当前位置:首页 » 挖矿知识 » 挖矿用英语怎么

挖矿用英语怎么

发布时间: 2021-08-09 22:39:34

❶ 采矿业的英语翻译 采矿业用英语怎么说

采矿业

[工经][矿业] mining instry更多释义>>

[网络短语]

  • 采矿业mining;Mining Instry;Mining and Quarrying

  • 采矿业协会National Mining Association

  • 采矿业发展mining instry development

❷ 救命啊。英语翻译,关于采矿的

下载一个,有道翻译官软件,或者网络拍照翻译

❸ 采矿专业 英语翻译

本设计是达茂铁矿露天开采的工艺与开拓设计,年产量200万吨。This opencut exploitation and pioneer design is applied to Damao Iron Mine, with an annual output of approximately 2 million tons.
采用境界剥采比不大于经济合理剥采比的原则圈定露天开采境界。Open-pit boundary is contoured with the application of the rule of boundary stripping ratio less than or equal to economic stripping.
并进行可采储量及平均剥采比的计算。And make a caculation of proved reserves and average stripping ratio.

用矿山延伸速度验证生产能力。Throughput is verified by extension rate of the mine.

编制露天矿采掘进度计划时,平均剥采比乘系数的方法初定生产剥采比,电铲的效率根据类似矿山选取。 When working out the open-pit excavation schele, proction stripping ratio is initially decided by the approach of average stripping ratio mutiplied by coefficient while efficiency of electric shovel selected on the basis of similar mines.
本矿采用斜坡汽车螺旋坑线开拓。 The mine is exploited by vehicles along the slope of the spiral pit-line.
工艺部分包括穿孔设备选型及其数量的计算、电铲设备的选型及其数量的计算、汽车数量的计算及选型、推土机选型及数量计算、辅助设备的选型及数量的计算等。Techniques include the selection and caculation of drilling equipments,electric shovels,vehicles,bulldozer as well as assistant auxiliary equipments.
爆破方法是选择及药量计算,运输调车方式是选择,排土方法的选择及排土计算。 Blasting method is the selection of dosage and caculation;shunting method is the selection as well as the selection of mping and and mping caculation.
关键词:露天开采 开拓 工艺 采掘进度计划
Key words: open-pit exploitation;excavation;techniques;excavation schele

同学,累死我了;一个多小时翻译的你的这篇文章,^_^。

❹ 采矿用英语怎么说

您好!
很高兴为你翻译、解释。您提出的采矿用英语怎么说?

只有专业说法:mining(汉字注音:埋岭)最准确。(汉语含义:n.采矿, 矿业)可做动名词。
英语的其他表达方式均不能准确地表达“采矿”的动名词。

例如:mine pron.我的;n.矿, 矿山, 矿井, 源泉, 宝库, 地雷, 水雷;vt.挖掘, 开采, 在...布雷, 破坏
vi.开矿, 埋设地雷等,只适合做“开矿”的动词

希望我的翻译、解释对你有帮助,祝你心想事成!

❺ 急求采矿专业英语翻译

6.1
Rock
Mass
Classification
6.1岩石分级
1.Introction介绍
During
the
feasibility
and
preliminary
design
stages
of
a
project,
when
very
little
detailed
information
is
available
on
the
rock
mass
and
its
stress
and
hydrologic
characteristics
,the
use
of
a
rock
mass
classification
scheme
can
be
of
considerable
benefit.
在一个项目的可行性和初级设计阶段,当获得有关岩体和水文特性的资料非常少的时候,那么一本岩石分级方案是相当大的益处.

❻ 采矿专业英语翻译

开采活动与各中段设备的标准化与专业化(下部中段或开拓中段,上部中段或生产开采中段),与无轨运输系统共同创造了极大的灵活性。

❼ 采矿专业英语翻译(在线等,急)

The design for the underground mining design, design task is to flag the sheep-city tower Bao coal mine, the mine located in the Ordos City, Inner Mongolia Autonomous Region Zhungeer flag, administrative division under the flag of the sheep Zhungeer the town of Tower City.
Mine with an annual output of 450,000 tons proction scale exploitation of length of service was 36.9 years, designed with Adit pioneering system, multi-level mining, tape machine transport as the main mode of transport, mining methods adopted by the long arm of a single integrated mechanized mining methods, out - Ventilation and the ventilation fan combination of ventilation systems, multi-stage pump water drainage system Yang, design completed a total of eight drawings, design specification 79.
Key words; development, mining methods, the ventilation system

❽ 采矿英语翻译

This design altogether nine chapters, respectively are the general remarks, the technical economy, the mining geology, mining, the mining slope ramp design, the mine ventilation design, the mining machinery, the assembly drawing transportation, safe specially. And mining, the mining machinery, the mining slope ramp project are the design main bodies, in mining used advanced low poor has damaged the non-lower column partition to come down the law, will have the huge economic efficiency, the special mining slope ramp project, mainly included the slope ramp position the determination, the slope ramp form choice, the slope ramp cross section specification, the slope ramp slope, slope ramp aspect and so on curve design, slope ramp construction contents. Some parts of designs contain the essential blueprint, the blueprint must defer to the concerned requirements plan.

❾ 用采矿专业英语翻译

煤炭是我国国民经济的基础产业,然而,我国的煤炭资源在开发利用过程中却存在着不少问题
Coal is basic instry of our national economy, however, there are many problems in the process of exploitation and utilization.

为了能源的可持续供给,只有中国煤炭工业可持续发展,才能满足煤炭的可持续供给, 这是中国的现实和未来
In order to supply energy continuously, The only way is sustainable development of China coal instry to satisfy sustainable supply, which is reality and future of China.

调整产业结构,加快产业转型,内增企业活力,外增吸纳生产要素的活力,加快走新型化工业道路,走多元化道路,培育发展多个支柱产业,才能使煤炭企业走上全面、协调、可持续发展的道路
To adjust the instrial structure, and speed up the instry transition, increase the enterprise's vitality inside and absorb vitality of proction factor from the abroad, accelerate going new type of instrial road and diverse road, and cultivate some pillar instries, so It is possible to go the road that is comprehensive, balanced and sustainable development for the coal enterprises.

若有所帮助,请采纳,若需完善,请hi我.

❿ 采矿工程专业英语翻译

今天的正北方向的一大圈是一个参考指引方向的测量。方向表示为程度的轴承角度和程度的方位角。Fig.7.1显示了一大圈之间的关系,举例说明了方位和轴承圈。
从Fig.7.1,我们可以发现增加方位圈以顺时针时尚,从正北,在0°,该病的大圆周围90°在适当的东部,到180°在适当的南方,以7°西方国家在适当360°(或回0°)在正北。因此,如果一条线据说有一个方位为160°00°(一百六十个度和零分钟),它的指示
将之间应有东、南但接近罗依由于由于南部。
同样,也可以看到,Fig.7.1轴承圆共分为4个部分:东北(北东向)象限,东南(SE)象限,西南(软件)象限和西北(NW)象限. 轴承从零增长不象限顺时针方向旋转90度正北°在适当的东方。在SE象限,轴承角度增加从零逆时针方向度正南向90°在东方在西南象限,轴承增加从0°角顺时针方向旋转90°在正南向在适当的西部,在西北方向移动象限,轴承增加从0°角逆时针方向在适当的北至90°在适当的西部。
因为这个伟大的循环包括方位,轴承圈子,它可以表达了无论从方向或轴承和容易方位转换的方位到轴承的角度出发,反之亦然。我们必须了解这明明的相互关系,因为测量计算方面所作的azimuths改变方向角在确定的台词的角色,但一栏,线的方向上通常是写在轴承。

热点内容
2010年买比特币方法 发布:2025-08-05 16:05:37 浏览:521
比特币现金价格趋势 发布:2025-08-05 16:03:59 浏览:431
区块链的三个阶段指什么 发布:2025-08-05 15:58:15 浏览:830
国家持有比特币 发布:2025-08-05 15:46:57 浏览:128
trx币是骗局吗 发布:2025-08-05 15:45:48 浏览:113
区块链散热 发布:2025-08-05 15:11:03 浏览:126
学会使用区块链钱包 发布:2025-08-05 15:10:14 浏览:58
数字货币矿机更新速度 发布:2025-08-05 15:09:26 浏览:127
卖房子买比特币200万 发布:2025-08-05 14:48:27 浏览:581
比特币3分赛车能玩吗 发布:2025-08-05 14:46:49 浏览:357