Position: Home page » Equipment » How to excavate for Kangding hydropower station in Sichuan

How to excavate for Kangding hydropower station in Sichuan

Publish: 2021-03-28 12:58:33
1.

"Miner": a miner. It's a noun

"mining": mining mineral resources. It's a verb

2. According to common sense, it's deceptive.
3.

(1) General situation the No.134 vein extension exploration area is located at 290 north-west of Kangding County ° The direction is 70 kilometers away, belonging to Tagong Township, Kangding County. From the mining area to s215 provincial road, there are 33 kilometers of simple roads, 108 kilometers from Tagong to Kangding, and 477 kilometers to Cheng, with convenient transportation. The mining area is 4100-4820 meters above sea level, with relatively bad climate, large temperature difference between day and night, and poor working conditions. It is a famous lightning strike area in China, with backward economy and mainly Tibetan nomads

108 geological team of Sichuan Bureau of Geology and mineral exploration and development explored the ore blocks below the mining right. The exploration mineral is spomene, and the degree of work is exploration. The exploration fund is 9.75 million yuan

(2) achievement description

the ore deposits are mainly granite pegmatite type organic mineral deposits, the veins are branched lenticular and vein like, and there are 11 branched small veins distributed in the upper and lower walls of the main vein, of which the main vein is 1003m long, 180-385m deep and 19.5-69.66m thick, with NW tendency and steep dip angle °, The main useful minerals are spomene, beryl and niobium tantalite. The average grade of the deposit is Li < sub > 2 < / sub > o 1.42%, BeO 0.04%, Nb < sub > 2 < / sub > o < sub > 5 < / sub > 0.012%, Ta < sub > 2 < / sub > o < sub > 5 < / sub > 0.005%, respectively. Lithium beryllium is easy to be beneficiated. According to the evaluation of Sichuan Mineral Resources Evaluation Center (CBR [2011] No. 216): the original mining right reserves: (111b + 333) ore amount is 5.261 million tons, Li < sub > 2 < / sub > O resources amount is 77207 tons, associated BeO resources amount is 2397 tons, Nb < sub > 2 < / sub > o < sub > 5 < / sub > 723 tons, Ta < sub > 2 < / sub > o < sub > 5 < / sub > 353 tons; The newly added resources in the exploration right (extended exploration section): (111b + 122b + 333) ore amount is 23.734 million tons, Li < sub > 2 < / sub > O resources amount is 335066 tons, associated BeO resources amount is 10376 tons, Nb < sub > 2 < / sub > o < sub > 5 < / sub > 2803 tons, Ta < sub > 2 < / sub > o < sub > 5 < / sub > 1151 tons. Lithium resources have reached the scale of large-scale deposits, and associated minerals have reached the scale of medium-sized or above

(3) the brief process of achievement the exploration work lasted for five months, and the formal exploration results reviewed by Sichuan mineral resources and reserves evaluation center have been submitted to the client (all exploration results are kept by the company)

4. If you take a bus, get off at Kangding gasgou at Cheng Xinnanmen station, and then transfer to the fifth Hydropower Bureau. If you drive by yourself, you can go from Cheng via Ya'an to gasgoukou to Guza Town, and then to the fifth Hydropower Bureau
5. If the passenger's bus gets off at Cheng Xinnanmen station, then transfer to Kangding gas ditch hydropower station 5. In the case of their own car, and then five hydropower from Cheng to go through Ya'an guzan town gas gully
6. After. Lianghekou Hydropower Station is located in Yajiang County, Ganzi Prefecture, Sichuan Province. From Yichang to Cheng, then through Ya'an and Kangding, it is Yajiang County.
7. Introction: Sichuan Datang International Ganzi Hydropower Development Co., Ltd. is one of the five largest power generation companies in China - China Datang Group's grass-roots enterprise in Sichuan. The company is controlled by Datang International Power Generation Co., Ltd., the flagship listed company of China Datang Group. At present, it mainly develops two power stations of China Datang Group Corporation on Da River in Sichuan Province: Changheba Hydropower Station (with installed capacity of 2600mw) and Huangjinping Hydropower Station (with installed capacity of 850mw), with a total investment of about 33 billion yuan. The two power stations are expected to be put into operation successively in 2015
legal representative: Duan Zhongmin
time of establishment: July 3, 2006
registered capital: RMB 1625063300
Instrial and commercial registration number: 513300000000634
enterprise type: other limited liability company
address: Guza Town, Kangding County, Ganzi Prefecture, Sichuan Province
8. Introction: China Huaneng Sichuan Kangding hydropower Co., Ltd. was established in April 1997. Huaneng Sichuan Hydropower Co., Ltd. and Ganzi State Water Conservancy and Hydropower Development Corporation are set up according to the investment ratio of 6:4 to take charge of the basin, cascade, comprehensive and coordinated development and management of gas River hydropower station, a first-class tributary of Da River in Ganzi Tibetan Autonomous Prefecture
legal representative: ran Qun
time of establishment: April 14, 1997
registered capital: RMB 194 million
Instrial and commercial registration number: 513300000004068
enterprise type: limited liability company (state holding)
address: yuanyangba, Kangding County, Ganzi Prefecture, Sichuan Province, China
9. Sichuan Jiulonghe Hydropower Development Co., Ltd. / government office building / 3322820
Daofu Xianshuihe power plant / three kilometers of Ya road / 7122381
Sichuan Jiulong Hydropower Development Co., Ltd. / gaer town of Jiulong County / (0835) 8856287
Jiulong Chuanjiang Hydropower Development Co., Ltd. / Wanba township / 13056570859
water resources and Hydropower Development Service Company of Luhuo Hydropower Bureau / Xin Zhenjian Shelu 49 / 7322745
Luneng Hydropower Development Co., Ltd. / doushuiyan, Donggu Township, Danba county / 13618132933
Sichuan Huaneng Kangding hydropower Co., Ltd. / yuanyangba / 2855703
jintanghe hydropower station in Kangding County / xinxingxia village, pengta Township, Kangding County / 2822490
luoxu hydropower station in Shiqu County / luoxu town /
ganzijun sub district hydropower station / simaqiao / 2838224-31 162
wadianzi power station / wadianzi / 2821786
CHENBA power station in Luding County / group 2, Ercun village, Chengba Township, Luding County / 3124007
wengqu hydropower station in Shiqu County / NiGa town / 22166
Yugen power station / Yugen power station in Derong County /
Tianba power station in Tianba countryside of Luding County / Tianba in Tianba countryside / 3122747
Seda hydropower station / Qianjin Street / 852 2164
longdonggou power station / longdonggou / 2831308
najiaoxi power plant in Batang County / Zhongza Township in Batang County / 5622997
Litang County secondary power plant / 140 Qianjin Road in Gaocheng town / 5322642
yuezha Township hydropower station in Danba county / yuezhaba village in yuezha township /
xiawulong power plant in Shiqu County / NiGa town / 22819
Cuola power plant in Batang County / Cuola District/ 5655352
bath Hall of Litang first class power plant / Qianjin Road of Gaocheng town /
Kangding Xinqiao power plant / Xinqiao town / 2866748
gas power station in Guza town of Kangding County / xiagasgoukou of Guza town / 2855968
chenjiaheba power station of Luding County Power company / Moxi town of Luding County / 3122925
Bawang power station in Danba county / Shuijia village in Bawang township /
Ganzi County Shenghang power station / shenghang village / 2823443
Wandong power station in Detuo township of Luding County / Wandong power station in Detuo township of Luding County / 3255799
Tiequan power station in Yajiang County / Chengxiang village in Hekou town /
Sanhe township power station / Jintang Sanhe township / (0836) 2853085
sanqiao power station / sanqiao power station in Yajiang County /
Litang first class power station / 140 Qianjin Road / 532 in Gaocheng town two thousand eight hundred and four
Hot content
Inn digger Publish: 2021-05-29 20:04:36 Views: 341
Purchase of virtual currency in trust contract dispute Publish: 2021-05-29 20:04:33 Views: 942
Blockchain trust machine Publish: 2021-05-29 20:04:26 Views: 720
Brief introduction of ant mine Publish: 2021-05-29 20:04:25 Views: 848
Will digital currency open in November Publish: 2021-05-29 19:56:16 Views: 861
Global digital currency asset exchange Publish: 2021-05-29 19:54:29 Views: 603
Mining chip machine S11 Publish: 2021-05-29 19:54:26 Views: 945
Ethereum algorithm Sha3 Publish: 2021-05-29 19:52:40 Views: 643
Talking about blockchain is not reliable Publish: 2021-05-29 19:52:26 Views: 754
Mining machine node query Publish: 2021-05-29 19:36:37 Views: 750