How to let the savage dig with the blue drill
Green construction is to implement the incremental control of construction waste in the process of engineering construction. In order to implement the rection responsibilities of all parties, the opinions require the construction units to take corresponding measures in source rection of construction waste (source rection measures include design deepening, construction organization optimization, permanent and temporary combination, reuse of temporary facilities and revolving materials, construction process control, etc.), classified collection and storage, on-site disposal, emission control, etc; It also guides the participants to adopt advanced technology, process, equipment and management measures, and apply technical force to rece construction waste. Among them, around the suggestion of "encouraging the detailed classification of construction waste based on end-of-life disposal", the manual has also formulated the detailed rules for the classified collection and storage of construction waste on the construction site, which will also provide help for the resource utilization and waste classification of construction waste. In addition, the manual also makes deployment from the aspects of the preparation of the construction site construction waste rection special scheme, source rection, on-site disposal and emission control
only when stock management and increment control go hand in hand can we do a good job in recing construction waste and promote the transformation and upgrading of green construction and construction instry. On this basis, the construction waste management system should also be improved: through the implementation of construction waste rection in the whole cycle of construction waste collection, transportation, resource utilization and disposal management, China's construction waste management capacity can be improved as a whole, and the construction instry will also make e contributions to resource conservation and environmental protection
you can just hit the diamond drill, and you should also pay attention to the case. If you make a mistake, it won't work
3000W +
now at least 80e
you mean robots
pets
the cheapest zone is 50 RMB
PS: in the original version, digging hellrock with a diamond pick with efficiency V will also block diamonds. I always use this method.