別再晚上挖礦翻譯
1. 翻譯練習(中譯英) 別用翻譯軟體糊弄人
1、This channel is too boring.Let us change another one.2、I find information with computer everyday.3、Do you know when did the CD issue?4、Exercise in morning is good for our health.5、Do you want me to speak for a mobile phone on the internet?6、Do you mind telling me how to use a computer?7、I believe we learned from many things there.8、This kind of computers are made from Shanghai.9、My english book is stored in some place of classroom.10、This clock is used to wake me up every morning.11、English is my favorate subject.12、Do you know how to play football?13、Liu Dehua wiil play a leading role in this film.14、These words must be written in blackboard.15、Those flowers should be watered every day.16、His homework has been finished.17、Cleaning the room tomorrow.18、Those trees are planted last year.19、Is that work going to be finished tomorrow?20、He went to play football after finished homework.21、He was forced to work 16 hours a day.22、My father used to take a walk after dinner.23、My brother was very friendly to me over the past.24、In his whole life,he had operated on more than 1000 patients in total.25、My mother in a hospital over the past.26、My brother used to talking in class.27、I used to read English in the evening.28、English is so important that you have to learn it well.29、My sister works in the plane, she used to work on the airplane and not afraid of flying.30、Our teachers are always concerned about others and want to help them. 全都是我自己翻譯的喲、!
2. 采礦用英語怎麼說
您好!
很高興為你翻譯、解釋。您提出的采礦用英語怎麼說?
只有專業說法:mining(漢字注音:埋嶺)最准確。(漢語含義:n.采礦, 礦業)可做動名詞。
英語的其他表達方式均不能准確地表達「采礦」的動名詞。
例如:mine pron.我的;n.礦, 礦山, 礦井, 源泉, 寶庫, 地雷, 水雷;vt.挖掘, 開采, 在...布雷, 破壞
vi.開礦, 埋設地雷等,只適合做「開礦」的動詞
希望我的翻譯、解釋對你有幫助,祝你心想事成!
3. 英語采礦翻譯decline
你好!
在這里我把decline所有的意思都給到你吧,你再去配,總會有一個意思是你所想的
n.下降,衰退,斜面
vi.下降,衰落,謝絕
vt.謝絕,婉拒
如:in decline 下降,在衰退中
proction delcline (在油氣,礦業,經濟行業中)產量遞減
decline trend 遞減趨勢
謝謝,希望能夠幫到你!!
4. 別在晚上挖礦英文歌詞
Tonight, I feel close to you
演唱:孫燕姿,倉木麻衣
Close my eyes and feel your mind
Time has passed
I walk like a shadow
Never knew what I am going through
You touch my heart and take my breath away
Whisper on the wind so softly
Let the bright stars fill our dreams with love
Reach for your hand (You're holding my key)
And you show me the way
Tonight, I feel close to you
You open my door and light the sky above
When I need a friend, you are there right by my side
I wish we could stay as one
I wish we could stay forever as one
All the tears that haunt my past
You promised it'll be better tomorrow
Play that song
You and I listened to
And let it gently ease our pain
Tender rain drops from the blue skyaa
Flowers blooming, life is so divine
Like sunlight on a stream (You're holding my key)
You show the world to me
Tonight, I feel close to you
You open my door and light the sky above
When I need a friend, you are there right by my side
I wish we could stay as one
So much love in this beautiful world
Search for the brightest star in the sky
You will find the meaning of love
Don't be afraid (Don't be afraid)
Just be yourself (Just be yourself)
We need this love I've never knew
Tonight, I feel close you
You open my door and light the sky above
When I need a friend, you are there right by my side
I wish we could stay as one
Tonight, I feel close to you
You open my door and light the sky above
When I need a friend, you are there right by my side
I wish we could stay as one
I wish we could stay forever as one
5. 采礦專業翻譯
中等深度鑽孔空場采礦法
短孔留礦回採法
open stoping
空場采礦法
shrinkage stoping
仰采留礦回採法
shrinkage stoping
留礦回採
shrinkage stoping
留礦回採
shrinkage stoping
倉儲採煤法
急斜煤層中將采落的煤暫留於已采空間中,待倉房內的煤體采完後,再依次放出存煤的採煤方法。
shrinkage stoping
留礦采礦法
shrinkage stoping
留礦采礦法
6. 求翻譯 采礦專業不要用軟體翻譯的那種 加分題
proposed mathematical model and the developed
提出了數學模型和發展
program, a number of Chinese cases with varying
計劃,大量的中文例不同
coal seam inclinations are presented in this section.
介紹了煤層傾向這部分。
In these cases, the empirical values for the limit angles
在這些情況下,實證價值限制角度
(L and H) in different coal districts are used.
(L和H)地區在不同煤used.
Case 1: The typical final surface movements and
例1:典型的最終表面運動和
deformation profiles along a major transverse
沿著主要的橫向變形型材
cross-section in Fengfeng mining district is presented
峰峰礦區截面模型
in Fig. 5.
圖5。
The inclination of the coal seam is a
煤層的愛好是a
moderate 11° and the overburden depth on the lower
11°和適度的層深度低
panel edge is 750 ft (229 m).
面板邊750英尺(229米)。
The mining height and
采礦高度和
panel width are 5.5 ft (1.7 m) and 600 ft (183 m),
面板寬度5.5英尺(1.7米)和600英尺(183米)
respectively.
分別。
The lower (left) and upper (right) panel
較低的(左)和上(右)面板
edges are also shown in the figure.
邊緣也中顯示的圖表。
All three profiles
所有三個側面
show that this is a subcritical subsidence event.
表明,這是一個亞臨界沉降的事件。
The
這
maximum subsidence is 2.57 ft (0.78 m) located
最大沉降是2.57英尺(0.78米)的所在地
about 270 ft (82 m) from the left panel edge.
大約270英尺(82米)從左側面板的邊緣。
The
這
maximum horizontal displacements (H.D.) on both
最大水平位移(H.D.)兩者兼具
sides of the panel edges are about 1.1 ft (0.335 m).
該小組的兩側邊緣大約1.1英尺(0.335米)。
The maximum tensile strains on the lower and upper
的最大拉伸處於上下
sides of the panel are 6.37x10–3 and 7.02x10–3 ft/ft
該小組的兩側分別為6.37和7.02英尺/ x10-3 x10-3呎
(m/m), respectively.
(m / m),分別為。
The maximum compressive
最大壓
strain is 1.18x10–2 ft/ft (m/m) which is nearly double
x10-2應變是1.18英尺/英尺(m / m)的兩倍
of the maximum tensile strains.
的最大拉伸應變。
Case 2: Fig. 6 shows the predicted final surface
例2:圖6顯示預測最後的表面
and deformation profiles for a typical subsidence
一個典型和變形型材下陷
case in Jixi mining district.
雞西礦區案例。
In this case, the coal
在這種情況下,煤
seam dips at an angle of 18°.
角焊縫會時不時地18°。
The depth on the
深度的
deeper side is 400 ft (122 m).
更深的側面400英尺(122米)。
The mining height is
采礦的身高是
4.5 ft (1.37 m).
十4.5英尺(1.37米)。
The panel is again 600 ft.
委員會又600英尺。
Due to the
由於
relatively small depth; the resulting subsidence basin
相對較小的深度、產生的沉降盆地
is a supercritical one.
是一種超臨界之一。
However, the flat bottom portion
然而,平底分
of a supercritical subsidence basin is not necessarily
超臨界沉陷盆地的也不是必然的
flat but the maximum subsidence there decreases
但最高有平沉降減少
as the depth increases.
隨著深度增加。
The subsidence profile
開采沉陷剖面
on the deeper side is much gentler than that on
在更深的一邊比多溫和
the shallow side.
淺的一面。
Another observation is that the
另一個觀察,
maximum horizontal displacement, tensile and compressive
最大水平位移、拉伸和壓縮
strains on the deeper side are smaller that
處於更深的側小
those on the shallower side as expected.
那些在較淺的側與預期相符。
Case 3: The typical surface movement and deformation
案例3:典型的地表移動和變形性
profiles for Fuxin mining district are shownin Fig. 7.
阜新礦區型材是shownin圖7。
The input parameters for this case are: =
在這種場合下的輸入參數are:=
2°, h1 = 1050 ft (320 m), W = 600 ft (183 m) and m
2°,h1 = 1050英尺(320 m),W = 600英尺(183 m)和m
= 5.85 ft (1.78 m).
= 5.85英尺(1.78米)。
Due to much larger depth, the
由於更大的深度
degree of subcritical condition is even more than
亞臨界條件的程度甚至比
Case 1.
病例1。
Under the influences of larger depth and
影響下的深度和更大的
dipping angle, the center of the subsidence basin
浸漬角、沉降中心的盆地
shifted toward the deeper side from the center of the
轉向給球隊越深的中心
panel by a distance of about 103 ft (31 m).
板的長距約103英尺(31米)。
The peak
峰
tensile strain and horizontal displacement move beyond
拉應變水平位移和超越
the panel edge on the deeper side.
面板邊緣更深的一面。
It should
它應該
also be noted that two small steps (discontinuities)
也注意到的是,兩個小步驟(面)
were observed on the strain profile which is resulted
觀察應變簡介這是結果
from the discontinuity problem of the first derivative
從不連續問題的一階導數
of the adjusted influence function at its 「center』 in
調整功能的影響其「中心」
the current version.
當前的版本。
7. 游戲我的世界《別在晚上挖礦》旋律很熟悉,這首歌有原唱么叫什麼
不,這是【Don't Mine At Night】翻譯:【別在夜晚挖礦】
8. 急求采礦專業英語翻譯
6.1
Rock
Mass
Classification
6.1岩石分級
1.Introction介紹
During
the
feasibility
and
preliminary
design
stages
of
a
project,
when
very
little
detailed
information
is
available
on
the
rock
mass
and
its
stress
and
hydrologic
characteristics
,the
use
of
a
rock
mass
classification
scheme
can
be
of
considerable
benefit.
在一個項目的可行性和初級設計階段,當獲得有關岩體和水文特性的資料非常少的時候,那麼一本岩石分級方案是相當大的益處.
9. 采礦英語翻譯
This design altogether nine chapters, respectively are the general remarks, the technical economy, the mining geology, mining, the mining slope ramp design, the mine ventilation design, the mining machinery, the assembly drawing transportation, safe specially. And mining, the mining machinery, the mining slope ramp project are the design main bodies, in mining used advanced low poor has damaged the non-lower column partition to come down the law, will have the huge economic efficiency, the special mining slope ramp project, mainly included the slope ramp position the determination, the slope ramp form choice, the slope ramp cross section specification, the slope ramp slope, slope ramp aspect and so on curve design, slope ramp construction contents. Some parts of designs contain the essential blueprint, the blueprint must defer to the concerned requirements plan.
10. 英語翻譯:別在晚上走山路,你很容易迷路
don't drive/walk on mountain roads at night,otherwise u'll be easy to lost ur way./u'll be lost easily.