当前位置:首页 » 挖矿知识 » 别再晚上挖矿翻译

别再晚上挖矿翻译

发布时间: 2021-07-09 15:26:21

1. 翻译练习(中译英) 别用翻译软件糊弄人

1、This channel is too boring.Let us change another one.2、I find information with computer everyday.3、Do you know when did the CD issue?4、Exercise in morning is good for our health.5、Do you want me to speak for a mobile phone on the internet?6、Do you mind telling me how to use a computer?7、I believe we learned from many things there.8、This kind of computers are made from Shanghai.9、My english book is stored in some place of classroom.10、This clock is used to wake me up every morning.11、English is my favorate subject.12、Do you know how to play football?13、Liu Dehua wiil play a leading role in this film.14、These words must be written in blackboard.15、Those flowers should be watered every day.16、His homework has been finished.17、Cleaning the room tomorrow.18、Those trees are planted last year.19、Is that work going to be finished tomorrow?20、He went to play football after finished homework.21、He was forced to work 16 hours a day.22、My father used to take a walk after dinner.23、My brother was very friendly to me over the past.24、In his whole life,he had operated on more than 1000 patients in total.25、My mother in a hospital over the past.26、My brother used to talking in class.27、I used to read English in the evening.28、English is so important that you have to learn it well.29、My sister works in the plane, she used to work on the airplane and not afraid of flying.30、Our teachers are always concerned about others and want to help them. 全都是我自己翻译的哟、!

2. 采矿用英语怎么说

您好!
很高兴为你翻译、解释。您提出的采矿用英语怎么说?

只有专业说法:mining(汉字注音:埋岭)最准确。(汉语含义:n.采矿, 矿业)可做动名词。
英语的其他表达方式均不能准确地表达“采矿”的动名词。

例如:mine pron.我的;n.矿, 矿山, 矿井, 源泉, 宝库, 地雷, 水雷;vt.挖掘, 开采, 在...布雷, 破坏
vi.开矿, 埋设地雷等,只适合做“开矿”的动词

希望我的翻译、解释对你有帮助,祝你心想事成!

3. 英语采矿翻译decline

你好!
在这里我把decline所有的意思都给到你吧,你再去配,总会有一个意思是你所想的
n.下降,衰退,斜面
vi.下降,衰落,谢绝
vt.谢绝,婉拒
如:in decline 下降,在衰退中
proction delcline (在油气,矿业,经济行业中)产量递减
decline trend 递减趋势
谢谢,希望能够帮到你!!

4. 别在晚上挖矿英文歌词

Tonight, I feel close to you
演唱:孙燕姿,仓木麻衣

Close my eyes and feel your mind
Time has passed
I walk like a shadow
Never knew what I am going through
You touch my heart and take my breath away

Whisper on the wind so softly
Let the bright stars fill our dreams with love
Reach for your hand (You're holding my key)
And you show me the way

Tonight, I feel close to you
You open my door and light the sky above
When I need a friend, you are there right by my side
I wish we could stay as one
I wish we could stay forever as one

All the tears that haunt my past
You promised it'll be better tomorrow
Play that song
You and I listened to
And let it gently ease our pain

Tender rain drops from the blue skyaa
Flowers blooming, life is so divine
Like sunlight on a stream (You're holding my key)
You show the world to me

Tonight, I feel close to you
You open my door and light the sky above
When I need a friend, you are there right by my side
I wish we could stay as one

So much love in this beautiful world
Search for the brightest star in the sky
You will find the meaning of love
Don't be afraid (Don't be afraid)
Just be yourself (Just be yourself)
We need this love I've never knew

Tonight, I feel close you
You open my door and light the sky above
When I need a friend, you are there right by my side
I wish we could stay as one
Tonight, I feel close to you
You open my door and light the sky above
When I need a friend, you are there right by my side
I wish we could stay as one
I wish we could stay forever as one

5. 采矿专业翻译

中等深度钻孔空场采矿法
短孔留矿回采法

open stoping
空场采矿法
shrinkage stoping
仰采留矿回采法

shrinkage stoping
留矿回采

shrinkage stoping
留矿回采

shrinkage stoping
仓储采煤法
急斜煤层中将采落的煤暂留于已采空间中,待仓房内的煤体采完后,再依次放出存煤的采煤方法。

shrinkage stoping
留矿采矿法

shrinkage stoping
留矿采矿法

6. 求翻译 采矿专业不要用软件翻译的那种 加分题

proposed mathematical model and the developed
提出了数学模型和发展

program, a number of Chinese cases with varying
计划,大量的中文例不同

coal seam inclinations are presented in this section.
介绍了煤层倾向这部分。

In these cases, the empirical values for the limit angles
在这些情况下,实证价值限制角度

(􀈖L and 􀈖H) in different coal districts are used.
(􀈖L和􀈖H)地区在不同煤used.

Case 1: The typical final surface movements and
例1:典型的最终表面运动和

deformation profiles along a major transverse
沿着主要的横向变形型材

cross-section in Fengfeng mining district is presented
峰峰矿区截面模型

in Fig. 5.
图5。

The inclination of the coal seam is a
煤层的爱好是a

moderate 11° and the overburden depth on the lower
11°和适度的层深度低

panel edge is 750 ft (229 m).
面板边750英尺(229米)。

The mining height and
采矿高度和

panel width are 5.5 ft (1.7 m) and 600 ft (183 m),
面板宽度5.5英尺(1.7米)和600英尺(183米)

respectively.
分别。

The lower (left) and upper (right) panel
较低的(左)和上(右)面板

edges are also shown in the figure.
边缘也中显示的图表。

All three profiles
所有三个侧面

show that this is a subcritical subsidence event.
表明,这是一个亚临界沉降的事件。

The


maximum subsidence is 2.57 ft (0.78 m) located
最大沉降是2.57英尺(0.78米)的所在地

about 270 ft (82 m) from the left panel edge.
大约270英尺(82米)从左侧面板的边缘。

The


maximum horizontal displacements (H.D.) on both
最大水平位移(H.D.)两者兼具

sides of the panel edges are about 1.1 ft (0.335 m).
该小组的两侧边缘大约1.1英尺(0.335米)。

The maximum tensile strains on the lower and upper
的最大拉伸处于上下

sides of the panel are 6.37x10–3 and 7.02x10–3 ft/ft
该小组的两侧分别为6.37和7.02英尺/ x10-3 x10-3呎

(m/m), respectively.
(m / m),分别为。

The maximum compressive
最大压

strain is 1.18x10–2 ft/ft (m/m) which is nearly double
x10-2应变是1.18英尺/英尺(m / m)的两倍

of the maximum tensile strains.
的最大拉伸应变。

Case 2: Fig. 6 shows the predicted final surface
例2:图6显示预测最后的表面

and deformation profiles for a typical subsidence
一个典型和变形型材下陷

case in Jixi mining district.
鸡西矿区案例。

In this case, the coal
在这种情况下,煤

seam dips at an angle of 18°.
角焊缝会时不时地18°。

The depth on the
深度的

deeper side is 400 ft (122 m).
更深的侧面400英尺(122米)。

The mining height is
采矿的身高是

4.5 ft (1.37 m).
十4.5英尺(1.37米)。

The panel is again 600 ft.
委员会又600英尺。

Due to the
由于

relatively small depth; the resulting subsidence basin
相对较小的深度、产生的沉降盆地

is a supercritical one.
是一种超临界之一。

However, the flat bottom portion
然而,平底分

of a supercritical subsidence basin is not necessarily
超临界沉陷盆地的也不是必然的

flat but the maximum subsidence there decreases
但最高有平沉降减少

as the depth increases.
随着深度增加。

The subsidence profile
开采沉陷剖面

on the deeper side is much gentler than that on
在更深的一边比多温和

the shallow side.
浅的一面。

Another observation is that the
另一个观察,

maximum horizontal displacement, tensile and compressive
最大水平位移、拉伸和压缩

strains on the deeper side are smaller that
处于更深的侧小

those on the shallower side as expected.
那些在较浅的侧与预期相符。

Case 3: The typical surface movement and deformation
案例3:典型的地表移动和变形性

profiles for Fuxin mining district are shownin Fig. 7.
阜新矿区型材是shownin图7。

The input parameters for this case are: 􀄮=
在这种场合下的输入参数are:􀄮=

2􀀘°, h1 = 1050 ft (320 m), W = 600 ft (183 m) and m
2􀀘°,h1 = 1050英尺(320 m),W = 600英尺(183 m)和m

= 5.85 ft (1.78 m).
= 5.85英尺(1.78米)。

Due to much larger depth, the
由于更大的深度

degree of subcritical condition is even more than
亚临界条件的程度甚至比

Case 1.
病例1。

Under the influences of larger depth and
影响下的深度和更大的

dipping angle, the center of the subsidence basin
浸渍角、沉降中心的盆地

shifted toward the deeper side from the center of the
转向给球队越深的中心

panel by a distance of about 103 ft (31 m).
板的长距约103英尺(31米)。

The peak


tensile strain and horizontal displacement move beyond
拉应变水平位移和超越

the panel edge on the deeper side.
面板边缘更深的一面。

It should
它应该

also be noted that two small steps (discontinuities)
也注意到的是,两个小步骤(面)

were observed on the strain profile which is resulted
观察应变简介这是结果

from the discontinuity problem of the first derivative
从不连续问题的一阶导数

of the adjusted influence function at its “center’ in
调整功能的影响其“中心”

the current version.
当前的版本。

7. 游戏我的世界《别在晚上挖矿》旋律很熟悉,这首歌有原唱么叫什么

不,这是【Don't Mine At Night】翻译:【别在夜晚挖矿】

8. 急求采矿专业英语翻译

6.1
Rock
Mass
Classification
6.1岩石分级
1.Introction介绍
During
the
feasibility
and
preliminary
design
stages
of
a
project,
when
very
little
detailed
information
is
available
on
the
rock
mass
and
its
stress
and
hydrologic
characteristics
,the
use
of
a
rock
mass
classification
scheme
can
be
of
considerable
benefit.
在一个项目的可行性和初级设计阶段,当获得有关岩体和水文特性的资料非常少的时候,那么一本岩石分级方案是相当大的益处.

9. 采矿英语翻译

This design altogether nine chapters, respectively are the general remarks, the technical economy, the mining geology, mining, the mining slope ramp design, the mine ventilation design, the mining machinery, the assembly drawing transportation, safe specially. And mining, the mining machinery, the mining slope ramp project are the design main bodies, in mining used advanced low poor has damaged the non-lower column partition to come down the law, will have the huge economic efficiency, the special mining slope ramp project, mainly included the slope ramp position the determination, the slope ramp form choice, the slope ramp cross section specification, the slope ramp slope, slope ramp aspect and so on curve design, slope ramp construction contents. Some parts of designs contain the essential blueprint, the blueprint must defer to the concerned requirements plan.

10. 英语翻译:别在晚上走山路,你很容易迷路

don't drive/walk on mountain roads at night,otherwise u'll be easy to lost ur way./u'll be lost easily.

热点内容
doge漫画高清 发布:2025-06-28 01:00:29 浏览:776
eth公链升级 发布:2025-06-28 00:44:25 浏览:946
矿机释放币 发布:2025-06-28 00:41:12 浏览:299
能量矿池是崛起币吗 发布:2025-06-28 00:39:59 浏览:983
1660挖比特币 发布:2025-06-28 00:38:28 浏览:697
二手矿机商场 发布:2025-06-28 00:29:32 浏览:356
矿机最大的多少吨 发布:2025-06-28 00:18:01 浏览:826
amd旧版eth驱动 发布:2025-06-28 00:15:26 浏览:84
以太坊批量操作 发布:2025-06-28 00:04:40 浏览:218
创始人抛售btc 发布:2025-06-27 23:55:53 浏览:873