, but it is by no means a limited supply. But when the human ability to proce wealth can be completely matched by the computing power of the computer, the issuing speed of e-money is directly proportional to or slightly exceeds the computing speed of the computer to create moderate inflation. In the future, while mining, it is also creating value rather than wasting electricity. In the end, the small changes in proctivity of digital currency match the difficulty of computing power, which may be the final form of human currency

3.

bitcoin mining machine scam is to make money by leasing or selling mining machines

the so-called "mining machine" refers to the computer that installs and runs specific software and algorithms. As we all know, bitcoin can only be obtained through long-term running algorithm of computer, and the total amount is limited. Therefore, some manufacturers have launched specially designed and optimized computer procts, known as "mining machine"

in January 2018, a mining computer named "Kodak kashminer" appeared at the international consumer electronics exhibition in Las Vegas, which aroused people's attention. But now critics point out that the mining machine plan is actually a fraud, and the publicity for profit is also false

precautions:

1. The general computer configuration of bitcoin household can not meet the requirements of bitcoin miner, so it is difficult to earn the electricity cost of a day

2. If you have to use bitcoin mining machine to dig coins, it is suggested to choose a reliable and legal platform to go more steadily. In the legal platform mining, the daily income can be seen, and a certain amount can be withdrawn

4. 7、 The distribution of quick mining is different every day. It mainly depends on the blockchain. How to allocate it depends on the local profitability today?
5. 1、 The first step is to apply to the land and resources administration department for the scope of mining area
note: the certification authority of sand, stone and clay for ordinary construction is in the county-level land and resources management department; The license issuing authority for mining minerals other than the 34 minerals specified in order 241 of the State Council in 1998 is in the municipal land and resources administration department; The license issuing authority for mining 34 kinds of minerals stipulated in order 241 of the State Council in 1998 is in the provincial land and resources administration department
the materials you need to submit to the management department (a total of 9 items):
1. Reasons for running the mine and brief demonstration
2. Geological report (a geological report prepared by a mining enterprise looking for a geological exploration unit with exploration qualification, which shall be reviewed by experts and put on record by the land and Resources Department)
3. Preliminary plan of mineral resources development and utilization (prepared by technical service department with mining design qualification). It includes the following contents:
the scope, type and location of mineral resources to be applied for mining; Reserves, quality and reliability of mineral resources to be applied for exploitation; The proction scale, service life and comprehensive development and utilization plan of mineral resources of the proposed mine; When the application scope is a part of the whole deposit, the relationship with the whole deposit and the connection with the overall development of the mining area should be explained
4. Mine construction investment arrangement and fund source (including bank credit certificate)
5. Other problems that need to be explained
6. Certification documents after the name of the enterprise has been approved by the administrative department for Instry and Commerce (gtzf [1998] No. 104)
7. If the exploration right holder applies for mineral exploration, he / she should issue a of the exploration license for the area; If the exploration right is obtained through transfer, approval documents for transfer shall also be issued< (1:2000-5000 topographic and geological map or geological map as base map, calibrated with national rectangular coordinates). The work will be completed by the technical department that gives you the development and utilization plan
(9) preliminary review opinions of district (county) geological and mineral management department (original)
materials submitted for application for extension of exploration right
(1) registration form for application for change, extension and retention of exploration right (original, including written and electronic documents)
(2) block scope map (original) applied for
(3) original exploration license (original version)
(4) geological exploration unit qualification certificate () of the exploration unit that has been inspected annually and is within the validity period
(5) annual report on exploration work (original or )
(6) accounting statement of capital investment of exploration project (original or )
(7) proof of fund source of exploration project (original or )< (1) registration form for application for change of exploration right (original, including written and electronic documents)
(2) block scope map (original) applied for
(3) original exploration license (original version)
(4) geological exploration unit qualification certificate () of the exploration unit that has been inspected annually and is within the validity period< (5) according to the type of change, the following information should be submitted:
if the scope of exploration is expanded or narrowed, the following information should be submitted:
① implementation plan and appendix (original or ) of exploration work
② preliminary review opinions of district (county) geological and mineral management department
if the main mineral type of exploration is changed, the annual report of exploration or periodic report of exploration work shall be submitted< (6) if the exploration right holder changes his name (including the change of legal representative) or his address, he shall submit:
① business license of legal person () of the exploration right applicant< (2) the original applicant's "business license of legal person" () before the change< For the transfer of exploration right, the following documents should be submitted:
A. approval letter for the transfer of exploration right (original) issued by the transfer approval authority
B. business license of legal person () of the applicant for exploration right
C. proof of fund source of exploration project (original or )
D. exploration plan or contract (original or )
E. implementation plan and annex of exploration work (original or )< (1) registration form of application for change, extension and reservation of exploration right (original, including written and electronic documents)
(2) block scope map (original) applied for
(3) original exploration license (original version)< (4) if a reservation is established for the first time, it shall also submit:
① completion report or termination report of exploration project (original or )
2. Accounting statements (original or ) of investment in exploration projects< (1) application for cancellation of exploration right (original, including written and electronic documents)
(2) completion report or termination report (original or ) of exploration project
(3) the supporting documents (original or ) for the collection and submission of the survey project results and materials
(4) original exploration license (original)< 1. Exploration right use fee
the State implements the system of paid acquisition of exploration right. The fee for the use of exploration rights shall be calculated according to the year of exploration and paid year by year
exploration royalty standard: 100 yuan per square kilometer from the first exploration year to the third exploration year; Starting from the fourth exploration year, an annual increase of 100 yuan per square kilometer shall be made, but the maximum shall not exceed 500 yuan per square kilometer per year< 2. Price of exploration right
If an applicant applies for the exploration right of a state funded exploration block with proven ore procing areas, the applicant of the exploration right shall pay not only the fee for the use of the exploration right in accordance with the provisions of Article 12 of the administrative measures for the registration of mineral resources exploration blocks, but also the price of the exploration right formed by the state funded exploration confirmed by evaluation; According to the relevant provisions of the state, the price of exploration right can be paid in one lump sum or by installments
3. Investigation registration fee
charging standard: 50 yuan for each exploration license
the legal basis for the application of exploration right:
1. Mineral resources law of the people's Republic of China< 2. Detailed rules for the implementation of the mineral resources law of the people's Republic of China< 3. Measures for the administration of registration of mineral resources exploration blocks (Order No. 240 of the State Council)
9. Fill in the application for registration of mining area, and the land and resources department at the next level will sign your opinions on the application form. Note: the above work is to be completed by the applicant himself. You must not think it is the work done by the management department!! The information is in quintuplicate. The mining of special minerals must have the approval document of the instry management department
the second step: delimit the scope of mining area
delimiting the scope of mining area is completed by the approval and registration authority (land and resources management department). After the management department receives your report (information), it will issue the notice of delimiting the scope of mining area to you within 40 working days
after the scope of the mining area is delimited, the mining registration authorities at all levels will not accept new mining right applications in the area (at the same time, if there are several applicants in a region, the application shall be handled according to the principle of declaration first)
reserve period of mining area: no more than 3 years for large mines, no more than 2 years for medium mines and no more than 1 year for small mines< The third step: the main work that the applicant should do after the delimitation of the mining area
1. During the reservation period, the mining right applicant should go through the proceres for the establishment of the construction project and the establishment of the enterprise (with the approval of the delimitation of the mining area, apply for the enterprise business license at the instrial and commercial administration department)
2. The development and utilization plan of mineral resources should be prepared and reviewed according to the document [1999] No. 98 issued by the Ministry of land and resources. The development and utilization plan of mineral resources should be reviewed by an expert group organized by the Department of land and resources management, and the confirmation letter of the plan should be issued
3. The applicant of mining right shall inform the mining registration administration of the relevant situation of mine construction and enterprise establishment every six months. If the applicant of mining right fails to go through the mining registration proceres and obtain the mining license within the time limit, it shall be regarded as giving up the application of mining right automatically, and the scope of mining area shall not be reserved, The administrative organ of mining registration may accept applications for other mining rights within the scope of the mining area
4. A qualified geological environment impact assessment institution shall be invited to make the mine geological environment impact assessment report, which shall be submitted to the land and resources management department for expert review and issued a confirmation letter
5. A qualified environmental protection technical service organization shall be invited to make the environmental impact assessment report of construction project, and the report shall be submitted to the environmental protection management department for approval
6. Ask a qualified safety service organization to do the safety pre evaluation, and report to the safety supervision and management department for approval after the completion of the report. 7. The legal evaluation institutions are invited to evaluate the price of mining rights, and the evaluation results are confirmed by the land and resources department (which evaluation institutions can evaluate? Please find them in the "technical service institutions" column of our website; The 34 kinds of minerals stipulated by the State Council Order No. 241 in 1998 shall be reported to the Provincial Department of land and resources for confirmation)
note: if all the above reports are issued by the land and resources department at that level, the land and resources department at that level will organize experts to review and confirm them. If the lower level organ organizes the assessment and confirmation, it shall be entrusted by the higher level organ
the above work is a project to be completed by the applicant himself. You must not think it is the work done by the management department!! The information is in quintuplicate< Step 4: mining registration
according to the administrative measures for mineral resources mining registration and the regulations of Yunnan Province on mining registration, the applicant of mining right shall submit the following information to the registration and administration authority:
1. Application for registration of mining right
2. The mining area based on topographic and geological map or geological map (demarcate the mining area with inflection point, connect it with red line, and attach Cartesian coordinates and mining area)
3. Mineral resources development and utilization plan prepared by qualified design units. It includes the following contents: mine location, topography, landform, reserves, quality and reliability, etc; Technical and economic demonstration and determination scheme of mining area scope, mining type, designed and utilized reserves, mine proction scale, service life, mining mode, mining method, comprehensive development, comprehensive utilization, etc. The evaluation opinions of the expert group and the identification documents of the land and resources administration department are attached
4. Business license ()
5. Have the supporting materials of capital, technology and equipment suitable for the scale of mine construction
6. Expert review opinions of mine geological environment impact assessment report and confirmation letter of land and resources management department
7. Environmental impact assessment report of construction project and identification documents of environmental protection management department
8. Safety pre evaluation and identification documents of safety supervision and management department
9. Mining right price evaluation report and confirmation documents
10. Reserve occupation registration form (the form should be filled in by the county land and resources management department on the computer)
11. Approval documents for delimitation of mining area
12. Mining right transfer contract
13. Confirmation of transaction for participating in bidding and auction< br /> 14
6. The first space is needn; T or don & # 39; Do I have to go now
-- no, you can keep it here

for reference.
7. College Code: 8051 college Name: High Tech College of Xi'an University of science and technology
number of three batch undergraate enrollment plans: 837
College Address: box 39, middle Ziwu Avenue, Chang'an District, Xi'an City, Shaanxi Province
College website www.gx-xust.com
professional name planner's foreign language charge standard of mathematics system
[04] microelectronics 61 four years unlimited 10000 yuan / year
[05] mining engineering 56 four years unlimited 10000 yuan / year
[06] mechanical design and manufacturing and automation 98 four years unlimited 10000 yuan / year
[07] instrial design 55 four years unlimited 10000 yuan / year
[08] measurement and control technology and instrument 64 four years unlimited 10000 yuan / year
[09] electrical engineering and automation 101 four years unlimited 10000 yuan / year/ Year)
[11] computer science and technology 61 four years unlimited 10000 (yuan / year)
[12] architecture 30 four years unlimited 10000 (yuan / year)
[13] civil engineering 137 four years unlimited 10000 (yuan / year)
[14] surveying and mapping engineering 62 four years unlimited 10000 (yuan / year)
[15] project management 85 four years unlimited 10000 (yuan / year)
[16] financial management 27 8500 yuan / year for four years
8. There is no care for the score. You must be a candidate in the poverty-stricken areas designated by the Ministry of ecation to be eligible for the examination.
9. The main frequency can reach 2.0, and the memory can be 1g. The graphics card is better not to be integrated, and my integrated graphics card can also run. one hundred and twenty-eight
Hot content
Inn digger Publish: 2021-05-29 20:04:36 Views: 341
Purchase of virtual currency in trust contract dispute Publish: 2021-05-29 20:04:33 Views: 942
Blockchain trust machine Publish: 2021-05-29 20:04:26 Views: 720
Brief introduction of ant mine Publish: 2021-05-29 20:04:25 Views: 848
Will digital currency open in November Publish: 2021-05-29 19:56:16 Views: 861
Global digital currency asset exchange Publish: 2021-05-29 19:54:29 Views: 603
Mining chip machine S11 Publish: 2021-05-29 19:54:26 Views: 945
Ethereum algorithm Sha3 Publish: 2021-05-29 19:52:40 Views: 643
Talking about blockchain is not reliable Publish: 2021-05-29 19:52:26 Views: 754
Mining machine node query Publish: 2021-05-29 19:36:37 Views: 750